Livrables
Report describing the outcomes of the assessment of replication possibilities within the national and international markets. A draft version of the report will be delivered at month 36, while its final version will be delivered at month 48. This deliverable mainly refers to Tasks 4.5 and 4.8.
Replication plans for all individual technologies (x9)Report describing all relevant technological and nontechnological information needed for an effective replication of the developed technologies products and servicesfor the three pilots Orkney pilot Demand Side Management Aggregator Orkney pilot Predictive Algorithms enabling Demand Response Orkney pilot Smart Integration of grid users from Electric Vehicles Orkney pilot Smart Integration of Storage PCM Heat Batteries Orkney pilot Smart Integration of Storage Electrochemical Energy Storage Systems ESS Sams pilot Smart Integration of grid users from Boats Sams pilot Smart Integration of Storage Battery Electrical Storage Systems BESS Madeira pilot Smartening the Distribution Grid Madeira pilot Smart integration of storage Pumped Hydro Three Greek island shadows SMILE technologies replicationThis deliverable mainly refers to Task 92
Case study specification and assessmentReport describing the overall design concept of the Madeira pilot installation. The report will include the minimum requirements for the installation and demonstration of partner technologies. This deliverable mainly refers to Task 4.1.
Recommendations on standards and potential technical barriersReport mapping and analysing relevant technical regulations in force ie locally enforced regulations standard interfaces grid codes and any recommended normsstandards and security measures for smart grids applicable to the three pilots in DK PT and the UK to assess potential technical barriers for replicability and interoperability of solutions The document will also include recommendations based on the lessons learned and essential identified compliance gaps against eg the principles of the European Smart Grid Task Force work which will also be fed into the ongoing European harmonisation activities This deliverable mainly refers to Task 75
Schematic and technical description of Orkney DSM system architectureReport describing the overall design concept and architecture of the Orkney Demand Side Management (DSM) system. The report will particularly include a technical description of the DSM system architecture along with schematics. This deliverable mainly refers to Task 2.1.
Installation report of the DSM demo (final version)Report documenting the installation and test of the DSM demo system in Madeira The report will provide photographic evidence of the installation and the outcome of the testing activity This deliverable mainly refers to Task 45
Specifications and data report for the Samsø pilotDocument (in Danish) specifying the overall requirements, construction phases, and technical drawings to manage installers during the installation activity of the Samsø pilot system. The report will particularly include a technical description of the system architecture along with specifications. This deliverable mainly refers to Task 3.1.
Installation report of the EV smart charging demoReport documenting the installation and test of the EV smart charging demo system in Madeira. The report will provide photographic evidence of the installation and the outcome of the testing activity. A draft version of the report will be delivered at month 36, while its final version will be delivered at month 48. This deliverable mainly refers to Task 4.8.
Infrastructure preparation and kick-offDocument providing evidence of the installed communication infrastructure and smart metering hardware and of the deployment and integration of the Energy Management System. This deliverable mainly refers to Task 4.2.
Data collection, modeling, simulation and decisionReport describing all steps necessary before the deployment of the storage technologies in the selected micro-production sites, namely data collection, modeling, simulation and decision. This deliverable mainly refers to Task 4.3.
Installation report of the EV smart charging demo (final version)Report documenting the installation and test of the EV smart charging demo system in Madeira The report will provide photographic evidence of the installation and the outcome of the testing activityThis deliverable mainly refers to Task 48
Policy strategy recommendationsReport providing recommendations for potential changes in policy strategies to support the transition to highRE energy systems in Orkney Sams and Madeira islands This deliverable mainly refers to Task 85
Report on 12 months of system operationReport providing an assessment of the operation of the DSM system on Orkney after 12 months, during which the DSM system will have been optimised. This deliverable mainly refers to Task 2.7.
Report on market acceptance and replicability (final version)Report describing the outcomes of the assessment of replication possibilities within the national and international markets This deliverable mainly refers to Tasks 45 and 48
Energy market recommendationsReport providing recommendations for potential changes in energy market structures to support the transition to highRE energy systems in Orkney Sams and Madeira islands This deliverable mainly refers to Task 84
SMILE business cases and financial mechanismsRoadmap document outlining the most promising business cases by the participating SMEs The document will include business plans for the SMILE technical solutions and related services It will moreover describe the financial mechanisms to be applied for rendering the solutions attractive for both technology providers and users This deliverable mainly refers to Task 65
Demand response evaluation for the system -Final VersionD38 Demand response evaluation for the system Final version AAU M54 Final version of the report documenting the demand response evaluation for the system The report will describe the outcome of the trials and the demonstration of the demand response methods set up in WP5 in the real application It will moreover include an assessment of the control methods based on market price signals developed with input from WP8 This deliverable mainly refers to Task 36
Report on 24 months of system operationReport providing an assessment of the operation of the DSM system on Orkney after 24 months during which the DSM system will have been further optimised This deliverable mainly refers to Task 27
Developing Micro-grids in the EUDocument report or scientific publication providing suggestions for a regulatory framework applicable to the joint development of microgrids ie integrated renewable energy projects including the grids and meeting the requirements of producers consumers and prosumers This deliverable mainly refers to Task 73
Detailed plan of action for the DSM demoReport detailing the plan of action for the deployment of the DSM system as part of the Madeira pilot installation. This deliverable mainly refers to Task 4.4. This report may also include information that complete the previous deliverables.
Report on LCA/LCC tool and resultsReport describing the outcome of the environmental and economic assessment of the technical solutions based on Life Cycle Assessment (LCA) and Life Cycle Costing (LCC) respectively. This deliverable mainly refers to Task 6.2.
Most appropriate DR services for each pilotReport describing the most appropriate Demand Response (DR) services for each pilot based on an assessment of the grid issues faced by each of the three islands and the consideration of the specific DR assets implemented at each pilot site. The report will include a description of the algorithms developed for determining curtailment and DR. This deliverable mainly refers to Task 5.1.
Extended market report on SMILE solutionsDocument providing the outcome of the market assessment of the SMILE technical solutions The document will include a description of the value adding features of the proposed technologiesservices and an investigation of existing productsservices with which the proposed technologies services might compete This deliverable mainly refers to Task 65
Medium term scenarios for the three pilot islandsReport describing future scenarios (short term, i.e. up to five years, as well as mid- and long term) which include the demonstration projects in the three pilot islands in the perspective of a shift from energy systems relying on fossil fuels to energy systems relying solely or exclusively on renewable energy sources. This deliverable mainly refers to Task 8.2 as well as Task 8.1, since scenarios take their starting point in the reference models developed in Task 8.1.
Reference energy simulation models for the three pilot islandsReport describing the established reference energy simulation models of the energy system for the three pilots for modelling a year with a temporal resolution of 1h. This reference will holistically describe the present energy systems including electricity, heating, cooling, transportation and industrial needs with a particular focus on parts of the systems that are interconnected through conversion units between these (e.g. electricity to heat or electricity to transportation). This deliverable mainly refers to Task 8.1.
Detailed plan of action for the EV smart charging demoReport detailing the plan of action for the deployment of the EV smart charging system as part of the Madeira pilot installation. This deliverable mainly refers to Task 4.7. This report may also include information that complete the previous deliverables.
Report on selected evaluation indicatorsReport describing the selected key indicators for the environmental and economic assessment of the technical solutions and providing the value thresholds set for each indicator so to assess positive or negative impacts. This deliverable mainly refers to Task 6.1.
Integrating electricity and heat supply systemsDocument (i.e. report or scientific publication) examining the legal concepts applying to heat supply and the integration of the electricity and heat supply systems in DK, PT and the UK and analysing the extent to which a European approach would be required. This deliverable mainly refers to Task 7.2.
Demand response evaluation for the systemReport documenting the demand response evaluation for the system. The report will describe the outcome of the trials and the demonstration of the demand response methods set up in WP5 in the real application. It will moreover include an assessment of the control methods based on market price signals developed with input from WP8. This deliverable mainly refers to Task 3.6.
Cost-benefit analysis, cost-effectiveness analysis and social impactReport describing the outcome of the costbenefit analysis costeffectiveness analysis and social impact assessment This deliverable mainly refers to Task 64
Installation report of the DSM demoReport documenting the installation and test of the DSM demo system in Madeira. The report will provide photographic evidence of the installation and the outcome of the testing activity. A draft version of the report will be delivered at month 36, while its final version will be delivered at month 48. This deliverable mainly refers to Task 4.5.
Kravspecifikation (Requirements Specification) (in Danish, extended summary in English)Document specifying the overall requirements, construction phases, and technical drawings to manage installers during the installation activity of the Samsø pilot system. This deliverable mainly refers to Tasks 3.3, 3.4 and 3.5.
Regulating Electricity StorageDocument (i.e. report or scientific publication) outlining the outcomes of the assessment of legislation concerning electricity storage along with suggestions for a regulatory framework, which could be envisaged on production/supply or consumer level or on the level of the independent network operator. This deliverable mainly refers to Task 7.1.
Balancing Local GridsDocument report or scientific publication examining the provisions on balancing in DK PT and the UK and how they are applied to the three pilot projects and assessing whether there is a need for a new balancing regime and a common EU approach This deliverable mainly refers to Task 74
Development plan for the SMILE case in Ballen (in Danish, extended summary in English)Report documenting the final development plan of the Samsø pilot installation. This deliverable mainly refers to Tasks 3.3, 3.4 and 3.5.
Press release to highlight the most interesting outcomes from pilot activities and in relation to commercialisation developments replication opportunities to be distributed to stakeholder relevant media online print The first press release will be published at M11 and will be regularly updated with a final release to be published in M48 This deliverable mainly refers to Task 93
SMILE website up and running & Social Media presenceSMILE website up and running. Start of Social Media presence, which will be regularly updated throughout the project. This deliverable mainly refers to Task 9.3.
SMILE NewslettereNewsletter describing the technological nontechnological SMILE developments to be distributed to communication database The newsletter will be released quarterly starting from M4 and will have its final release at M46 This deliverable mainly refers to Task 93
Detailed design of the DSM system to be installed on Orkney. This deliverable mainly refers to Task 2.4
Publications
Auteurs:
Dawid Jozwiak, Jayakrishnan Radhakrishna Pillai, Pavani Ponnaganti, Birgitte Bak-Jensen, Jan Jantzen
Publié dans:
2021 International Conference on Smart Energy Systems and Technologies (SEST), 2021, ISBN 978-1-7281-7660-4
Éditeur:
IEEE
DOI:
10.1109/sest50973.2021.9543171
Auteurs:
Sabrina Scuri, Gergana Tasheva, Luísa Barros, Nuno Jardim Nunes
Publié dans:
Human-Computer Interaction – INTERACT 2019 - 17th IFIP TC 13 International Conference, Paphos, Cyprus, September 2–6, 2019, Proceedings, Part III, Numéro 11748, 2019, Page(s) 91-111, ISBN 978-3-030-29386-4
Éditeur:
Springer International Publishing
DOI:
10.1007/978-3-030-29387-1_6
Auteurs:
Poul Alberg Østergaard, Jan Jantzen, Hannah Mareike Marczinkowski, Michael Kristensen
Publié dans:
Proceeding 13th conf. on Sustainable Development of Energy, Water and Environment Systems, SDEWES 2018, Numéro 149, 2018, Page(s) 1-25
Éditeur:
SDEWES
Auteurs:
Spyridon Chapaloglou, Athanasios Nesiadis, Konstantinos Atsonios, Nikos Nikolopoulos, Dimitrios Rakopoulos, Panagiotis Grammelis, Emmanuel Kakaras
Publié dans:
ECOS 31st International Conference on Efficiency, Cost, Optimization, Simulation and Environmental Impact of Energy Systems, 2018, Page(s) 12
Éditeur:
unknow
DOI:
10.5281/zenodo.2552035
Auteurs:
Quintal Filipe, Scuri Sabrina, Barreto Mary, Pereira Lucas, Vasconcelos Dino, Pestana Daniel
Publié dans:
CHI Conference on Human Factors in Computing Systems May 2019 Paper No.: LBW0161, 2019
Éditeur:
ACM
Auteurs:
Barreto Mary, Pereira Lucas, Quintal Filipe
Publié dans:
Proceedings of the 6th International Conference on ICT for Sustainability - ICT4S 2019, 2019
Éditeur:
ICT4S
Auteurs:
Lucas Pereira, Jonathan Cavaleiro
Publié dans:
IECON 2019 - 45th Annual Conference of the IEEE Industrial Electronics Society, 2019
Éditeur:
IEEE
Auteurs:
Md Umar Hashmi, Lucas Pereira, Ana Busic
Publié dans:
2019 IEEE Milan PowerTech, 2019, Page(s) 1-6, ISBN 978-1-5386-4722-6
Éditeur:
IEEE
DOI:
10.1109/ptc.2019.8810531
Auteurs:
Luísa Barros, Mary Barreto, Lucas Pereira
Publié dans:
Proceedings of the 7th International Conference on ICT for Sustainability, 2020, Page(s) 88-97, ISBN 9781450375955
Éditeur:
ACM
DOI:
10.1145/3401335.3401667
Auteurs:
Md Umar Hashmi, Jonathan Cavaleiro, Lucas Pereira, Ana Busic
Publié dans:
2020 IEEE Power & Energy Society Innovative Smart Grid Technologies Conference (ISGT), 2020, Page(s) 1-5, ISBN 978-1-7281-3103-0
Éditeur:
IEEE
DOI:
10.1109/isgt45199.2020.9087772
Auteurs:
Petros Iliadis, Stefanos Domalis, Athanasios Nesiadis, Konstantinos Atsonios, Spyridon Chapaloglou, Nikos Nikolopoulos, Panagiotis Grammelis
Publié dans:
E3S Web of Conferences, Numéro 113, 2019, Page(s) 03001, ISSN 2267-1242
Éditeur:
EDP Sciences
DOI:
10.1051/e3sconf/201911303001
Auteurs:
Konstantinos Atsonios; Avraam Kartalidis; Nikos Nikolopoulos
Publié dans:
Energy Research, Numéro 21, 2021, ISSN 0363-907X
Éditeur:
John Wiley & Sons Inc.
DOI:
10.1002/er.6691
Auteurs:
Carla Pestana; Luísa Barros; Sabrina Scuri; Mary Barreto
Publié dans:
Volume 13, Numéro 22, 2021, ISSN 2071-1050
Éditeur:
MDPI Open Access Publishing
DOI:
10.3390/su13147543
Auteurs:
Hannah Mareike Marczinkowski, Poul Alberg Østergaard
Publié dans:
Energy, Numéro 175, 2019, Page(s) 505-514, ISSN 0360-5442
Éditeur:
Pergamon Press Ltd.
DOI:
10.1016/j.energy.2019.03.103
Auteurs:
Stefanos Ntomalis, Petros Iliadis,Konstantinos Atsonios, Athanasios Nesiadis, Nikos Nikolopoulos, Panagiotis Grammelis
Publié dans:
Energies, Numéro 13(21), 5786, 2020, ISSN 1996-1073
Éditeur:
Multidisciplinary Digital Publishing Institute (MDPI)
DOI:
10.3390/en13215786
Auteurs:
Petros Iliadis, Stefanos Ntomalis, Konstantinos Atsonios, Athanasios Nesiadis, Nikos Nikolopoulo, Panagiotis Grammelis
Publié dans:
International Journal of Energy Research 2020 1-19, Numéro 25, 2020, Page(s) 2709-2727, ISSN 0363-907X
Éditeur:
John Wiley & Sons Inc.
DOI:
10.1002/er.5963
Auteurs:
F. Quintal, D. Garigali, D. Vasconcelos, J. Cavaleiro, W. Santos, L. Pereira
Publié dans:
Energies, Numéro 2021, 14, 5786, 2021, ISSN 1996-1073
Éditeur:
Multidisciplinary Digital Publishing Institute (MDPI)
DOI:
10.3390/en14185786
Auteurs:
Dionysios Pramangioulis, Konstantinos Atsonios, Nikos Nikolopoulos, Dimitrios Rakopoulos, Panagiotis Grammelis, Emmanuel Kakaras
Publié dans:
Energies, Numéro 12/2, 2019, Page(s) 242, ISSN 1996-1073
Éditeur:
Multidisciplinary Digital Publishing Institute (MDPI)
DOI:
10.3390/en12020242
Auteurs:
Dawid Jozwiak; Jayakrishnan Radhakrishna Pillai; Pavani Ponnaganti; Birgitte Bak-Jensen; Jan Jantzen
Publié dans:
Numéro 12, Numéro 18, 2021, ISSN 1996-1073
Éditeur:
Multidisciplinary Digital Publishing Institute (MDPI)
DOI:
10.3390/en14123397
Auteurs:
Hannah Marczinkowski, Poul Alberg Østergaard, Søren Roth Djørup
Publié dans:
Energies, Numéro 12/18, 2019, Page(s) 3484, ISSN 1996-1073
Éditeur:
Multidisciplinary Digital Publishing Institute (MDPI)
DOI:
10.3390/en12183484
Auteurs:
Hannah Mareike Marczinkowski, Luísa Barros
Publié dans:
Energies, Numéro 13(17), 2020, Page(s) 1-21, ISSN 1996-1073
Éditeur:
Multidisciplinary Digital Publishing Institute (MDPI)
DOI:
10.3390/en13174434
Auteurs:
Ioannis Violidakis, Konstantinos Atsonios, Petros Iliadis, Nikolaos Nikolopoulos
Publié dans:
Journal of Energy Storage 32(101942), 2020, ISSN 2352-152X
Éditeur:
Elsevier
DOI:
10.1016/j.est.2020.101942
Auteurs:
Hannah Mareike Marczinkowski, Poul Alberg Østergaard
Publié dans:
Energy, Numéro 152, 2018, Page(s) 466-475, ISSN 0360-5442
Éditeur:
Pergamon Press Ltd.
DOI:
10.1016/j.energy.2018.03.153
Auteurs:
Spyridon Chapaloglou, Athanasios Nesiadis, Petros Iliadis, Konstantinos Atsonios, Nikos Nikolopoulos, Panagiotis Grammelis, Christos Yiakopoulos, Ioannis Antoniadis, Emmanuel Kakaras
Publié dans:
Applied Energy, Numéro 238, 2019, Page(s) 627-642, ISSN 0306-2619
Éditeur:
Pergamon Press Ltd.
DOI:
10.1016/j.apenergy.2019.01.102
Auteurs:
Poul Alberg Østergaard, Jan Jantzen, Hannah Mareike Marczinkowski, Michael Kristensen
Publié dans:
Renewable Energy, Numéro 139, 2019, Page(s) 904-914, ISSN 0960-1481
Éditeur:
Pergamon Press Ltd.
DOI:
10.1016/j.renene.2019.02.140
Auteurs:
Lucas Pereira; Jonathan Cavaleiro; Luísa Barros
Publié dans:
Numéro 20, Numéro 28, 2020, ISSN 2076-3417
Éditeur:
mdpi
DOI:
10.3390/app10207366
Auteurs:
Nikolaos Kolokas; Dimosthenis Ioannidis; Dimitrios Tzovaras
Publié dans:
Energies, Numéro 1, 2021, ISSN 1996-1073
Éditeur:
Multidisciplinary Digital Publishing Institute (MDPI)
DOI:
10.3390/en14113162
Auteurs:
Raffaele Carli, Mariagrazia Dotoli, Jan Jantzen, Michael Kristensen, Sarah Ben Othman
Publié dans:
Energy, Numéro 198, 2020, Page(s) 117188, ISSN 0360-5442
Éditeur:
Pergamon Press Ltd.
DOI:
10.1016/j.energy.2020.117188