Skip to main content

PROGnostics based Reliability Analysis for Maintenance Scheduling

Deliverables

Data Management Plan - final

The data management plan reports how the project data has been handled during the research project and how it will be after the project completion. The document also provides an update of the project's consortium thoughts on data management and eventual results from third party exploitation of project generated data.

Data Management Plan - preliminary

The preliminary data management plan outlines how the project data is going to be handled both during the research project and after the project completion and includes the project's consortium thoughts on data management.

Project Web portal and Communication activities

This deliverable describes the project web site implementation of features, including the discussion forums and the management methods for project data. Instructions and functionalities available to consortium members and public users are provided here.

Dissemination and Communication Report – final

In this deliverable are listed all the consortium activities toward a proper dissemination of project solutions during the whole project. Firstly the intended audience is described, then a complete list of the publications on national and international journals, conference proceedings and presentations, articles on relevant press, conferences attended is provided. Finally the results of an internal evaluation of the dissemination activities are presented.

Searching for OpenAIRE data...

Publications

Maintenance schedule optimisation for manufacturing systems

Author(s): István Németh, Ádám Kocsis, Donát Takács, Basheer W. Shaheen, Márton Takács, Angelo Merlo, Amit Eytan, Luisa Bidoggia, Paolo Olocco
Published in: IFAC-PapersOnLine, Issue 53/3, 2020, Page(s) 319-324, ISSN 2405-8963
DOI: 10.1016/j.ifacol.2020.11.051

Towards accurate robot modelling of flexible robotic manipulators

Author(s): Z. Arkouli, P. Aivaliotis, S. Makris
Published in: Procedia CIRP, Issue 97, 2021, Page(s) 497-501, ISSN 2212-8271
DOI: 10.1016/j.procir.2020.07.009

Methodology for enabling Digital Twin using advanced physics-based modelling in predictive maintenance

Author(s): P. Aivaliotis, K. Georgoulias, Z. Arkouli, S. Makris
Published in: Procedia CIRP, Issue 81, 2019, Page(s) 417-422, ISSN 2212-8271
DOI: 10.1016/j.procir.2019.03.072

Identification of dynamic robot’s parameters using physics-based simulation models for improving accuracy

Author(s): P. Aivaliotis, E. Papalitsa, G. Michalos, S. Makris
Published in: Procedia CIRP, Issue 96, 2021, Page(s) 254-259, ISSN 2212-8271
DOI: 10.1016/j.procir.2021.01.083

The use of Digital Twin for predictive maintenance in manufacturing

Author(s): P. Aivaliotis, K. Georgoulias, G. Chryssolouris
Published in: International Journal of Computer Integrated Manufacturing, Issue 32/11, 2019, Page(s) 1067-1080, ISSN 0951-192X
DOI: 10.1080/0951192x.2019.1686173

Machines’ Behaviour Prediction Tool (BPT) for maintenance applications

Author(s): P. Aivaliotis, E. Xanthakis, A. Sardelis
Published in: IFAC-PapersOnLine, Issue 53/3, 2020, Page(s) 325-329, ISSN 2405-8963
DOI: 10.1016/j.ifacol.2020.11.052

Maintenance Service Platform (MSP) for maintenance information collection and sharing

Author(s): A. Eytan, A. Nichita
Published in: IFAC-PapersOnLine, Issue 53/3, 2020, Page(s) 330-335, ISSN 2405-8963
DOI: 10.1016/j.ifacol.2020.11.053

PROGRAMS project approach to maintenance management

Author(s): M. Surico, R. Ricatto, A. Merlo, I. Németh, A. Sardelis, M. Villoslada, E. Montejo, N. Frenkel, P. Aivaliotis, I.M. de la Pera Celada, J. Sidiropoulos, A. Eytan, A. Papavasileiou, F. Aggogeri
Published in: IFAC-PapersOnLine, Issue 53/3, 2020, Page(s) 313-318, ISSN 2405-8963
DOI: 10.1016/j.ifacol.2020.11.050

Robotic System Reliability Analysis and RUL Estimation Using an Iterative Approach

Author(s): Francesco Aggogeri, Riccardo Adamini, Panagiotis Aivaliotis, Alberto Borboni, Amit Eytan, Angelo Merlo, István Németh, Claudio Taesi, Nicola Pellegrini
Published in: Advances in Service and Industrial Robotics - Proceedings of the 28th International Conference on Robotics in Alpe-Adria-Danube Region (RAAD 2019), Issue 980, 2020, Page(s) 134-143
DOI: 10.1007/978-3-030-19648-6_16

A RUL calculation approach based on physical-based simulation models for predictive maintenance

Author(s): P. Aivaliotis, K. Georgoulias, G. Chryssolouris
Published in: 2017 International Conference on Engineering, Technology and Innovation (ICE/ITMC), 2017, Page(s) 1243-1246
DOI: 10.1109/ice.2017.8280022

Predictive maintenance framework: Implementation of local and cloud processing for multi-stage prediction of CNC machines’ health

Author(s): P. Aivaliotis, K. Georgoulias, R. Ricatto, M. Surico
Published in: 2018

Prognostics based Robust Design to strengthen mechanical system functionalities

Author(s): Francesco Aggogeri, Angelo Merlo, István Németh, Nicola Pellegrini, Alberto Borboni, Amit Eytan, Claudio Taesi
Published in: 2018

Design for Reliability of Robotic Systems Based on the Prognostic Approach

Author(s): Francesco Aggogeri, Nicola Pellegrini, Claudio Taesi, Monica Tiboni
Published in: 2019 23rd International Conference on Mechatronics Technology (ICMT), 2019, Page(s) 1-5
DOI: 10.1109/icmect.2019.8932106

Using digital twin for maintenance applications in manufacturing: State of the Art and Gap analysis

Author(s): Panagiotis Aivaliotis, Konstantinos Georgoulias, Kosmas Alexopoulos
Published in: 2019 IEEE International Conference on Engineering, Technology and Innovation (ICE/ITMC), 2019, Page(s) 1-5
DOI: 10.1109/ice.2019.8792613