Techno-economic analysis
(opens in new window)
Techno-economic analyses (UEDIN; M25). Report with estimate of improvement on the LCOE that the CERS braking module will provide within an existing PTO, including also LCA, SCOE and indicative values of energy per ton, energy per CAPEX and energy per OPEX.
Final recommendations and guidelines
(opens in new window)
Final recommendations and guidelines - Technical Development and Commercial Strategy (UEDIN; M36). Report integrating the results of tasks 7.1 to 7.3 and from other WPs into guidance through the overall business opportunities associated with the effective development of wave energy converters associated with this technology.
Performance test results
(opens in new window)
Performance test plan results and statement of system performance (EMEC). A final report with the overall WP results will be issued. It will include a matrix of test cases mapped to performance requirements with results.
CERS simulation in other systems
(opens in new window)
Report on CERS simulation in other systems (WAVEC). After proving the efficiency of the system on a specific Wave Energy Converter, this report will present other technologies that could use the CERS braking module and what could be their gain doing so. A preliminary draft will be released, while the final document will be submitted with updated data after the model validation process.
Business case and adaptability of the CERS braking module technology
(opens in new window)
Business case and adaptability of the CERS braking module technology (CPO; M30). Using results of WP2 and WP5, a supporting business case for the CERS braking module will be presented in a report.
Time Domain model description and verification report
(opens in new window)
Time Domain model description and verification report (WAVEC). This document will describe the theory and implementation of the model and how the accurate functioning has been verified.
Risk register
(opens in new window)
Risk register (EMEC). Project risk register will be created at the start and updated periodically along the project. The final Risk Register will be send to the EC at the end of the project.
Report RCM (Reliability Centered Maintenance) plan
(opens in new window)
Report presenting RCM plan for heaving WECs, using a case study of CorPower buoy with CERS braking module and real data obtained within WaveBoost (EDP, M24). A preliminary report on the approach of Reliability Centered Maintenance (RCM) will be submitted in M24 by EDP, with a final version incorporating test results provided in M34.
Report on system reliability analysis
(opens in new window)
Report on updated system reliability analysis after the performance testing (SP). A preliminary report on system reliability analysis after the reliability testing will be distributed internally.
Functional test results
(opens in new window)
Functional test plan results (EMEC). Matrix of test cases mapped to functional requirements with results
Reliability testing finished, results database
(opens in new window)
Reliability test report with failure database. (SP) Identified failure mechanisms for key components, system and components reliability data as well as design improvements incorporated through the test program.
Analysis of CERS PTO performance data
(opens in new window)
Assessment of CERS performance data (WAVEC). This deliverable will present a summary of the findings obtained with the model as well as the boosting component effects. A preliminary report will be released while the final report will be submitted with updated data, after the model validation process.
Report on updated probabilistic VMEA
(opens in new window)
Report on updated probabilistic VMEA after the performance testing (SP), based on reliability testing and probablistic method. A preliminary report describing the VMEA method and constraints will be distributed internally, and a final report on probablistic VMEA approach
Input data to techno-economic model
(opens in new window)
Input data to techno-economic Model (UEDIN; M12). Based on estimated CERS braking module performance and initial results of WP6, LCOE, LCA and SCOE tools will be set up as starting point for techno-economic modelling.
Internal Progress Reports
(opens in new window)
Internal progress reports (CPO). The first internal project report will be created at the start and progress reports will be updated periodically along the project. A final report assembly the internal progress reports will be sent to the EC at the end of the project.