Skip to main content
European Commission logo
English English
CORDIS - EU research results
CORDIS
CORDIS Web 30th anniversary CORDIS Web 30th anniversary

Environmentally efficient full profile drilling solution

Objective

The overall vision of the ECO-DRILLING project is to prototype, pilot, and commercialise our cost-effective and environmentally friendly full profile directional drilling technology for the global hydropower sector. ECO-DRILLING is the only solution capable of drilling upwards over long distances and high heads (up to 2km drilling length-1km altitude difference) using a non-rotatory drill string. Our disruptive technology has the potential to cut annual CO2 emissions with 13,860 tonnes in 5 years according to our sales proyections, reduce the environmental impact of drilling operations (e.g. by eliminating the need for building temporary access roads to the mountain top), and drilling costs by 50%. ECO-DRILLING will support the development of hydropower plants at locations currently unfeasible due to technical or environmental challenges.
We have defined a subset of specific objectives covering final prototyping, validation, and commercialisation readiness activities. Achieving them will bring us to a wide market uptake.
1) Technology maturation objectives (WP1) to optimise the functionalities of ECO-DRILLING’s subsystems and integrate them into the final prototype to be piloted in real-life settings, raising ECO-DRILLING TRL from TRL7 to TRL8.
2) Piloting and validation objectives (WP2) to demonstrate ECO-DRILLING’s technical and economic performance, functionality, and user benefits through a large-scale piloting in real-life operating settings, elevating eco-drilling from TRL8 to TRL9.
3) Commercialisation readiness objectives (WP3-6) enabling us to successfully bring the ECO-DRILLING service to the market and reach sales traction beyond Phase 2.
Through the ECO-DRILLING SME Phase 2 project we will significantly boost the growth in our company. We estimate that by year 5 after project closure, we will reach accumulated revenues of €138.0m generate at least 37 new full-time positions, and accumulate profits of €61.5m with 6.42 ROI.

Call for proposal

H2020-SMEInst-2016-2017

See other projects for this call

Sub call

H2020-SMEINST-2-2016-2017

Coordinator

NORHARD AS
Net EU contribution
€ 1 968 312,00
Address
FINSAVEIEN 9
4440 TONSTAD
Norway

See on map

SME

The organization defined itself as SME (small and medium-sized enterprise) at the time the Grant Agreement was signed.

Yes
Region
Norge Agder og Sør-Østlandet Agder
Activity type
Private for-profit entities (excluding Higher or Secondary Education Establishments)
Links
Total cost
€ 2 811 875,00