Skip to main content
European Commission logo
English English
CORDIS - EU research results
CORDIS

Design of a flexible, scalable, high quality production line for PEMFC manufacturing

Project description

Scalable solution for fuel cell systems production

The use of fuel cell systems to generate electricity is increasing. However, the current manufacturing processes heavily rely on manual labour, which hinders their scalability. The EU-funded INLINE project aims to provide a solution for a manufacturing process that is scalable and more efficient. The project will focus on redesigning and optimising two crucial components: the media supply unit and the tank valve regulator. These are currently challenging to manufacture and are considered obstacles in the production process. INLINE will develop an integrated production line using simulation tools, allowing for the evaluation of various layouts, part flow strategies, and production scenarios. Additionally, the project will develop assembly station assistance systems aiming to enhance scalability by minimising the requirement for worker training.

Objective

The INLINE project aims at the solution of key challenges to enable the implementation of a scalable manufacturing process for fuel cell systems. Current manufacturing processes rely on manual work that has substantial limits in terms of cycle times, costs and scalability. Developments will start with the re-design and optimization of two key components: the media supply unit and the tank valve regulator. Both are components that are currently difficult to manufacture and are perceived as bottlenecks in the production process. Based on these new designs, an integrated production line will be planned using simulation tools. These tools will enable the evaluation of different layouts, part flow strategies and for different production scenarios. In terms of manufacturing tools, the end of line test will be improved to reduce cycle times by a factor of 3 and assistance systems for assembly stations will be developed that will enable scalability by reducing the need for training of workers. The overall target is to reduce the cycle time for production of a whole fuel cell system from 15 hours to less than 2.5 hours. Data gathering and analysis methods will be developed to enable the tracking of parts through the production line and - through a correlation of process and quality data - the continuous improvement of the production process.
Demonstration of the end of line test and the assistance system will be done in hardware. The whole production line will be evaluated using a simulation tool that has been verified on the current production process. A set of engineering samples of the re-designed tank valve regulator and the media supply unit will be produced and used for tests of the integrated fuel cells and for assessment of the whole production process.A potential of 250 new jobs in manufacturing of fuel cells and for production of the key components will be generated by the project.

Coordinator

PROFACTOR GMBH
Net EU contribution
€ 619 195,00
Address
IM STADTGUT D1
4407 STEYR GLEINK
Austria

See on map

Region
Westösterreich Oberösterreich Steyr-Kirchdorf
Activity type
Research Organisations
Links
Total cost
€ 619 195,00

Participants (4)