Skip to main content
European Commission logo
français français
CORDIS - Résultats de la recherche de l’UE
CORDIS
CORDIS Web 30th anniversary CORDIS Web 30th anniversary
Contenu archivé le 2024-04-15

Advanced Control Real-Time CIM Systems and Concepts for Flexible Automation

Objectif

The objective of this project was to develop, implement and integrate advanced control system techniques to improve the control of manufacturing systems for small-batch production machined parts at the machine and cell level. The system developed is modular, to allow progressive implementation, and has been demonstrated in real production environments. Work on the project included:
-integrating advanced information processing techniques into machine control systems
-developing data capture and analysis techniques to treat system perturbations in real time
-adopting and implementing standard interfaces between the system and CAD, CAM, CAE and CAP systems.
The objective of this project was to develop, implement and integrate advanced control system techniques to improve the control of manufacturing systems for small batch production machined parts at the machine and cell level. The system developed is modular, to allow progressive implementation, and has been demonstrated in real production environments. Work on the project included: integrating advanced information processing techniques into machine control systems, developing data capture and analysis techniques to treat system perturbations in real time and adopting and implementing standard interfaces between the system and computer aided design (CAD), computer aided manufacture (CAM), computer aided engineering (CAE) and computer aided production (CAP) systems.
The integration of the system was completed, with a successful demonstration of the initial linking of the information with the scheduling and monitoring systems. The expert system shell was completed.
The integration of the system was completed, with a successful demonstration of the initial linking of the information with the scheduling and monitoring systems. The expert system shell was completed. The results of the research have been implemented at the demonstration site at Morskate BV in the Netherlands.
Exploitation
The major impact will be to decrease the lead time for the manufacture of small batches of machined parts and to increase system availability. An important feature of the modules being developed will be that they can be retrofitted to existing production systems, allowing progressive advances in the level of automation.
The system, including DNC and machine monitoring, has been installed. Exploitation of control, data capture and analysis, and decision support systems will follow.

Thème(s)

Data not available

Appel à propositions

Data not available

Régime de financement

Data not available

Coordinateur

TDS Dextralog Ltd
Contribution de l’UE
Aucune donnée
Adresse
Whitebirk Estate Hillside
BB1 5SN Blackburn
Royaume-Uni

Voir sur la carte

Coût total
Aucune donnée

Participants (4)