Skip to main content
European Commission logo print header

Content Personalisation Network

Resultado final

Technology bricks v1

This wil be the first version of the modules which will have been planned as necessary by Task 1.4 for the first prototype of the system. ATC will coordinate the delivery of this package of modules but each partner will be responsible for delivering their modules. A preliminary list of modules is included in the Task descriptions but this may change after T1.4 concludes.

Technology bricks v3

This will be the final version of the modules which will have been planned as necessary by Task 1.4 for the final prototype of the system. ATC will coordinate the delivery of this package of modules but each partner will be responsible for delivering their modules. A preliminary list of modules is included in the Task descriptions but this may change after T1.4 concludes.

Technical requirements (platform and service requirements)

In collaboration and extension of D1.1, D1.2 and D1.3 this deliverable will define the technical work plan and system requirements necessary to fulfil the goals.

First dissemination and exploitation strategy

This deliverable will report on the outcomes of T5.2 (focus on first exploitation activities in conjunction with the pilots), T5.3 (general overview) and T5.4 (focus on market analysis and business models) activities, as well as provide an updated dissemination and exploitation strategy (T5.1)

CPN business models and plans

This deliverable will provide detailed business models and plans for the CPN solutions. D5.5 will also report the results of the standardisation activities.

Cycle 2 piloting report

This deliverable contains the updated datasets, integrated product prototypes, detailed planning of the different pilot activities and validation results for cycle 2.

Content Right and distribution framework

The deliverable will collect and define the legal implications, with specific focus on content rights and distribution. Moreover this deliverable will focus on: a. Ontology Research & Impl /Creating an extensible ontology & distributed platform that allows for adherence to EU copyright and licensing laws and regulations), b. Smart contract network & platform, c. integration of and creation of smart contracts to handle purchase & licensing

Innovative CPN components

Along with work done in D1.1 and D1.2 we will work on gathering and descriptions of innovative components for personalisation. The key approach is to define modules which can be part of technical framework, including novel forms of content discovery, data analysis to understand user preferences and behaviour.

User Requirements Model

Based on focus groups research findings and design thinking workshops we develop a user perspective to be transformed into technical tasks for the platform An initial version will be presented and discussed early in the project

Cycle 3 piloting report

This deliverable contains the updated datasets, integrated product prototypes, detailed planning of the different pilot activities and validation results for cycle 3.

Cycle 1 piloting report

This deliverable contains the updated datasets, integrated product prototypes, detailed planning of the different pilot activities and validation results for cycle 1.

Initial design and APIs of Technology bricks

This will be the initial design of the modules which will have been planned as necessary by Task 1.4. ATC will coordinate the delivery of this but each partner will be responsible for delivering the design of their modules. A preliminary list of modules is included in the Task descriptions but this may change after T1.4 concludes.

Dissemination Plan

This deliverable will outline the dissemination strategy as an outcome of the first activities of T5.1

CPN Reference Architecture

The reference architecture design.

Technology bricks v2

This will be the second version of the modules which will have been planned as necessary by Task 1.4 for the second prototype of the system. ATC will coordinate the delivery of this package of modules but each partner will be responsible for delivering their modules. A preliminary list of modules is included in the Task descriptions but this may change after T1.4 concludes.

Initial available datasets and usage guidelines

This deliverable collects a description of the available data at the project start. It will be updated when new types of data become available during the project.

Final report on dissemination

This deliverable will provide a final overview of dissemination and exploitation activities, results of the business clinics with individual project partners, updates to the preferential business models and a plan for sustainable exploitation beyond the project lifetime.

User scenario definition

The gathered requirements will be used for a visual users scenario model, to be used for a modularized approach to development during the duration of the project. The scenario will take into account options to add, refine, re-calibrate key technology components of the project. The intention is to to provide clear guidance for the scope, technical requirements as well as features of the CPN platform.

Second report on dissemination and exploitation

Besides reporting on progress in T5.2 (concrete exploitation activities), T5.3 (dissemination overview) and T5.4 (focus on business models and business clinics), this deliverable will contain an initial plan for sustainable exploitation of CPN results

Data Management Plan

This deliverable will describe how the CPN project manages data throughout its life cycle, in order to be compliant to the regulatory framework.

CPN Open Virtual Platform v3

This deliverable provides the final version of the CPN virtual platform at the end of the third phase of the project..

CPN Open Virtual Platform v2

This version of the CPN virtual platform will be delivered in correspondence to the second phase of the project.

PDR integrated system with ledger based platform

Developing a production ready system of the Personal Data Receipts system and integrating it with other systems in the platform.

CPN Open Virtual Platform v1

The CPN virtual platform implemented according to reference architecture and supporting components interoperability mechanisms. Ths versions will be delivered in correspondence to the first phase of the project.

Publicaciones

Exploring the Value of Media User's Personal Information (PI) Disclosure to Media Companies in Flanders, Belgium

Autores: Natasja Van Buggenhout, Wendy Van den Broeck & Pieter Ballon
Publicado en: Mediální Studia / Media Studies, Edición 14(1), 2020, Página(s) 75-103, ISSN 2464-4846
Editor: Faculty of Social Sciences, Charles University, Smetanovo nábřeží 6, 110 00 Praha 1

Measuring and profiling for online personalization in media while protecting personal data?

Autores: van Zeeland, I., Ranaivoson, H., Hendrickx, J., Van der Bank, J. & Van den Broeck, W.
Publicado en: IAMCR conference 2019, 2019
Editor: IAMCR conference 2019

Have I got news for you! The challenges of news personalisation from an end user perspective.

Autores: Van den Broeck, W., Van Buggenhout, N., Lemmelijn, I., Mattheijssens, J., Van Lier, J.
Publicado en: NEM summit 2020, 2020
Editor: NEM

Buscando datos de OpenAIRE...

Se ha producido un error en la búsqueda de datos de OpenAIRE

No hay resultados disponibles