Objective
Concept: NanoFATE has been conceived to fill knowledge and methodological gaps currently impeding sound assessment of environmental risks posed by engineered nanoparticles (ENPs). Our vision is to assess environmental fate and risk of ENPs from high-volume products for which recycling is not an option; namely; fuel additive, personal care and antibacterial products. Two market ENPs from each product (CeO2, ZnO, Ag of varying size, surface and core chemistries) will be followed through their post-production life cycles i.e. from environmental entry as “spent product”, through waste treatment to their final fates and potential toxic effects. This will test the applicability of current fate and risk assessment methods and identify improvements required for a scientific assessment of ENPs at an early stage. Objectives: Such systematic study of the environmental fate and toxicity of selected ENPs will entail addressing 9 S&T objectives: 1: Design, tagging and manufacture of ENPs 2: Analysis of ENP interactions with abiotic and biotic entities 3: Generating predictive models for ENP exposure in waters and sludge-amended soils 4: Studying the fate and behaviour of ENPs through wastewater treatment 5: Determining acute and chronic ecotoxicity 6: Assessing effects of physico-chemical properties on ENP bioavailability 7: Defining mechanisms of uptake, internal trafficking, and toxicity 8: Developing spatial RA model(s) 9: Improving understanding of ENP risks Methodology: The work plan is designed to progress beyond the state-of-the-art through focused workpackages. While some objectives are delivered in single WPs, good cross WP integration will secure the key objectives of delivering new methods for quantifying ENP risks. Impact: NanoFATE will provide robust tools, techniques and knowledge needed by stakeholders to understand and communicate risks associated with different ENPs, including their environmental interactions and toxicity.
Fields of science (EuroSciVoc)
- engineering and technology environmental engineering waste management waste treatment processes recycling
- engineering and technology environmental engineering water treatment processes wastewater treatment processes
- engineering and technology nanotechnology nano-materials
- engineering and technology environmental engineering energy and fuels
Programme(s)
Multi-annual funding programmes that define the EU’s priorities for research and innovation.
Multi-annual funding programmes that define the EU’s priorities for research and innovation.
Topic(s)
Calls for proposals are divided into topics. A topic defines a specific subject or area for which applicants can submit proposals. The description of a topic comprises its specific scope and the expected impact of the funded project.
Calls for proposals are divided into topics. A topic defines a specific subject or area for which applicants can submit proposals. The description of a topic comprises its specific scope and the expected impact of the funded project.
Call for proposal
Procedure for inviting applicants to submit project proposals, with the aim of receiving EU funding.
Procedure for inviting applicants to submit project proposals, with the aim of receiving EU funding.
FP7-NMP-ENV-2009
See other projects for this call
Funding Scheme
Funding scheme (or “Type of Action”) inside a programme with common features. It specifies: the scope of what is funded; the reimbursement rate; specific evaluation criteria to qualify for funding; and the use of simplified forms of costs like lump sums.
Funding scheme (or “Type of Action”) inside a programme with common features. It specifies: the scope of what is funded; the reimbursement rate; specific evaluation criteria to qualify for funding; and the use of simplified forms of costs like lump sums.
Coordinator
SN2 1EU SWINDON WILTSHIRE
United Kingdom
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
Participants (12)
1081 HV Amsterdam
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
OX1 2JD Oxford
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
3810-193 Aveiro
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
28359 BREMEN
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
77900 Olomouc
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
13100 Vercelli
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
01142 Warszawa
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
CF10 3AT CARDIFF
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
90-762 LODZ
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
405 30 Goeteborg
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
75005 Paris
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
Participation ended
1081 HV Amsterdam
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.