The SF-TLS with a range of up to 120m was designed to be thrown horizontally over a river or valley. After reaching the opposite margin, the system self-propels its own support, which is capable of adjusting to the natural terrain conditions.
The modules of the bridge are connected to each other by quick connections (bolted and pinned) together with the base module of the boom. After bridge installation, the telescopic boom will be shortened without recourse to any external means.
We’ve intended to mature our solution’s business plan and define future strategies to enhance the solution market introduction.
BERD evaluated several feasibility aspects in terms of operations, technical, legal/standards, costs and schedule. A detailed market study involving the direct contact with the potential buyers - infrastructure managers, civil protection responsible and contractors’ procurement in developed markets were partially done and introduced importante data to accurate the SF-TLS business plan.