The work on PJ01 was completed against the plan. All Datapack deliverables were completed and the formal maturity gates for all solutions were also completed and all the maturity assessments undertaken against the respective target maturity for Wave 1. All Milestones were achieved. The specific status at project end for each of the technical WPs is as follows:
WP1: PJ.01-01
• The solution conducted a number of modelling, FTS, RTS exercises and assessments
• The Datapack consisting of all the required deliverables were submitted
• The maturity assessment and maturity gate was undertaken against the target V2 maturity
• The solution as a whole has not achieved full V2 maturity and was assessed as V2 ongoing. However, some elements have achieved results that can be considered as non-blocking for V2
WP2: PJ.01-02
• The solution conducted a number of modelling, FTS, RTS exercises and assessments
• The Datapack consisting of all the required deliverables were submitted
• The maturity assessment and maturity gate was undertaken against the target V2 maturity
• The solution as a whole has not reached full V2 maturity and hence was assessed as V2 ongoing. However, some elements have achieved V2
WP3: PJ.01-03A
• The solution conducted a number of modelling, FTS, RTS exercises and assessments
• The Datapack consisting of all the required deliverables were submitted
• The maturity assessment and maturity gate was undertaken against the target V2 maturity
• The solution has achieved it's target V2 maturity
WP4: PJ.01-05
• The solution conducted a number of modelling, FTS, RTS exercises and assessments
• The Datapack consisting of all the required deliverables were submitted
• The maturity assessment and maturity gate was undertaken against the target V2 maturity
• Solution has achieved the target V2 with a number of acceptable risks due to a number of partial non-blocking criteria that were not fully met. The gap needs to be covered in case of the future research. The solution demonstrated quantitative benefits and feasibility
WP5: PJ.01-06
• The solution conducted a number of modelling, FTS, RTS exercises and Flight Trials
• The Datapack consisting of all the required deliverables were submitted
• The maturity assessment and maturity gate was undertaken against the target V2 maturity
• The Solution has achieved the target V3 including the optional HMD enabler
WP6: PJ.01-07
• The solution conducted a number of modelling, FTS, RTS exercises and assessments
• The Datapack consisting of all the required deliverables were submitted
• The maturity assessment and maturity gate was undertaken against the target V2 maturity
• The solution has achieved the target V2 maturity with acceptable risks linked to some safety and security aspects and due to the CBA and performance assessment that have room for improvement
WP9: PJ.01-03B
• The solution conducted a number of modelling, FTS, RTS exercises and assessments
• The Activity pack consisting of the connected deliverables were submitted
• The maturity assessment and maturity gate was undertaken against the target V2 maturity
• The project progress was accepted as good and in line with the expectations for V2-ongoing. The presented base for continuation to V2 is very clear with promising initial outcomes