CORDIS proporciona enlaces a los documentos públicos y las publicaciones de los proyectos de los programas marco HORIZONTE.
Los enlaces a los documentos y las publicaciones de los proyectos del Séptimo Programa Marco, así como los enlaces a algunos tipos de resultados específicos, como conjuntos de datos y «software», se obtienen dinámicamente de OpenAIRE .
Resultado final
Based on the various methods in finding the technical and non-technical requirements a report of detailed specifications will be made for the tools and services to be developed. This deliverable will be the second and be followed by a final set of detailed specifications.
Dissemination and networking report (b) (se abrirá en una nueva ventana)This deliverable will report on the dissemination and networking activities carried out in the second half of the project.
Final report on cost/benefit analyses of introducing Do CHANGE (se abrirá en una nueva ventana)Do CHANGE Application Programming Interfaces Design – Phase 1 (se abrirá en una nueva ventana)
First phase of the Do Change Application Programming Interfaces Design
Explorations of sensor technology (se abrirá en una nueva ventana)This deliverable will contain the results of the first stage technology explorations, selection and proof of concept. CET, ITRI, TUE together with ONMI will explore sensor technologies using led, inductance or other techniques and CET will assess feasibility based on Service Oriented Architecture (SOA) and capabilities.
Overall Do CHANGE ecosystem infrastructure architecture (se abrirá en una nueva ventana)Second evaluation report for the testing in controlled environments (se abrirá en una nueva ventana)
The full ecosystem will first be tested in the controlled environments before going into Phase 2 pilot with real patients.
Overall Do CHANGE ecosystem infrastructure architecture, including DDS and ecosystem component framework – Version 2 (se abrirá en una nueva ventana)Overall Do CHANGE ecosystem infrastructure architecture, including DDS and ecosystem component framework
Cross-pilot sites deployment plans (se abrirá en una nueva ventana)The deliverable will report the cross-pilot deployment plans, which will be defined including detailed planning of pilot set-up, resource planning and establishment of appropriate setting for operation support.
Cross-pilot sites deployment plans - Phase 2 (se abrirá en una nueva ventana)This report is the Local Medical Ethical Committee, informed consent form and recruitment strategies for phase 2 trials, due 30 April 2017. The purpose of this document is to support the pilot sites in setting up, operating and maintaining the pilot service at full scale within the planned timeframe. The overall idea is to collect into a single document all the key elements that the pilot sites need to take into account in order to: 1) ensure a safe starting of the operations and 2) maintain the services within the operation phase and 3) identify any potential risk in order to prepare the most suitable contingency plan. This deliverable concerns the Phase 2 Trial only.
Ethical and legal manual (se abrirá en una nueva ventana)Ethical and legal issues derived from the planned interventions in the three pilot sites will be analysed and documented in this ethical and legal manual that will define the project strategy in this regard to address any issue that could be raised during the project lifecycle. For this deliverable also privacy impact assessments will be carried out for the Do CHANGE applications.
Phase 1 Evaluation Report (se abrirá en una nueva ventana)This report will contain the results after three and six months of all patients in the first phase evaluation, ending in Dec. 2017. In general the information gathered by the indicators will compare the data gathered at a baseline measurement in order to be able to assign the changes caused by the deployment of the Do CHANGE proposed solutions.
Final evaluation report (se abrirá en una nueva ventana)This deliverable will be the final evaluation report on the clinical trials summarizing the results in each of the dimensions of the Do CHANGE evaluation framework and, in particular, including a discussion of the evidence of impact of the proposed solution over the common practice.
First evaluation report for the testing in controlled environments (se abrirá en una nueva ventana)This first evaluation report will describe the results of the following testing: At M12 the deployment of the tools will occur in the test lab of SmH. The testing of the tools in the controlled environment of SmH will last up to M16. Further reporting of the laboratory testing, following the methodology defined in T6.1 will be developed in the context of T6.5 and will be used as input for T2.3, in time to be integrated in D2.3.
First explorations of cost/benefit analyses of introducing (parts of) the Do CHANGE ecosystem (se abrirá en una nueva ventana)This report will collect first explorations of cost/benefit analyses of introducing (parts of) the Do CHANGE ecosystem
Detailed specifications of tools and services (se abrirá en una nueva ventana)Based on the various methods in finding the technical and nontechnical requirements a report of detailed specifications will be made for the tools and services to be developed This deliverable will be the first and be followed by a revised and final set of detailed specifications
Third-cycle completion report including final video of all scenarios (se abrirá en una nueva ventana)WP2 will follow an iterative, cyclic process with three cycles of one year each. The process guarantees that not only the tools + services are refined and developed from concept to practical usage and evaluation, but simultaneously the mutual understanding of the partners' values, ways of working and limitations is refined and developed as well. This final deliverable, consisting of a report and a video, will be the result of the third cycle, after the third year.
Testing methodology in controlled environments (se abrirá en una nueva ventana)This deliverable will describe the testing methodology for the first testing in a controlled environment (a laboratory setting).
Second version of the Do CHANGE evaluation framework (se abrirá en una nueva ventana)This deliverable will report on the second stage of the evaluation execution, following the guidelines defined at T6.2 by the Do CHANGE Evaluation Framework. In general the information gathered by the indicators will compare the data gathered at a baseline measurement in order to be able to assign the changes caused by the deployment of the Do CHANGE proposed solutions. In the deliverable the different levels of refinement will be compared.
First explorations of cost/benefit analyses of introducing (parts of) the DoCHANGE ecosystem – version 2 (se abrirá en una nueva ventana)This report is the exploration of costs/benefit analysis of the DoCHANGE service.
Local Medical Ethical Committee, informed consent form and recruitment strategies (se abrirá en una nueva ventana)The requests for the approval by the Local Medical Ethical Committee will be made, the informed consent form and recruitment strategies determined and reported in this deliverable.
First version of the Do CHANGE evaluation framework (se abrirá en una nueva ventana)This deliverable is the first version of the Do CHANGE evaluation framework. It will be constructed upon the evaluation framework of the EIP-AHA which will allow extrapolation to EU perspective and will therefore consist on a set of criteria, guidelines methods and tools that will ensure that the evaluation activities of the Do CHANGE project will provide insights into the impacts of deploying the tools + services to be developed during the project timeframe.
The Identity and Permissions Management Framework Design - Version 1 (se abrirá en una nueva ventana)The Identity and Permissions Management Framework Design
Local Medical Ethical Committee, informed consent and recruitment strategies - Phase 2 (se abrirá en una nueva ventana)This is an update of the deliverable for Phase 1, and will contain the requests for the Local Medical Ethical Committees including the detailed interventions in Phase 2.
The Identity and Permissions Management Framework Design - Version 2 (se abrirá en una nueva ventana)Software for The Identity and Permissions Management Framework Design - Version 2
Optimised calibration and accuracy of sensors (se abrirá en una nueva ventana)The sensors will be tested and calibrated, such that they will ensure accuracy and specificity, as well as accurate operability. The results will be accurate sensors.
Dissemination and networking report (a) (se abrirá en una nueva ventana)This deliverable will report on the dissemination and networking activities carried out up to half way the project. It will be followed by a similar report for the second half of the project.
First-cycle completion report including integrated use cases (se abrirá en una nueva ventana)WP2 will follow an iterative, cyclic process with three cycles of one year each. The process guarantees that not only the tools + services are refined and developed from concept to practical usage and evaluation, but simultaneously the mutual understanding of the partners' values, ways of working and limitations is refined and developed as well. This deliverable, consisting of a report and a video, will be the result of the first cycle, after the first year.
Final specifications of tools and services (se abrirá en una nueva ventana)This deliverable is the final report of detailed specifcations for the tools and services such as have been refined and will be evaluated, based on the various methods in finding the technical and non-technical requirements. This deliverable will be the third one.
Second-cycle completion report including video of all scenarios (se abrirá en una nueva ventana)WP2 will follow an iterative, cyclic process with three cycles of one year each. The process guarantees that not only the tools + services are refined and developed from concept to practical usage and evaluation, but simultaneously the mutual understanding of the partners' values, ways of working and limitations is refined and developed as well. This deliverable, consisting of a report and a video, will be the result of the second cycle, after the second year.
For information on the project, a website and leaflet will be produced at the very beginning of the project.
Publicaciones
Autores:
Mirela Habibović, Eva Broers, Jordi Piera-Jimenez, Mart Wetzels, Idowu Ayoola, Johan Denollet, Jos Widdershoven
Publicado en:
JMIR Research Protocols, Edición 7/2, 2018, Página(s) e40, ISSN 1929-0748
Editor:
JMIR Research Protocols
DOI:
10.2196/resprot.8406
Autores:
Idowu Ayoola, Mart Wetzels, Peter Peters, Sander van Berlo, Loe Feijs
Publicado en:
International Journal of Medical Informatics, Edición 117, 2018, Página(s) 103-111, ISSN 1386-5056
Editor:
Elsevier BV
DOI:
10.1016/j.ijmedinf.2018.06.004
Buscando datos de OpenAIRE...
Se ha producido un error en la búsqueda de datos de OpenAIRE
No hay resultados disponibles