1.- WP1 (Project Management)
Related to the management of the TR4EMACS project. all tasks have been carried out in relation to this Work Package. Periodic meetings involving all the partners and the topic manager have been arranged to overview the advancements of the project. Various technical reviews have been organised (PDR, CDR, CISS, CIPS) for the Test benches with the attendance of all parties involved. Finally all the administrative and documentations tasks have been performed.
Progress: 100%
2.- WP2 (EMA Ailerons Test Bench)
This Work Package was completed entirely in this period. All the tasks were carried out successfully: the analysis of the requirements, the design and calculation (PDR and CDR), the manufacturing and the assembly, the validation (CISS and CIPS) and finally the power-or and integration at Airbus facilities
Progress: 100%
3.- WP3 (EMA Spoiler Test Bench)
This Work Package was completed entirely in this period. All the tasks were carried out successfully: the analysis of the requirements, the design and calculation (PDR and CDR), the manufacturing and the assembly, the validation (CISS and CIPS) and finally the power-or and integration at Airbus facilities.
Progress: 100%
4.- WP4 (EMA Flap-Tab Test Bench)
This Work Package was completed entirely in this period. All the tasks were carried out successfully: the analysis of the requirements, the design and calculation (PDR and CDR), the manufacturing and the assembly, the validation (CISS and CIPS) and finally the power-or and integration at Airbus facilities
Progress: 100%
1.2.5 WP5 (EMA Winglet Tab Test Bench)
This Work Package was completed entirely in this period. All the tasks were carried out successfully: the analysis of the requirements, the design and calculation (PDR and CDR), the manufacturing and the assembly, the validation (CISS and CIPS) and finally the power-or and integration at Airbus facilities.
Progress: 100%
1.2.6 WP6 (Supports of Rigs Integration)
The integration of thetest benches is completed. The Mechanical, Hydraulic and Electrical integration was carried out without incidents.
Progress: 100%
1.2.7 WP7(Dissemination and Exploitation)
The final plan for dissemination and exploitation of results was prepared (Deliverable D7.2). This document includes the Commercialization and Knowledge Management and Protection strategies as the Exploitation Plan.
Progress: 100%
Regarding the milestones and deliverables that were set in the beginning of the project, the status can be found in corresponding sections.