Integrated Modular Energy Systems and Local Flexibility Trading for Neural Energy Islands

Resultado final

Assessment of MERLON business models and evaluation of network related charges - First Version

The deliverable will perform the evaluation of the business models developed in D101

Austrian Pilot Site Baseline Definition

The deliverable will define a realistic and accurate baseline considering the methodology specified in T33 to be used as a reference for the installation sizing and design activities the project validation activities as well as during the impact assessment phase in the Austrian Pilot Site

MERLON PMV Methodology Specifications

The deliverable will define in detail the Performance Measurement and Verification Methodology (PMV) for defining the baseline and monitoring the performance of the MERLON ILES post-intervention.

ILESEM Pre-trial validation testing results

The deliverable will report on the testing activities that will be carried out to ensure problemfree functional operation of the ILESEM in lab environment

Definition of MERLON Business Models for ILES and flexibility markets - Final Version

The deliverable will update D101 based on the findings of the 1st phase of the pilot rollout

Report on Community Recruitment Activities

The deliverable will report on the activities undertaken and results achieved with regards to the engagement and recruitment of local prosumers into the MERLON marketplace and overall project activities

Grid Integration and Standardization Recommendations - First Version

The deliverable will consist in a standardization punchlist as derived from the first rollout phase of the MERLON solution

Definition of MERLON Business Models for ILES and flexibility markets - First Version

The deliverable is concerned with the development of new business models for integrated local energy systems that will be able to integrate within current market and regulatory frameworks in addition to novel models that will assume that the disruptive MERLON concept will be steeply up-taken

MERLON Holistic Performance Evaluation, Impact Assessment and Cost-Benefit Analysis - First Version

The deliverable comprises the overall evaluation of the MERLON framework following the 1st phase of rollout considering User Experience evaluation of impact of the MERLON framework and costbenefit analysis of the integrated MERLON solution

User, business and grid requirements analysis for integrated local energy systems optimization

This deliverable will focus on the definition of the MERLON Business Scenarios and Use Cases and will end-up to the extraction of respective high-level user requirements for the Integrated MERLON Framework.

MERLON Framework Architecture including functional, technical and communication specifications - First Version

The deliverable consists in the detailed design of the conceptual architecture and specifications of the MERLON framework (functional components, interoperability aspects, internal and external interfaces, technical specifications and non-functional specifications).

Report and Evaluation of Collaborative Activities with similar projects and BRIDGE Initiative - Second Version

The deliverable will report on implemented activities and update the schedule for the collaboration activities with BRIDGE and other similar projects.

Report and Evaluation of Collaborative Activities with similar projects and BRIDGE Initiative - Final Version

The deliverable will consolidate all collaboration activities with BRIDGE and similar projects

Grid Integration and Standardization Recommendations - Final Version

The deliverable will consist in a standardization punchlist as derived from the second rollout phase of the MERLON solution

Ex-Ante Pilot Audits and Pilot Deployment Plan in Spain

The deliverable will report on the ex-ante surveys conducted with regards to the Spanish pilot site and detail the equipment deployment plan in pilot premises

MERLON Living Lab Activities Planning and Evaluation Report - Third Version

The deliverable will report on implemented activities and update the schedule for the activities of the MERLON Living Lab

MERLON Common Information Model

The deliverable consists in the high level domain model comprising the basic elements (semantic concepts, events, relations and respective data models etc.) underlying the MERLON ILES Framework.

Report on DERs Flexibility Analysis

The deliverable will configure DER device models to define and formalize their control and response capabilities to achieve specific flexibility levels.

MERLON Living Lab Activities Planning and Evaluation Report - Final Version

The deliverable will consolidate all implemented activities of the MERLON Living Lab

Assessment of MERLON business models and evaluation of network related charges - Final Version

The deliverable will update D102 focusing on the evaluation of the updated business models reported in D107

Policy and market reform recommendations report - First Version

The deliverable will consist in a bundle of policy and market reform recommendations as derived from the first rollout phase of the MERLON solution

MERLON Evaluation Framework and Respective Validation Scenarios - First Version

The deliverable will provide the necessary methodological pathway to enable the holistic evaluation and impact assessment of the MERLON project, following the pilot roll-out phase.

MERLON Living Lab Activities Planning and Evaluation Report - Second Version

The deliverable will report on implemented activities and update the schedule for the activities of the MERLON Living Lab.

MERLON Framework Architecture including functional, technical and communication specifications - Final Version

The deliverable will update the initial design of the MERLON framework based on findings and issues faced during the development integration and deployment activities of the project

Socio-economic and regulatory obstacles to innovation on Integrated Local Energy Systems

The deliverable will analyse the prevailing legislation and regulatory frameworks in the pilot sites with respect to LES and identify constraints and restrictions for the smooth introduction of innovative technologies and business models in energy markets.

MERLON Evaluation Framework and Respective Validation Scenarios - Final Version

The deliverable will update D83 following findings identified during the deployment phase in the pilot sites

Analysis of EU-wide interoperability standards and data models and harmonization requirements

The deliverable will review the standardization landscape and evaluate the latest evolutions in DR, interoperability between energy market stakeholders and communication between devices and systems.

MERLON Common Information Model - Final Version

The deliverable is the final version of the high level domain model comprising the basic elements semantic concepts events relations and respective data models etc underlying the MERLON ILES Framework

MERLON Holistic Performance Evaluation, Impact Assessment and Cost-Benefit Analysis - Final Version

The deliverable comprises the overall evaluation of the MERLON framework following the 2nd phase of rollout considering User Experience evaluation of impact of the MERLON framework and costbenefit analysis of the integrated MERLON solution

Policy and market reform recommendations report - Final Version

The deliverable will consist in a bundle of policy and market reform recommendations as derived from the second rollout phase of the MERLON solution

Spanish Pilot Site Baseline Definition

The deliverable will define a realistic and accurate baseline considering the methodology specified in T33 to be used as a reference for the installation sizing and design activities the project validation activities as well as during the impact assessment phase in the Spanish Pilot Site

MERLON Living Lab Activities Planning and Evaluation Report - First Version

The deliverable will provide an initial schedule for the activities of the MERLON Living Lab.

Report and Evaluation of Collaborative Activities with similar projects and BRIDGE Initiative - First Version

The deliverable will provide an initial plan for the collaboration activities with BRIDGE and other similar projects.

Report and Evaluation of Collaborative Activities with similar projects and BRIDGE Initiative - Third Version

The deliverable will report on implemented activities and update the schedule for the collaboration activities with BRIDGE and other similar projects

Ex-Ante Pilot Audits and Pilot Deployment Plan in Austria

The deliverable will report on the ex-ante surveys conducted with regards to the Austrian pilot site and detail the equipment deployment plan in pilot premises

MERLON Dissemination and Communication Plan and Associated Material - Third Version

The deliverable will report on implemented activities and update the schedule for the dissemination and communications activities of the Project

MERLON Dissemination and Communication Plan and Associated Material - Second Version

The deliverable will report on implemented activities and update the schedule for the dissemination and communications activities of the Project.

MERLON Dissemination and Communication Plan and Associated Material - First Version

The deliverable will provide the initial schedule for the dissemination and communications activities of the Project.

MERLON Dissemination and Communication Plan and Associated Material - FInal Version

The deliverable will consolidate all dissemination and communication activities of the project

MERLON Interoperability and Data Management Framework - First Version

The deliverable refers to the detailed design and development of the MERLON Interoperability and Data Management Framework (sub-modules, interfaces, data flows etc) in line with the overall project specifications.

MERLON ILES Operation Forecasting: Algorithm and FAT Acceptance - Final Version

The deliverable will update D71 based on updated specifications and deployment findings

MERLON VPP Configurator and Control Dispatch Module - First Version

The deliverable will provide the algorithmic framework and decisionmaking tools for continuously analysing demand storage flexibility along with signals coming from the DSO side and onthefly optimize decisionmaking about the optimal configuration of demandbased dynamic Virtual Power Plants VPPs to timely respond and provide the required flexibility to the grid

MERLON Scheduling Module: Algorithm and FAT Acceptance - First Version

The deliverable will develop a scheduling mechanism that will be used to define the schedule of each controllable device within the ILES

MERLON Simulation-based planning and sizing module - First Version

The deliverable consists in a module that enables the simulation of the MERLON scenarios in real-time and facilitates the study of particularly critical phenomena for the ILES including transient analysis, power quality and battery system behaviour.

Integration of the ILESEM platform and end-user interfaces - First Version

The deliverable consists in the integrated version of the MERLON ILESEM framework and associated User Interfaces for the various actors involved in its operation

MERLON Virtual Thermal Energy Storage Component - First Version

The deliverable will define the specifications for the configuration and develop an intelligent thermal storage software component applicable to various building types independent of their size, use and construction characteristics

Integration of the ILESEM platform and end-user interfaces - Final Version

The deliverable will update D75 based on updated specifications and deployment findings

Blockchain-Enabled Flexibility Marketplace and Contract Templates - First Version

The deliverable will develop the mechanisms and tools that will allow local flexibility sources prosumers to engage in local flexibility market transactions through an open marketplace

MERLON Scheduling Module: Algorithm and FAT Acceptance - Final Version

The deliverable will update D72 based on updated specifications and deployment findings

MERLON Virtual Thermal Energy Storage Component - Final Version

The deliverable will update D63 based on updated specifications and deployment testing findings

MERLON Interoperability and Data Management Framework - Second Version

The deliverable consists in an updated and more mature version of the MERLON Interoperability and Data Management Framework in line with the updated project specifications

Blockchain-Enabled Flexibility Marketplace and Contract Templates - Final Version

The deliverable will update D73 based on updated specifications and deployment findings

MERLON planning and optimisation algorithms under demand and generation evolution

The deliverable refers to the development of planning algorithms that simulate the operation of the electrical network in appropriate horizons (related to regulatory regimes and asset lifetimes) to automatically calculate distribution reliability, performance and power quality metrics based on equipment characteristics and planned/unplanned events.

MERLON Interoperability and Data Management Framework - Final Version

The deliverable consists in the final version of the MERLON Interoperability and Data Management Framework in line with findings from pilot deployment and testing

MERLON Simulation-based planning and sizing module - Final Version

The deliverable will update D53 based on updated specifications and findings from pilot deployment and testing

MERLON ILES Operation Forecasting: Algorithm and FAT Acceptance - First Version

The deliverable will configure a short to medium term forecasting module that will be used to obtain the baseline loading conditions at the Point of Common Coupling PCC between the ILES and the upstream distribution network

MERLON VPP Configurator and Control Dispatch Module - Final Version

The deliverable will update D65 based on updated specifications and deployment testing findings

MERLON Flexibility Forecasting, Segmentation and Aggregation Module - Final Version

The deliverable will update D64 based on updated specifications and deployment testing findings

MERLON Flexibility Forecasting, Segmentation and Aggregation Module - First Version

The deliverable consists in the design and implementation of the main Visual Analytics platform for the Aggregator, which will allow for multi-parameter criteria Analysis over consumer portfolios, addressing technical as well as market potential. The tool will allow for the historical analysis of demand flexibility data (as acquired from the MERLON pilot sites) enabling the realization of forecasting, segmentation and clustering functions as part of the aggregator operations introduced in the project.

MERLON ILES models and simulation scenarios

The deliverable will focus on the provision of realistic models of the pilot networks (Spain, Austria) in Matlab/Simulink and development of simulation scenarios that capture the anticipated evolution of the pilot networks and their assets.

MERLON Flexibility Profiling Mechanism and Holistic Flexibility Profiles for Prosumers and EVs

The deliverable consists in the definition and configuration of the MERLON Flexibility Profiling Framework enabling the extraction of context-aware demand flexibility profiles for the different demand assets introduced in MERLON.

Data Management Plan

The deliverable will elaborate the Data Management Plan DMP of the project comprising of i handling of research data during after the project ii what data will be collected processed or generated iii what methodology standards will be applied and iv whether data will be shared made open access how data will be curated and preserved

Publicaciones

Very Short to Medium-term Demand and Generation Forecast: A Study Case in Austria

Autores: M Santos, D Huo, M Resch, N Wade, D Greenwood
Publicado en: CIRED 2021 - The 26th International Conference and Exhibition on Electricity Distribution, 2021
Editor: CIRED 2021
DOI: 10.1049/icp.2021.2125

Energy Communities: How Tools Can Facilitate Their Enhancement

Autores: Alessandra Cuneo, Pierre-Jacques Le Quellec, Tanguy Choné, Gabriele Comodi, Katerina Valalaki, Katerina Samari and Tomi Medved
Publicado en: Sustainable Places 2021, 2021
Editor: MDPI
DOI: 10.3390/environsciproc2021011013

Analysis of Electric Vehicle (EV) cost-based charging load profiles

Autores: E. Koutsi, S. Deligiannis, G. E. Athanasiadou, D. A. Zarbouti and G. V. Tsoulos
Publicado en: Sustainable Places 2020, 2020
Editor: MDPI
DOI: 10.13140/rg.2.2.32913.92007

Forecasting electric energy demand for V2G and G2V systems under different charging profiles

Autores: S.Deligiannis, E.Koutsi, G.Athanasiadou, D.Zarbouti, G.Tsoulos
Publicado en: 7th International Conference on Energy, Sustainability and Climate Change, 2020
Editor: University of Thessaly, Greece

Business models and barriers towards the development of local energy systems in Europe: Insights from the MERLON project

Autores: D. Papadaskalopoulos, M. Woolf, N. Chrysanthopoulos and G. Strbac
Publicado en: CIRED 2021, 2021
Editor: IET
DOI: 10.1049/icp.2021.1619

Optimal battery sizing for a distribution network in Austria to maximise profits and reliability

Autores: Da Huo, Marcos Santos, David Greenwood, Neal Wade, Markus P. Resch
Publicado en: CIRED Workshop 2020, 2020
Editor: IET

Towards a Modular Energy Systems Framework for neural energy islands

Autores: Konstantinos Tsatsakis, Giorgos Papadopoulos
Publicado en: 13th International Conference on Energy and Climate Change and 7th Green Energy Investments Forum, 7-9 October 2020, 2020
Editor: KEPA UoA

Local distribution network management through optimal flexibility scheduling: the Austrian pilot of the Horizon 2020 MERLON project

Autores: Da Huo, Neal Wade, David Greenwood, Philipp Novakovits, Joachim Hacker, Dimitrios Papadaskalopoulos, Nikolaos Chrysanthopoulos, Goran Strbac, Markus Resch, Uma Rajarathnam, Katerina Valalaki, Vasiliki Katsiki
Publicado en: 2021 9th IEEE International Conference on Power Systems (ICPS), 2021
Editor: IEEE
DOI: 10.1109/icps52420.2021.9670280

Flexibility Scheduling for Distribution Systems: A Case Study in Austria

Autores: D Huo, M Santos, J McGrath, N Wade, D Greenwood
Publicado en: CIRED 2021 - The 26th International Conference and Exhibition on Electricity Distribution, 2021
Editor: CIRED 2021
DOI: 10.1049/icp.2021.2081

Reliability assessment of island multi‐energy microgrids

Autores: M Santos, D Huo, N Wade, D M Greenwood, I Sarantakos
Publicado en: Energy Conversion and Economics, 2021, ISSN 2634-1581
Editor: IET
DOI: 10.1049/enc2.12040

A reliability-aware chance-constrained battery sizing method for island microgrid

Autores: D Huo, M Santos, I Sarantakos, M Resch, N Wade, D M Greenwood
Publicado en: Energy, 2022, ISSN 0360-5442
Editor: Pergamon Press Ltd.
DOI: 10.1016/j.energy.2022.123978

Chance-constrained optimization for integrated local energy systems operation considering correlated wind generation

Autores: D Huo, C Gu, D Greenwopod, Z Wang, P Zhao, J Li
Publicado en: International Journal of Electrical Power & Energy Systems, 2021, ISSN 0142-0615
Editor: Elsevier BV
DOI: 10.1016/j.ijepes.2021.107153

Minimizing the Cost of PHEV Usage with Price Sensitive Charging Strategies

Autores: Zarbouti, Dimitra and Koutsi, Elisavet and Athanasiadou, Georgia and Tsoulos, George
Publicado en: Electricity, 2021, ISSN 2673-4826
Editor: MDPI
DOI: 10.3390/electricity2040027

Buscando datos de OpenAIRE...

Se ha producido un error en la búsqueda de datos de OpenAIRE

No hay resultados disponibles