During the Feasibility Assessment Ferroamp has contacted close to 20 solar plant developers and installers. Most of the companies have shown deep interests into the electronic hub, FerroHub, and see a huge potential for the technology. However, some of the contacted PV installers are not currently focusing on the integrated energy distribution, transmission and storage system, and remain step back with the market trends. At the end, Ferroamp secured 3 installers for the PH2 project, Nordic Solar (Sweden), SunStrom (Germany) and Enviko (the UK).
Thanks to the Feasibility Study, Ferroamp has decided to set the final production line at their facilities, and only minor units, such as PCB, cables, sheet metal parts and etc. order from the existing partners. The strategy was chosen in order to ensure a cost efficient, high quality and full production control. The studies has shown that Ferroamp would be able to save up to 40% of their expenses, by having production line in-house.
During the PH1 project Ferroamp has defined a minimum viable product, established engineering and industrialisation plans, and as well prepared the IP strategy and 5 years financial projections.