Objective
Today, Building Energy Performance Simulation (BEPS) analysis tends to show a large discrepancy with real energy performance. Most cases are due to gross mistakes rather than fundamental inadequacy of available technology and methods. The reasons are manifold. Highly simplified calculation methods are used far beyond their domain of validity. Assumed boundary conditions such as occupant behaviour are not in accordance with actual usage; gross malfunctions in control and HVAC systems are left undetected in the commissioning process, while thermal bridges and distribution system losses are left without attention. Moreover, metered and sub-metered data are not used efficiently in calculation tools and engineering based simulation models during the Measurement and Verification (M&V) phase.
TRIBUTE aims at minimizing the gap between computed and measured energy performances through the improvement of the predictive capability of a state-of-the-art commercial BEPS. TRIBUTE will extend the use of this tool to the commissioning and operation stages of a building. For existing buildings, M&V techniques will be developed and deployed to connect the BEPS model in real time to the pivotal wireless sensing and control systems of a monitored building. This involves modelling building systems to a higher fidelity than done today, developing technology for on-line identification of building key parameters, and automatically adapting the on-line, real time BEPS to the actual building’s state.
In addition, BHM and EFM application will compare measured data to the then improved predicted metrics and will enable detecting building deviations. Advanced data mining methods will help evaluate these deviations. Subsequent Energy Efficiency Diagnostic Rules and optimization methods will provide cost effective and corrective retrofit actions accordingly.
The methodology and tools will be evaluated in the context of three different building types and locations.
Fields of science (EuroSciVoc)
CORDIS classifies projects with EuroSciVoc, a multilingual taxonomy of fields of science, through a semi-automatic process based on NLP techniques. See: https://op.europa.eu/en/web/eu-vocabularies/euroscivoc.
CORDIS classifies projects with EuroSciVoc, a multilingual taxonomy of fields of science, through a semi-automatic process based on NLP techniques. See: https://op.europa.eu/en/web/eu-vocabularies/euroscivoc.
- engineering and technology electrical engineering, electronic engineering, information engineering electronic engineering control systems
- engineering and technology mechanical engineering thermodynamic engineering
- natural sciences computer and information sciences data science data mining
You need to log in or register to use this function
We are sorry... an unexpected error occurred during execution.
You need to be authenticated. Your session might have expired.
Thank you for your feedback. You will soon receive an email to confirm the submission. If you have selected to be notified about the reporting status, you will also be contacted when the reporting status will change.
Programme(s)
Multi-annual funding programmes that define the EU’s priorities for research and innovation.
Multi-annual funding programmes that define the EU’s priorities for research and innovation.
Topic(s)
Calls for proposals are divided into topics. A topic defines a specific subject or area for which applicants can submit proposals. The description of a topic comprises its specific scope and the expected impact of the funded project.
Calls for proposals are divided into topics. A topic defines a specific subject or area for which applicants can submit proposals. The description of a topic comprises its specific scope and the expected impact of the funded project.
Call for proposal
Procedure for inviting applicants to submit project proposals, with the aim of receiving EU funding.
Procedure for inviting applicants to submit project proposals, with the aim of receiving EU funding.
FP7-2013-NMP-ENV-EeB
See other projects for this call
Funding Scheme
Funding scheme (or “Type of Action”) inside a programme with common features. It specifies: the scope of what is funded; the reimbursement rate; specific evaluation criteria to qualify for funding; and the use of simplified forms of costs like lump sums.
Funding scheme (or “Type of Action”) inside a programme with common features. It specifies: the scope of what is funded; the reimbursement rate; specific evaluation criteria to qualify for funding; and the use of simplified forms of costs like lump sums.
Coordinator
2000 NEUCHATEL
Switzerland
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
Participants (17)
92500 Rueil Malmaison
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
T12 CORK
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
D15 HN66 DUBLIN
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
01069 Dresden
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
31400 TOULOUSE
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
169 57 Solna
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
17086 La Rochelle
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
17031 La Rochelle
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
10122 Torino
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
10129 Torino
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
SM6 7DF WALLINGTON
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
08930 Sant Adria De Besos
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
2500-750 Caldas Da Rainha
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
5656AG Eindhoven
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
162 00 Praha
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
Participation ended
4 DUBLIN 4
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
Participation ended
31770 Colomiers
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.