Objective
"To meet short term European 20-20-20 objectives and long term targets of European Energy Roadmap 2050, an energy paradigm shift is needed for which biomass conversion into advanced biofuels is essential.
This new deal has challenges in catalyst development which so far hinders implementation at industrial level: Firstly, biomass is much more complex and reactive than conventional feedstock; secondly development of such catalysts is traditionally done by lengthy empirical approaches.
FASTCARD aims at:
-Developing a novel ""rational design"" of nano-catalysts for better control; optimised based on advanced characterisation methods and systematic capture of knowledge by scalable mathematical and physical models, allowing prediction of performance in the context of bio-feedstocks;
-Developing industrially relevant, insightful Downscaling methodologies to allow evaluation of the impact of diverse and variable bio-feedstocks on catalyst performance;
-Addressing major challenges impacting on the efficiency and implementation of 4 key catalytic steps in biobased processes:
• Hydrotreating (HT) and co-Fluid Catalytic Cracking forming the pyrolysis liquid value chain for near term implementation in existing refining units as a timely achievement of the 20-20-20 objectives: addressing challenges of selectivity and stability in HT; increased bio-oil content in co-FCC.
• Hydrocarbon (HC) reforming and CO2 tolerant Fischer Tropsch (FT) forming the gasification value chain for longer term implementation in new European relevant infrastructure, representing 100% green sustainable route for Energy Roadmap 2050: addressing challenges of stability and resistance in HC reforming; stability and selectivity for FT.
Advances in rational design of nano-catalysts will establish a fundamental platform that can be applied to other energy applications. The project will thus speed-up industrialisation of safer, greener, atom efficient, and stable catalysts, while improving the process efficiency."
Fields of science (EuroSciVoc)
Programme(s)
Multi-annual funding programmes that define the EU’s priorities for research and innovation.
Multi-annual funding programmes that define the EU’s priorities for research and innovation.
Topic(s)
Calls for proposals are divided into topics. A topic defines a specific subject or area for which applicants can submit proposals. The description of a topic comprises its specific scope and the expected impact of the funded project.
Calls for proposals are divided into topics. A topic defines a specific subject or area for which applicants can submit proposals. The description of a topic comprises its specific scope and the expected impact of the funded project.
Call for proposal
Procedure for inviting applicants to submit project proposals, with the aim of receiving EU funding.
Procedure for inviting applicants to submit project proposals, with the aim of receiving EU funding.
FP7-NMP-2013-LARGE-7
See other projects for this call
Funding Scheme
Funding scheme (or “Type of Action”) inside a programme with common features. It specifies: the scope of what is funded; the reimbursement rate; specific evaluation criteria to qualify for funding; and the use of simplified forms of costs like lump sums.
Funding scheme (or “Type of Action”) inside a programme with common features. It specifies: the scope of what is funded; the reimbursement rate; specific evaluation criteria to qualify for funding; and the use of simplified forms of costs like lump sums.
Coordinator
7034 Trondheim
Norway
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
Participants (13)
75794 PARIS
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
00144 ROMA
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
EC2V 7AD LONDON
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
630090 NOVOSIBIRSK
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
67547 WORMS
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
70174 Stuttgart
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
1755 LE PETTEN
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
9000 GENT
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
7545 PN ENSCHEDE
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
4824 EH BREDA
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
7491 TRONDHEIM
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
92400 Courbevoie
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
28045 Madrid
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.