Periodic Reporting for period 3 - ModulED (Modular Electric Drivetrains)
Période du rapport: 2020-10-01 au 2021-05-31
Upstream those concrete realizations, a lot of simulations, sizing, and optimization processes have been performed. Punch Powertrain has been helped by IKA & ZG. IKA realized simulations for the liquid cooling sizing. ZG realized mechanical simulations for the transmission and bearings. Brusa & CEA worked together on the injected magnet rotors. CEA, TU/e & Siemens are still working together on the control of the inverter and on the thermal modelling of the power electronics.
New generation of technologies, design methods, and integration methodologies were designed. They gave birth to a new generation of highly efficient, modular and powerful drivetrain. Future results by end of project will emphasize system optimization allow to have more compact and efficient system, outperforming State-of-the-Art electric vehicle drivetrains.