Deliverables
Situation regarding Business/end user requirements (D2.1), the policy and market context of pilot sites (D3.1), interoperability standards (D4.1), the first report on living labs (D7.6) as well as the first drafts of the market report (D8.3) and exploitation plan (D8.1)
HOLISDER Implicit Demand Response Framework and Associated StrategiesConfiguration of appropriate profiling models and services for defining and analysing the demand of elasticity in response to variable tariff schemes (implicit DR schemes) and definition of the specifications for a mobile and web energy monitoring and analytics application for consumers
Emerging Business Models and Standard Contract TemplatesDefinition of emerging and innovative DR business models and contract templates
HOLISDER Evaluation Framework and Respective Validation ScenariosDefinition of the global framework for the HOLISDER validation activities
HOLISDER Dissemination and Communication Plan and Associated Material Second VersionSecond version of the Dissemination and Communication Plan updating the project’s strategy, activities and means to be utilized
HOLISDER Market Report Second VersionSecond version of Market Intelligence Activities
Ex-Ante Pilot Audits and Pilot Deployment PlanDefinition of global schedule for the HOLISDER validation activities
HOLISDER Replication RoadmapRecommendations and a dedicated roadmap to ensure the successful and wide penetration of the project results in EU energy markets
Report on HOLISDER Framework deployment at Pilot Sites Final VersionSystem Deployment in the Pilot Sites. Final version
Policy and market reform recommendations report Final VersionRecommendations regarding policy/regulation as well as market structures
Regulatory, Market, Socio-economic and ethical context analysis in the pilot sites and anticipated (short- and mid-term) evolutionsAnalysis of the existing legislation and regulatory frameworks applied in the pilot sites territories with respect to buildings (building codes) and DR and identification of constraints and restrictions that need to be addressed for the smooth implementation of the project
Pilot Sites Baseline DefinitionCreation of a realistic and accurate consumption base-line
HOLISDER Living Lab Activities Evaluation Report First VersionFirst version of the Living Lab activities for engagement and training in the pilot sites
HOLISDER Market Report Third VersionThird version of Market Intelligence Activities
Report on activities for the promotion of HOLISDER standardization punch-listStandardization punch-list activities
Policy and market reform recommendations report Second VersionSituation regarding the second report on living labs (D7.7) and the second drafts of the market report (D8.4) and exploitation plan (D8.2)
Report on HOLISDER Framework deployment at Pilot Sites First VersionSystem Deployment in the Pilot Sites. First version
HOLISDER Framework Architecture including functional, technical and communication specificationsOverall architecture of the HOLISDER framework and the specifications of the key components and their functionalities
HOLISDER Dissemination and Communication Plan and Associated Material Forth VersionForth version of the Dissemination and Communication Plan describing the project’s strategy, activities and means utilized.
HOLISDER Living Lab Activities Evaluation Report Third VersionThird version of the Living Lab activities for engagement and training in the pilot sites
HOLISDER Dissemination and Communication Plan and Associated Material Third VersionThird version of the Dissemination and Communication Plan updating the project’s strategy, activities and means to be utilized
HOLISDER Dissemination and Communication Plan and Associated Material First VersionFirst version of the Dissemination and Communication Plan describing the project’s strategy, activities and means to be utilized
HOLISDER PMV Methodology SpecificationsPerformance Measurement and Verification Methodology (PMV) to be followed during the pilot validation activities of the project
HOLISDER Explicit Demand Response Framework and Integration into Holistic (Implicit-Explicit) DR Optimization StrategiesDR strategies to be applied at the building/ load level through the Local Demand Manager
End-user & business requirementsAnalysis of the end-user requirements in order to create the necessary inputs for defining the different components of HOLISDER within T2.4
HOLISDER Holistic Performance Evaluation, Impact Assessment and Cost-Benefit AnalysisAnalysis and evaluation of the pilot operation phase of the project across the pilot sites of HOLISDER
HOLISDER Common Information ModelDevelop a Common Information Model (CIM) to semantically and syntactically model all the necessary information for the development, installation, deployment, operation of the system as well as its integration in the EU energy market
HOLISDER Market Report First VersionFirst version of Market Intelligence Activities
Analysis of EU-wide interoperability standards and data models and harmonization requirementsReview the standardization landscape and evaluate latest evolutions in the fields of DR, interoperability between energy market stakeholders and communication between devices and systems
HOLISDER Living Lab Activities Evaluation Report Second VersionSecond version of the Living Lab activities for engagement and training in the pilot sites
Front end of the HOLISDER modules and solutions consisting in a wide range of interfaces
HOLISDER Interoperable Platform and Data Management Framework First VersionFirst version of the open and modular end-to-end interoperability and data management framework
HOLISDER Interoperable Platform and Data Management Framework Final VersionFinal version of the open and modular end-to-end interoperability and data management framework
Set up of the project web site and social media channels and design of the project branding
Data management life cycle for the data to be collected, processed and/or generated by HOLISDER project
Publications
Author(s):
Ander Romero-Amorrortu, Pablo de Agustín-Camacho, Olaia Eguiarte, George B. Huitema, Laura Morcillo, Milan Vukovic
Published in:
Proceedings, Issue 65/1, 2020, Page(s) 31, ISSN 2504-3900
Publisher:
MDPI
DOI:
10.3390/proceedings2020065031
Author(s):
George B. Huitema, Aliene van der Veen, Vasiliki Georgiadou, Michele Vavallo and Moisés Antón García
Published in:
Proceedings, 2020
Publisher:
MDPI
DOI:
10.3390/proceedings2020065007
Author(s):
Keko, Hrvoje; Babić, Lucija; Sučić, Stjepan; Luttenberger, Leila
Published in:
HRVATSKIOGRANAK MEĐUNARODNEELEKTRODISTRIBUCIJSKE KONFERENCIJE-HO CIRED, 2020
Publisher:
CIRED
DOI:
10.5281/zenodo.4693789
Author(s):
Ander Romero, Pablo De Agustin, Tasos Tsitsanis
Published in:
2018 IEEE International Conference on Environment and Electrical Engineering and 2018 IEEE Industrial and Commercial Power Systems Europe (EEEIC / I&CPS Europe), 2018, Page(s) 1-6, ISBN 978-1-5386-5186-5
Publisher:
IEEE
DOI:
10.1109/EEEIC.2018.8494522
Author(s):
Sarah Noyé, Unai Saralegui, Raphael Rey, Miguel Angel Anton, Ander Romero
Published in:
E3S Web of Conferences, Issue 111, 2019, Page(s) 05025, ISSN 2267-1242
Publisher:
EDP Sciences
DOI:
10.1051/e3sconf/201911105025
Author(s):
Hrvoje Keko, Hrvoje Keserica, Stjepan Sucic, Vladimiro Miranda
Published in:
2019 16th International Conference on the European Energy Market (EEM), 2019, Page(s) 1-5, ISBN 978-1-7281-1257-2
Publisher:
IEEE
DOI:
10.1109/eem.2019.8916567
Author(s):
Mente J. Konsman, Wilco E. Wijbrandi, George B. Huitema
Published in:
2020 IEEE Power & Energy Society Innovative Smart Grid Technologies Conference (ISGT), 2020, Page(s) 1-5, ISBN 978-1-7281-3103-0
Publisher:
IEEE
DOI:
10.1109/isgt45199.2020.9087658
Author(s):
Hrvoje Keko, Ivan Krajnović, Stjepan Sučić, Hrvoje Keserica
Published in:
14. savjetovanje HRO CIGRÉ, 2019
Publisher:
CIGRÉ Croatia
DOI:
10.5281/zenodo.4627714
Author(s):
Olaia Eguiarte, Antonio Garrido-Marijuán, Pablo de Agustín-Camacho, Luis del Portillo, Ander Romero-Amorrortu
Published in:
Energies, Issue 13/15, 2020, Page(s) 3939, ISSN 1996-1073
Publisher:
Multidisciplinary Digital Publishing Institute (MDPI)
DOI:
10.3390/en13153939
Author(s):
O. Eguiarte, P. de Agustín-Camacho, A. Garrido-Marijuán, A. Romero-Amorrortu
Published in:
Energy Reports, Issue 6, 2020, Page(s) 220-225, ISSN 2352-4847
Publisher:
Elsevier
DOI:
10.1016/j.egyr.2020.11.112
Author(s):
Santeri Rajala
Published in:
Master Thesis. Aalto University [dipl] Insinööritieteiden korkeakoulu, 2020
Publisher:
Aalto University
Author(s):
Mimmi Niemistö
Published in:
Master thesis. LUTPub, 2018
Publisher:
Lappeenranta University of Technology
Author(s):
Jesse Rehn
Published in:
Master Thesis. LUTPub, 2018
Publisher:
Lappeenranta University of Technology
Author(s):
Keko, Hrvoje; Sučić, Stjepan; Luttenberger Marić, Leila; Hasse, Peter; Isakovic, Karsten
Published in:
2021
Publisher:
HOLISDER & FLEXCoop H2020 projects
DOI:
10.5281/zenodo.4751175
Searching for OpenAIRE data...
There was an error trying to search data from OpenAIRE
No results available