Deliverables
A Data Management Plan (DMP) will developed.
D2.2 is the report on Task 2.2 results.
The results from Tasks 31 32 and 33 will first be collected in the Green paper D31 in Task 35 This will be the basis for WP 4 and Task 34
D2.3 is the report on the results of task 2.3. It will be the basis for the Strategy Plan to be developed in Task 2.4.
The Development Strategy Plan D24 will be guiding WP 3 for the development phase of the draft enhanced assessment and certification scheme as well as the tools needed and the Deep Renovation Network Platforms Tasks 31 to 33
The White paper is an update of D31 Green paper after the testing of pilot cases WP 4 and the dialogue in Task 34 It serves as the basis for WP 5
A brief report D41 with the list of pilot projects with basic data that can be published brief description of the building and compliance with selection criteria
Based on the input data, Wuppertal Institut and EAP will conduct a cross-country comparison in a matrix (D2.1) that will be used to outline the current EPC practices across the EU, their comparability, compliance with EU legislation, and to which extend they differ or converge.
E-P-C will develop and host a publicly accessible project website (D6.1). Each partners’ websites will be linked to the project website.
Searching for OpenAIRE data...