Deliverables
Report on the material and surface acceptance testing based on D5.1
Present re-circulation report assessing feasibility of powder re-use during processing
Periodic project reviews to take place every 6 months
Preparation and issuing of the final OSMOSIS project report
Produce a draft qualification plan for the OSMOSIS treatment with ESA
Test component in simulated environment (vacuum, vibration, etc.)
Compare results from first article surfaces produced with demonstration equipment (D1.1) to SoA results (D1.3)
Equipment integration and process implementation
Manufacture of small honeycomb panels in-house
Set up of demonstration unit for adhesion promotion in ENBIO
Process a flight representative component
ENBIO to attendhost dissemination events M12 M18 to promote the OSMOSIS brand
Searching for OpenAIRE data...
Publications
Author(s): Lorcan Byrne, Kevin Roche, Kevin McDonnell, Gary Morgan, Ismail Adeyemi, JosephMohan, Joe Flanagan, Kenneth Stanton, Barry Twomey
Published in: 14th ISMSE Conference Proceedings, 2018
Publisher: ISMSE
DOI: 10.5281/zenodo.3354386
Author(s): Lorcan Byrne
Published in: 14th ISMSE Conference Proceedings, 2018
Publisher: ISMSE
DOI: 10.5281/zenodo.3354395
Author(s): Lorcán Byrne
Published in: Zwick Academia Day 2018, 2018
Publisher: Zwick Academia Day 2018
DOI: 10.5281/zenodo.1252192