Institutionalization of best practices for test automation and management

Objetivo

NMS product line is responsible for developing a Cellular Network Management System NMS/2000, which is a large-scale system consisting of almost two million lines of C++ code. The system is developed and maintained incrementally in subsequent projects so that the new system is built on top of the existing one. As the need to create customer specific product variants increases in the near future, the demand for testing is rapidly increasing.

We see that the only alternative to survive with satisfactory development lead times is to improve test management, execution and analysis. Also motivational issues in testing large systems on teams can be better handled when most repetitive testing actions are automated and human creativity can be used for more demanding and interesting tasks, such as test design and fault analysis.

The objective of the Process Improvement Experiment (PIE) is to decrease lead-time and to increase testing efficiency in relation to product complexity and size.

THE EXPERIMENT

In order to meet these objectives, we take separate aspects of testing automation tool support into use in all our four defined testing phases. That includes four separate but partly parallel tasks:

1. a) Collecting the four testing phases into a coherent testing process that sets the requirements for test automation tools and on the other hand b) making the road map for necessary process changes to get any real value of the tool in the longer run: increase testing repeatability and test case traceability, define configuration management policy for test scripts, etc.
2. Evaluating and selecting tool for test automation
3. Building necessary process support for creating tests with the tool: training, tool usage guidelines, testing script libraries, etc.
4. Piloting the tool in parts of two baseline projects, T9 and T10 (around 40 person-months each)
The achievement of the objectives is assessed in testing process assessment before and after the PIE and also in audits during the pilot phase.

The total personnel of 250 in the NMS product line includes 140 software engineers in the baseline projects. The great success factor in favour of the PIE is our PI mind-set: persistence of the process improvement effort with management leadership, dedicated quality and process improvement groups and usage of PI framework.

EXPECTED IMPACT AND EXPERIENCE

We do not expect the piloting of the selected tool to make big quantitative differences in the productivity or efficiency of testing in the PIE time frame, because biggest bottlenecks seem not to be solvable through test automation during the PIE. We hope for bigger gains in the process side: after the PIE we have gained more repeatability in the testing and understand better the potential and demands of test automation in our context. Also as a side-effect we will have better analysed non-technical bottlenecks in the testing process.

Ámbito científico (EuroSciVoc)

CORDIS clasifica los proyectos con EuroSciVoc, una taxonomía plurilingüe de ámbitos científicos, mediante un proceso semiautomático basado en técnicas de procesamiento del lenguaje natural. Véas: El vocabulario científico europeo..

Para utilizar esta función, debe iniciar sesión o registrarse

Programa(s)

Programas de financiación plurianuales que definen las prioridades de la UE en materia de investigación e innovación.

Tema(s)

Las convocatorias de propuestas se dividen en temas. Un tema define una materia o área específica para la que los solicitantes pueden presentar propuestas. La descripción de un tema comprende su alcance específico y la repercusión prevista del proyecto financiado.

Convocatoria de propuestas

Procedimiento para invitar a los solicitantes a presentar propuestas de proyectos con el objetivo de obtener financiación de la UE.

Datos no disponibles

Régimen de financiación

Régimen de financiación (o «Tipo de acción») dentro de un programa con características comunes. Especifica: el alcance de lo que se financia; el porcentaje de reembolso; los criterios específicos de evaluación para optar a la financiación; y el uso de formas simplificadas de costes como los importes a tanto alzado.

ACM - Preparatory, accompanying and support measures

Coordinador

Nokia Telecommunications Oy
Aportación de la UE
Sin datos
Dirección
Upseerinkatu 1
02600 Espoo
Finlandia

Ver en el mapa

Coste total

Los costes totales en que ha incurrido esta organización para participar en el proyecto, incluidos los costes directos e indirectos. Este importe es un subconjunto del presupuesto total del proyecto.

Sin datos
Mi folleto 0 0