Skip to main content
Go to the home page of the European Commission (opens in new window)
English English
CORDIS - EU research results
CORDIS

Improving the economic feasibility of the biorefinery through catalysis engineering: enhancing the catalyst performance and optimizing valuable product yields

Objective

Catalytic pyrolysis of biomass is a process for the conversion of lignocellulosic biomass to a liquid product that has potential to be utilized as a fuel, a source of renewable chemicals and as an alternative to crude oil for upgrading to transportation fuels. ZSM-5 zeolite is the most studied catalyst for this process due to its acidity and shape-selectivity, which favour the conversion of biomass oxygenates to valuable aromatic hydrocarbons and limit the formation of coke. Among the shortcomings of the ZSM-5 zeolite is the small size of its pores; these small pores do not allow the large molecules in the pyrolysis vapours to access the active acid sites. Secondly, its sensitivity to biomass metals leads to poisoning and deterioration of its selectivity. Coupled with the high cost of the ZSM-5, the later leads to significant operating costs that arise from the necessity to replace the deactivated catalyst with fresh material at high rates.

The objective of this proposal is to investigate and improve on the economics of the process by reduction of catalyst-related operating costs and optimization of catalyst selectivity towards desirable products. This is going to be achieved through utilization of microporous zeolites modified with mesoporosity. Mixed results have been reported with such zeolites in the past. To address this, a suitable experimental procedure will be developed for the systematic study of mesoporosity through assessment of multiple aspects of catalyst performance, such as activity, selectivity, coke suppression and deoxygenation. Increased activity and selectivity is expected to result from increased accessibility of larger molecules to the zeolite acid sites. In order to address the short lifetime of the catalyst, the mechanism of poisoning from biomass metals will also be studied and modification of the catalyst, tentatively with implementation of materials more reactive to biomass metals, will be investigated in order to extend its lifetime.

Fields of science (EuroSciVoc)

CORDIS classifies projects with EuroSciVoc, a multilingual taxonomy of fields of science, through a semi-automatic process based on NLP techniques. See: https://op.europa.eu/en/web/eu-vocabularies/euroscivoc.

You need to log in or register to use this function

Programme(s)

Multi-annual funding programmes that define the EU’s priorities for research and innovation.

Topic(s)

Calls for proposals are divided into topics. A topic defines a specific subject or area for which applicants can submit proposals. The description of a topic comprises its specific scope and the expected impact of the funded project.

Funding Scheme

Funding scheme (or “Type of Action”) inside a programme with common features. It specifies: the scope of what is funded; the reimbursement rate; specific evaluation criteria to qualify for funding; and the use of simplified forms of costs like lump sums.

MSCA-IF-EF-ST - Standard EF

See all projects funded under this funding scheme

Call for proposal

Procedure for inviting applicants to submit project proposals, with the aim of receiving EU funding.

(opens in new window) H2020-MSCA-IF-2016

See all projects funded under this call

Coordinator

ASTON UNIVERSITY
Net EU contribution

Net EU financial contribution. The sum of money that the participant receives, deducted by the EU contribution to its linked third party. It considers the distribution of the EU financial contribution between direct beneficiaries of the project and other types of participants, like third-party participants.

€ 183 454,80
Address
ASTON TRIANGLE
B4 7ET Birmingham
United Kingdom

See on map

Activity type
Higher or Secondary Education Establishments
Links
Total cost

The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.

€ 183 454,80
My booklet 0 0