Deliverables
Report with training material from thematic workshops organised during M1-M12
Report with training material from thematic workshops organised during M1M12
Report with training material from thematic workshops organised during M13-M23Report with training material from thematic workshops organised during M13M23
Report with produced publicity materialCollaboration between the AMANAC participating projects and the AMANAC-CSA
Collaboration between the AMANAC participating projects and the AMANACCSA
Project Master DocumentProject management description of project management structure decisionmaking bodies and their responsibilities Peer reviewing scheme Risk management plan
Outcomes of large scale event participationPublications
Author(s):
Maria Founti, Julen Astudillo Larraz, Tillmann Klein, Ulrich Knaack
Published in:
Journal of Facade Design and Engineering, Issue Vol 4, No 1-2 (2016), 2016, Page(s) 1-2, ISSN 2213-3038
Publisher:
IOS Press
DOI:
10.7480/jfde.2016.1-2.1362
Searching for OpenAIRE data...
There was an error trying to search data from OpenAIRE
No results available