Objectif
The F3 consortium’s vision is that the EU’s chemical industry’s competitive position would be strongly enhanced if it could operate modular continuous plant (F3 plant) which combines world scale continuous plant efficiency, consistency and scalability with the versatility of batch operation. Our project will deliver such a radically new production mode based on: a) Plug–and–play modular chemical production technology, capable of widespread implementation throughout the chemical industry. This technology uses generic backbone facilities designed for rapid interfacing with standardized process equipment containers (PEC). The PEC house process equipment assemblies (PEA) composed of intensified process equipment for fast, flexible future chemical production b) Holistic process design methodology applying process intensification concepts and innovative decision tools. This will accelerate process development and provides a substantial reduction in energy consumption, raw material usage and plant volumes. Our consortium of leading academic & research institutions and 7 major synthetic chemical producing industrial companies has 3 main goals: 1. To prove the technical feasibility of the F3 mode of manufacturing by building and operating a 0.1 to 30 kg/hr demonstration facility, 2. To demonstrate that operation of F3 plant will be more economical, ecoefficient and more sustainable than conventional production modes like large scale continuous or small to medium scale batch processing. 3. To drive a step change in the technology available to EU chemical production and engineering companies by designing intensified equipment for reaction and down stream processing, dissemination of standards for plug and play modular plant and providing open access to the backbone facility Our estimates indicate that the F3 concept will generate additional new business and will save 3.75 billion euro when existing products change to the F3 mode of manufacture.
Mots‑clés
Programme(s)
Appel à propositions
FP7-NMP-2008-LARGE-2
Voir d’autres projets de cet appel
Régime de financement
CP-IP - Large-scale integrating projectCoordinateur
51368 LEVERKUSEN
Allemagne
Voir sur la carte
Participants (28)
Participation terminée
1853 STROMBEEK-BEVER
Voir sur la carte
Participation terminée
54501 VANDOEUVRE LES NANCY CEDEX
Voir sur la carte
CB2 0AA Cambridge
Voir sur la carte
67063 Ludwigshafen Am Rhein
Voir sur la carte
OX4 2HN Oxford
Voir sur la carte
35510 Butzbach
Voir sur la carte
75794 Paris
Voir sur la carte
69730 Genay
Voir sur la carte
2800 Kongens Lyngby
Voir sur la carte
55234 Wendelsheim
Voir sur la carte
54052 Nancy Cedex
Voir sur la carte
45128 Essen
Voir sur la carte
30239 Krakow
Voir sur la carte
165 02 Praha 6
Voir sur la carte
100 44 Stockholm
Voir sur la carte
4824 EH Breda
Voir sur la carte
69003 Lyon
Voir sur la carte
52062 Aachen
Voir sur la carte
44227 Dortmund
Voir sur la carte
5612 AE Eindhoven
Voir sur la carte
NE1 7RU Newcastle Upon Tyne
Voir sur la carte
33098 Paderborn
Voir sur la carte
1853 Strombeek Bever
Voir sur la carte
44801 Bochum
Voir sur la carte
92700 COLOMBES
Voir sur la carte
45128 Essen
Voir sur la carte
51373 Leverkusen
Voir sur la carte
76131 Karlsruhe
Voir sur la carte