Architecture and interface specification of the co-simulation environment
(s’ouvre dans une nouvelle fenêtre)
Coupling and interaction of VSimRTI and ICOS tools for creating the co-simulation environment
Networking and Engagement activities plan
(s’ouvre dans une nouvelle fenêtre)
This deliverable will report the networking and liaison activities performed within INFRAMIX. It will be updated periodically (M9, M34)
Communication strategy and Plan_Second version
(s’ouvre dans une nouvelle fenêtre)
This deliverable will include the communication plan and strategy as well as all communication activities performed by INFRAMIX partners. This deliverable is an update of D6.1.
INFRAMIX plan for systems interaction, integration and testing
(s’ouvre dans une nouvelle fenêtre)
This deliverable will include the methodology and plan for the demonstrations as well as the interaction and integration of the systems developed in WP3
Roadmap towards fully automated transport systems
(s’ouvre dans une nouvelle fenêtre)
A key outcome including a roadmap and a guide to application of INFRAMIX development towards the long term vision of Automated Transport Systems
New visual signs and elements
(s’ouvre dans une nouvelle fenêtre)
The design of the proposed visual traffic signs and elements will be included here
Communication strategy and Plan
(s’ouvre dans une nouvelle fenêtre)
This deliverable will include the communication plan and strategy as well as all communication activities performed by INFRAMIX partners. This deliverable will be updated periodically (M6, M18, M36)
Infrastructure classification scheme
(s’ouvre dans une nouvelle fenêtre)
This deliverable will include INFRAMIX road classification scheme for mixed traffic flows
Networking and Engagement activities plan_Final
(s’ouvre dans une nouvelle fenêtre)
This deliverable will report the networking and liaison activities performed within INFRAMIX. This deliverable is the final version of D6.3
Requirements catalogue from the status quo analysis
(s’ouvre dans une nouvelle fenêtre)
Analysis of the three traffic scenarios resulting in requirements related to data and measurements from the infrastructure side, the used vehicle types and their level of automation, needed visual signs and electronic signals, etc.
Plan for evaluation and users’ engagement
(s’ouvre dans une nouvelle fenêtre)
This deliverable will include the methodology and plan for evaluation as well as the process for engaging the users
Communication strategy and Plan_Final
(s’ouvre dans une nouvelle fenêtre)
This deliverable will include the communication plan and strategy as well as all communication activities performed by INFRAMIX partners. This deliverable is the final version of D6.1
Users’ appreciation results
(s’ouvre dans une nouvelle fenêtre)
The results of the assessment of users’ appreciation regarding the overall information chain, the visual and electronic signals and the control strategies will be included in this deliverable
Quality Management Plan
(s’ouvre dans une nouvelle fenêtre)
The Quality Management Plan (QMP) establishes a quality control strategy and sets the quality objectives for INFRAMIX, it includes the Risk Management section with the methodology to identify, evaluate and manage project risks
Evaluation results, impact analysis and new safety performance criteria for the road infrastructure
(s’ouvre dans une nouvelle fenêtre)
The evaluation results of the developed INFRAMIX solutions, on the basis of the three scenarios, will be reported in this deliverable especially focusing on assessment of impacts on safety performance and traffic flow efficiency. In addition, the new safety performance criteria for road infrastructure will be proposed based on the project findings