Deliverables
A deployment plan based on: a) the building requirements, b) the DEDMF requirements, c) the deployment strategy, and d) the required procurement and installation activities. Associated Task: T4.4
This report will include include requirements (e.g. permissions, RFP regulations) and estimated timelines for the prerequisites satisfaction so as to facilitate timely preparation of the pilot sites that may operate under different regulatory, legal, cultural and market frameworks. Associated Task: T4.1
This document will define the standardization punch-lists, the concrete proposal for standards extensions that would be required in order to enable the benefits of the DRIMPAC system and overall approach. A preliminary version will be prepared on M18. Associated Task: T5.1
This report will capture the business cases and requirements of all DR stakeholders holistically so as to accurately set the context for the creation of the DRIMPAC solution. Associated Task: T1.3
This document will report the actions taken by the consortium and their results on the establishing the “User Group” and “Stakeholder Ecosystem” communities. Associated Task: T1.1
Recommendations regarding policy/regulation as well as market structures in order to create a friendlier environment for the adoption of DRIMPAC results to enhance active participation of energy consumers in markets and the proliferation of interoperable building automation technologies. First version. Associated Task: T5.3
This deliverable will contain the concrete technical specifications for the DRIMPAC IT system and its detailed system and software architecture. Plans for integration, testing and pre-validation deployment will be specified. Associated Task: T1.4
This deliverable will include a comprehensive Performance Measurement Verification methodology that will guide all pilot demonstration and validation activities of WP4 Associated Task T15
This document will provide an analysis on existing standards and protocols with the aim to identify their suitability or potential limitations to support the deployment and operation DRIMPAC business models Associated Task T21
A report on the preevaluation deployment and data gathering activities aiming to establish the proper onsite operation of the system and estimate the baseline at the pilot sites Associated Task T46
This deliverable will comprise an investigation of the existing offerings and business models of energy retailers and competitive entities, such as aggregators, and propose innovative business models including feedback from the Stakeholder Ecosystem. Associated Task: T1.2
This document will report the actions undertaken for the recruitment and preparation of the citizens who will participate in the pilot validation activities. Associated Task T4.2
This report is the second update of the Dissemination and Communication Plan DCP describing the projects strategy activities and implementation instruments including training activities Associated Task T61
Project branding as the forerunner to ensure a distinctive, attractive identity in all communication tools to be produced including: project logo, website graphic design templates, banners, leaflets, etc. Project website and social media channels establishment. Associated Task: T6.1
This report is the first update of the Dissemination and Communication Plan (DCP) describing the project’s strategy, activities and implementation instruments including training activities. Associated Task: T6.1
D6.2 DRIMPAC dissemination and communication plan and associated material
This deliverable will report the ontology based common information model developed in the project and its mapping to DR relevant standards like OpenADR and OneM2M Associated Task T22
Searching for OpenAIRE data...
Publications
Author(s): I. Poursanidis, G. Rancilio, E. Kotsakis, G. Fulli, M. Masera, M. Merlo
Published in: 11th IEEE PES Asia-Pacific Power and Energy Engineering proceedings, 2019
Publisher: IEEE
Author(s): Dimitrios Tzovaras, Ioannis Damousis, Antonis Papanikolaou, Giorgos Pitsiladis, Giulia Barbagelata
Published in: Sustainable Places 2019, Proceedings 2019, 20, 15, 2019
Publisher: MDPI
Author(s): D. Tzovaras, A. Papanikolaou, G. Pitsiladis, I. G. Damousis, G. Georghiou
Published in: 2019 1st International Conference on Energy Transition in the Mediterranean Area (SyNERGY MED), 2019, Page(s) 1-6, ISBN 978-1-7281-3087-3
Publisher: IEEE
DOI: 10.1109/synergy-med.2019.8764141
Author(s): Langovoy, M.
Published in: Proceedings of the 62-nd World Statistics Congress (2019), arXiv:1904.03909, 2019
Publisher: EPFL
Author(s): G. Navarro
Published in: La Verdad, 2019
Publisher: LA VERDAD MULTIMEDIA, S.A.
Author(s): A. Lucas, L. Jansen, N. Andreadou, E. Kotsakis, M. Masera
Published in: Energies, 2019, 12, 2725, 2019, ISSN 1996-1073
Publisher: Multidisciplinary Digital Publishing Institute (MDPI)