Deliverables Documents, reports (4) Cement and Lime industry CCS Roadmap The deliverable will be a Cement and Lime industry CCS Roadmap This will be based on the design construction WP3 and testing of the LEILAC pilot plant WP4 the results of the technoeconomic modelling and retrofit analysis activities T51 T52 and T53It should provide substantive findings of use to policy makers CCS advocates lime and cement plant operators lime and cement plant technology providers and the general public Life Cycle Assessment (LCA) The public version of the assessment will articulate the enhanced benefits of Direct Separation technology. Verified Technoeconomics report summary (public) Public version of the Technoeconomics report Environmental report A summary of the environmental monitoring activities Demonstrators, pilots, prototypes (2) FEED study summary (public) The public summary of the Front End Engineering and Design (FEED) study of Task 3b.4. Feasibility study summary (public) A public summary version of the Feasibility study (public) resulting from Task 3b.3 PRE-FEED study Publications Peer reviewed articles (1) LEILAC: Low Cost CO 2 Capture for the Cement and Lime Industries Author(s): Thomas P. Hills, Mark Sceats, Daniel Rennie, Paul Fennell Published in: Energy Procedia, Issue 114, 2017, Page(s) 6166-6170, ISSN 1876-6102 Publisher: Elsevier Ltd DOI: 10.1016/j.egypro.2017.03.1753 Intellectual Property Rights Patent (3) Process and apparatus for manufacture of portland cement Application/Publication number: AU 2013904639 Date: 2013-11-29 Applicant(s): CALIX LTD Process and apparatus for manufacture of portland cement Application/Publication number: AU 2013904639 Date: 2013-11-29 Applicant(s): CALIX LTD Process and apparatus for manufacture of portland cement Application/Publication number: AU 2013904639 Date: 2013-11-29 Searching for OpenAIRE data... There was an error trying to search data from OpenAIRE No results available