Objetivo
Eight Transmission System Operators (BE, CZ, FR, DE, IT, PT, CH, PL) and ENTSO-E, together with 4 associations of technology manufacturers, and 16 RTD performers propose a 3-year R&D project to develop and to apply a methodology for the long-term development of the Pan-European transmission network. The project aims at delivering a top-down methodology to support the planning from 2020 to 2050. First, it implements a set of future power scenarios, including generation units, the possible use of electricity storage and demand-side management solutions: scenarios for power localization are proposed with assumptions on the energy mix in each of the connected clusters covering the ENTSO-E area. Network studies are performed to detect the weak points when implementing the scenarios for 2050. Grid architectures options and a modular development plan are then proposed, including electricity highways, on the basis of power flow calculations, network stability analysis, socio-economic, network governance considerations, and with remarks from the consultation of European stakeholders. In parallel, an advanced planning methodology is designed, developed and tested with academic laboratories to address a few critical aspects of the above planning methodology, which may impact the robustness of the resulting architectures. This enhanced approach takes into account the correlated uncertainties in renewable generation and consumption, potential voltage and stability issues, and black-out risks including the feasibility of defence plans to avoid uncontrolled cascading failures of the candidate architectures. It includes the use of non-linear detailed models of power grids and stochastic optimization techniques. The dissemination is coordinated by ENTSO-E to reach the widest audience and to prepare the exploitation of the results. Standardization and complementary research efforts are pointed out for the future investment optimization with the support of the manufacturing industry.
Ámbito científico
Convocatoria de propuestas
FP7-ENERGY-2012-1-2STAGE
Consulte otros proyectos de esta convocatoria
Régimen de financiación
CP - Collaborative project (generic)Coordinador
92073 Paris
Francia
Ver en el mapa
Participantes (27)
7465 Trondheim
Ver en el mapa
44263 Dortmund
Ver en el mapa
06560 Valbonne
Ver en el mapa
1749 061 Lisboa
Ver en el mapa
1000 Bruxelles / Brussel
Ver en el mapa
20134 Milano
Ver en el mapa
10115 Berlin
Ver en el mapa
1000 Bruxelles / Brussel
Ver en el mapa
101 52 Praha 10
Ver en el mapa
5080 LAUFENBURG
Ver en el mapa
00156 Roma
Ver en el mapa
UB8 3PH Uxbridge
Ver en el mapa
28015 Madrid
Ver en el mapa
1049 001 Lisboa
Ver en el mapa
3000 Leuven
Ver en el mapa
03043 Cassino
Ver en el mapa
10623 Berlin
Ver en el mapa
1755 LE Petten
Ver en el mapa
01 330 Warszawa
Ver en el mapa
1000 Brussels
Ver en el mapa
KT1 4EH KINGSTON UPON THAMES SURREY
Ver en el mapa
1040 Bruxelles / Brussel
Ver en el mapa
1030 Bruxelles / Brussel
Ver en el mapa
OX1 1JD Oxford
Ver en el mapa
SW7 2DD LONDON
Ver en el mapa
05 520 Konstancin Jeziorna
Ver en el mapa
SE1 7QY LONDON
Ver en el mapa