Skip to main content

Intelligent management system for integrated multi-trophic aquaculture

Deliverables

First version of IMTA Model focused on North Sea

D3.2 - First version of IMTA Model focused on North Sea [M14] This deliverable will report the IMTA Model for the pilot of the North Sea Farm

Pilots description and reference case studies for IMTA

D1.1 This deliverable will be a report that will reflect the outcomes of Task 1.1 in terms of the pilots description report and definition of reference case studies for IMTA

Report on compatible off-the-shelf sensors and specifications for novel sensors

D2.1 - Report on compatible off-the-shelf sensors and specifications for novel sensors [M9] This deliverable will report the outcomes of Task 2.1 in terms of commercially available sensors that are compatible with IMPAQT requirements and the specifications for new sensors development.

Analysis of Use Cases and Requirements

This deliverable will be based on Task 1.1 final outcome and will specify the technical, business and sustainability requirements that will drive the development of the Impaqt platform

- Draft Plan for the exploitation and dissemination

D6.3 - Draft Plan for the exploitation and dissemination [M12] This report will present the draft plan and activities of Tasks 6.1, 6.2, 6.4 and 6.5.

First version of Autonomous Data Acquisition and Communication Systems

D2.3- First version of Autonomous Data Acquisition and Communication Systems [M18] This deliverable will report on the first outcomes and integration of activities in WP2 together with preliminary on-lab validation results.

Specification on individual components of IMS and on their integration

D3.1- Specification on individual components of IMS and on their integration [M12] This deliverable reports the specifications for the components of Tasks 3.2, 3.3, 3.4 and the integration specification

– IADAS and DAS Architectural design

D2.2 – IADAS and DAS Architectural design [M12] This deliverable will report on the full design specifications of IADAS and DAS developed in tasks 2.3 and 2.4

- First version of Integrated Management System

D3.3 - First version of Integrated Management System [M18] This deliverable will report the first prototype of the Integrated Management System (IMS).

IMTA system design specifications

D1.3 - IMTA system design specifications [M9] This deliverable will be based on Tasks 1.2, 1.3 and 1.4 final outcomes and will specify the overall system design, including IMTA species list, IMTA system components/equipments list and end-to-end IMTA architectural design with emphasis on openness and aquaculture product quality and, safety.

Data Management Plan

D6.1 - Data Management Plan [M06] This report will present in detail the data management plan in accordance with European Commission guidelines

Searching for OpenAIRE data...

Publications

IoT for Aquaculture 4.0 Smart and easy-to-deploy real-time water monitoring with IoT

Author(s): Charlotte Dupont, Philippe Cousin, Samuel Dupont
Published in: 2018 Global Internet of Things Summit (GIoTS), 2018, Page(s) 1-5
DOI: 10.1109/giots.2018.8534581

Designing An IoT Cloud Solution for Aquaculture

Author(s): Ugur Acar, Frank Kane, Panagiotis Vlacheas, Vassilis Foteinos, Panagiotis Demestichas, Guven Yuceturk, Ioanna Drigkopoulou, Aycan Vargun
Published in: 2019 Global IoT Summit (GIoTS), Issue 2019, 2019, Page(s) 1-6
DOI: 10.1109/giots.2019.8766428

Modelling Data For A Sustainable Aquaculture

Author(s): Ahmed Abid, Charlotte Dupont, Franck Le Gall, Allan Third, Frank Kane
Published in: 2019 Global IoT Summit (GIoTS), 2019, Page(s) 1-6
DOI: 10.1109/giots.2019.8766376