Prototype of full-scale Battery system
(opens in new window)
Full-scale prototype of battery system up and running. Report with a description of the design, specifications, test results and an overview of the prototype manufacturing as result of Task 4.1.
Prototype of full-scale Housing
(opens in new window)
Full-scale prototype of housing up and running. Report with a description of the design and an overview of the prototype manufacturing as result of Task 3.3.
Prototype of full-scale Parking station
(opens in new window)
Full-scale prototype of parking station up and running. Report with a description of the design and an overview of the prototype manufacturing as result of Task 3.4.
Full-scale YawSTOP pilot
(opens in new window)
Full-scale YawSTOP pilot up and running. Report with a description of the design and an overview of the pilot manufacturing as result of Task 5.1.
Prototype of full-scale Remote control unit
(opens in new window)
Full-scale prototype of remote control unit up and running. Report with a description of the design, hardware/software and an overview of the prototype manufacturing as result of Task 4.3.