INNOWT5000 aims to cover the following objectives:
1. To design, manufacture and install a 5MW wind turbine (extendable to 5.5MW) suitable for offshore as well as for on land installations.
2. To develop products and procedures to overcome the barriers of transport and erection of MW class wind turbines
3. To respect the environment fully in line with the European directives, in every aspect, by adopting different philosophy and increased used of new and environmentally friendly materials and by incorporating it in every process of the manufacturing, transport, installation, operation and maintenance phase.
4. To reduce the electricity production costs by optimising the design to competitive levels, i.e. targeting to electricity production costs at below 0.035/kWh when the machine will be marketed.
Fields of science (EuroSciVoc)
CORDIS classifies projects with EuroSciVoc, a multilingual taxonomy of fields of science, through a semi-automatic process based on NLP techniques. See: https://op.europa.eu/en/web/eu-vocabularies/euroscivoc.
CORDIS classifies projects with EuroSciVoc, a multilingual taxonomy of fields of science, through a semi-automatic process based on NLP techniques. See: https://op.europa.eu/en/web/eu-vocabularies/euroscivoc.
- engineering and technologyenvironmental engineeringenergy and fuelsrenewable energywind power
- humanitiesphilosophy, ethics and religionphilosophy
You need to log in or register to use this function
We are sorry... an unexpected error occurred during execution.
You need to be authenticated. Your session might have expired.
Thank you for your feedback. You will soon receive an email to confirm the submission. If you have selected to be notified about the reporting status, you will also be contacted when the reporting status will change.
Topic(s)
Data not availableCall for proposal
Fifth Energie C
See other projects for this call
Funding Scheme
Data not availableCoordinator
HAMBURG
Germany