European Commission logo
español español
CORDIS - Resultados de investigaciones de la UE
CORDIS
Contenido archivado el 2024-05-30

Development and Manufacture Scoop Intake and Channel incl. ice and debris protection and acoustic absorbers

Objetivo

B.1.1 Concept and Objectives The concept of this project is to design and build a composite prototype scoop intake, incorporating the following key aspects of design • Acoustic panelling • Electro thermal ice protection • Lightning protection (if necessary) • Erosion protection • Temperature sensing The objective of the consortium team is to effectively trade the various design requirements to produce an optimised system solution. B.1.2 Progress beyond State of Art The project will investigate the integration both structurally and electrically of electro-thermal ice protection and acoustic absorbing panelling within a composite inlet scoop structure. It is not the purpose of this project to directly combine the ice protection and noise abatement technologies within the same area of scoop structure. A fully integrated, combined solution such as that is not viable within this project under the current budget; However, GKN does view this as an appropriate objective and a potential development area for future projects. By enabling this direct integration GKN expects significant noise reduction benefits. GKN sees potential in this entire application development area for offering technology progression. Work in this area to date has been focused on engine nacelle lip liner technology and has progressed well although additional support in this area would be necessary to continue the advancement.

Convocatoria de propuestas

SP1-JTI-CS-2009-01
Consulte otros proyectos de esta convocatoria

Coordinador

GKN AEROSPACE SERVICES LIMITED
Aportación de la UE
€ 214 881,00
Dirección
2ND FLOOR, ONE CENTRAL BOULEVARD, BLYTHE VALLEY PARK
B90 8BG Solihull
Reino Unido

Ver en el mapa

Región
West Midlands (England) West Midlands Solihull
Tipo de actividad
Private for-profit entities (excluding Higher or Secondary Education Establishments)
Contacto administrativo
Paul Nicklin (Mr.)
Enlaces
Coste total
Sin datos

Participantes (1)