Periodic Reporting for period 1 - XER-HSA (Engineered materials scale-up at industrial level for highest energy density ultracapacitors)
Période du rapport: 2015-06-01 au 2015-11-30
- Deep study of current production method used in pilot plant.
- Preliminary design of pre-industrial plant and investment study including cost analysis of equipment and installations and the operation and maintenance costs.
- A Business Case including a financial study analysing indicators such as NPV, IRR, and investment return time. To do this, Xerolutions took in consideration the results of investment study. Moreover, an analysis of the target market was made to determine the forecast sales, and the strengths and weakness about the protection level of Xerolutions Industrial Property were analysed.