Livrables
This report includes all tests conducted on the small batch and results achieved
This report includes all tests conducted and results achieved
the report will describe the results achieved in the contribution to standards activities.
the deliverable will report the activities carried out during the first year of the project and the results achieved.
The deliverable will include the description of the test conducted on the 9 prototype cars, results achieved in comparison with expected performances
the deliverable will report the activities carried out during the second year of the project and the results achieved
This report includes all 33 separate Synthetic Gas tests conducted and results achieved.
Recherche de données OpenAIRE...
Publications
Auteurs: A Moschovi, S Souentie, I Yakoumis, A Siriwardana
Publié dans: 2018 IEEE International Conference on Environment and Electrical Engineering and 2018 IEEE Industrial and Commercial Power Systems Europe (EEEIC / I&CPS Europe), 2018, Page(s) 1-5, ISBN 978-1-5386-5186-5
Éditeur: IEEE
DOI: 10.1109/eeeic.2018.8493824