Resultado final
Enhanced track design solutions through predictive analyses [Task 3.2; TRL4] (Month 28) The deliverable will compile the work in T3.2. Here innovative solutions in the form of continuous supported track structures, new alloys and welding methods, and optimised ballast track will be presented together with the foundation and selected core components of the Shift2Rail Track structure feasibility evaluation framework.
Report on coordination and qualityReport on scientific & technical coordination and quality assurance (Month 32) Report describing the work on quality assurance and how quality-assured recommendations are forwarded to subsequent Shift2Rail projects
Core S&C issues– Identifying and Understanding Core S&C Issues [TRL 6] (Month 12) Final summary report into core S&C issues and missing links between existing failures and root causes identified. Operational failures and related whole life costs will be compiled and recommendation for key areas of improvement made.
Communication activitiesDissemination and Exploitation activities (Month 32) Report summarising the results/impacts of all the dissemination, communication and exploitation activities
Track influencing parametersEnhanced track structure – Status, key influencing parameters and prioritised areas of improvement [Task 3.1; TRL6] (Month 26) The deliverable will compile the work in T3.1. An initial identification of prioritized areas of improvements will also form the skeleton. Missing links between existing failures and root causes will be investigated and the influence of operational conditions highlighted. Operational failures and related costs will be compiled. Requirements for selected optimized solutions (with respect to track, mounting, connection and repairing techniques will be presented together with key areas for inspection and monitoring
Monitoring of tunnels and bridgesInspection and monitoring techniques for tunnels and bridges [TRL 6] (Month 28] Methods for tunnel inspection, monitoring and assessment will be presented including digital image correlation scanning, data base handling and tunnel condition marking index. A demonstration model will be outlined for structural assessment based on monitoring. Methods for bridge inspection, monitoring and assessment will be presented including non-destructive tests, dynamic behaviour, data base handling and asset management. A demonstration model will be outlined for structural assessment based on monitoring
Improvement of tunnels and bridges- Improvement of tunnels and bridges [TRL 4] (Month 29) –Tunnel and Bridge repair and strengthening technologies, including demonstrator concepts. Methods will be presented for drainage, transition zones and strengthening with Fibre Reinforced Polymers (FRP) under dynamic loads and for fatigue resistance improvement.
Operational abilities of S&CEstablishing and improving operational abilities of S&C [TRL4] (Month 31) Final summary report into enhanced S&C monitoring, maintenance and operational processes.
Enhanced track operation–Enhanced inspection, maintenance and operation of track. [Tasks 3.3; TRL5] (Month 31) The deliverable will compile the work in T3.2. Will present the development of highly efficient maintenance practices in terms of improved decision on actions (through extensions to the Shift2Rail Track structure feasibility evaluation framework) and the efficient execution of these. Further, scientific and technical foundation for robust and efficient monitoring and inspection practices are presented.
Design of S&CEnhanced design of S&C through virtual development and verification [TRL5] (Month 28) Final summary report into the development of a whole system modelling approach for S&C, including new component design enhancements.
Project Identity, website, brochure and document repository (Month 6) Production of IN2TRACK brochure with project identify and project background. First draft on document templates website for document sharing and storage including individual user login to be available month 2.
Publicaciones
Autores:
Robin Andersson, Fredrik Larsson, Elena Kabo
Publicado en:
Engineering Fracture Mechanics, Edición 189, 2018, Página(s) 204-220, ISSN 0013-7944
Editor:
Pergamon Press Ltd.
DOI:
10.1016/j.engfracmech.2017.11.015
Autores:
Knut Andreas Meyer, Magnus Ekh, Johan Ahlström
Publicado en:
International Journal of Solids and Structures, Edición 130-131, 2018, Página(s) 122-132, ISSN 0020-7683
Editor:
Pergamon Press Ltd.
DOI:
10.1016/j.ijsolstr.2017.10.007
Autores:
Knut Andreas Meyer, Dimitrios Nikas, Johan Ahlström
Publicado en:
Wear, Edición 396-397, 2018, Página(s) 12-21, ISSN 0043-1648
Editor:
Elsevier BV
DOI:
10.1016/j.wear.2017.11.003
Autores:
Nekane Correa, Ernesto G. Vadillo, Javier Santamaria, Julio Blanco-Lorenzo
Publicado en:
Journal of Sound and Vibration, Edición 413, 2018, Página(s) 79-100, ISSN 0022-460X
Editor:
Academic Press
DOI:
10.1016/j.jsv.2017.10.031
Autores:
Julio Blanco-Lorenzo, Javier Santamaria, Ernesto G. Vadillo, Nekane Correa
Publicado en:
Tribology International, Edición 119, 2018, Página(s) 143-156, ISSN 0301-679X
Editor:
Pergamon Press Ltd.
DOI:
10.1016/j.triboint.2017.10.022
Autores:
Robin Andersson, Peter T. Torstensson, Elena Kabo, Fredrik Larsson, Anders Ekberg
Publicado en:
Wear, Edición 366-367, 2016, Página(s) 139-145, ISSN 0043-1648
Editor:
Elsevier BV
DOI:
10.1016/j.wear.2016.05.014
Autores:
Casey Jessop, Johan Ahlström, Lars Hammar, Søren Fæster, Hilmar K. Danielsen
Publicado en:
Wear, Edición 366-367, 2016, Página(s) 392-400, ISSN 0043-1648
Editor:
Elsevier BV
DOI:
10.1016/j.wear.2016.06.027
Autores:
R. Borinaga-Treviño, A. Orbe, J. Norambuena-Contreras, J. Canales
Publicado en:
Construction and Building Materials, Edición 186, 2018, Página(s) 31-41, ISSN 0950-0618
Editor:
Elsevier BV
DOI:
10.1016/j.conbuildmat.2018.07.108
Autores:
K. Meyer, M. Ekh
Publicado en:
2017
Editor:
SCIPEDIA
Autores:
Elena Kabo, Anders Ekberg, Michele Maglio
Publicado en:
2018
Editor:
.
Autores:
Anders Ekberg, Björn Pålsso
Publicado en:
2018
Editor:
.
Autores:
Emil Aggestam, Jens Nielsen, Andreas Andersson, Martin Li
Publicado en:
2018
Editor:
.
Autores:
Bernsteiner, C., Meierhofer, A., Trummer, G., Marte, C., Scheriau, S., Six, K. & Dietmaier, P
Publicado en:
2018
Editor:
.
Autores:
Rostyslav Skrypnyk
Publicado en:
2018
Editor:
.
Autores:
.
Publicado en:
"UIC eNews #583", 2018
Editor:
UIC eNews
Autores:
.
Publicado en:
"UIC eNews #580", 2018
Editor:
UIC
Autores:
.
Publicado en:
2018
Editor:
UIC
Autores:
.
Publicado en:
2018
Editor:
.
Autores:
Roger Lewis
Publicado en:
2018
Editor:
.
Autores:
John Leander
Publicado en:
2018
Editor:
.
Autores:
.
Publicado en:
2018
Editor:
.
Autores:
.
Publicado en:
2018
Editor:
.
Autores:
.
Publicado en:
2019
Editor:
.
Autores:
Rostyslav Skrypnyk
Publicado en:
2018
Editor:
Nordic Railway Seminar
Autores:
Bjorn Palsson
Publicado en:
2018
Editor:
The Nordic Railway Seminar
Autores:
Björn Pålsson
Publicado en:
2018
Editor:
Board of Chalmers Railway Mechanics competence centre (CHARMEC)
Autores:
Kate Tomlinson, The University of Sheffield
Publicado en:
2018
Editor:
27th Mission of Tribology Research conference
Autores:
Prof Lewis
Publicado en:
2018
Editor:
UK Rail Research & Innovation Network (UKRRIN) Annual Conference
Autores:
Y. Bezin, D. Kostovasilis, S. Neves, B. Sambo and A. Foan
Publicado en:
2018
Editor:
4th International Conference on Railway Technology
Autores:
Robin Andersson
Publicado en:
2018
Editor:
.
Buscando datos de OpenAIRE...
Se ha producido un error en la búsqueda de datos de OpenAIRE
No hay resultados disponibles