Periodic Reporting for period 1 - PIPESCANNER (Precise Condition Assessment of Metallic Pipes Dramatically Reducing Maintenance and Investment Cost in District Heating and Drinking Water Pipe Networks by pinpointing Pipe Segments to be replaced)
Reporting period: 2020-01-01 to 2020-04-30
Summary of the context and overall objectives of the project
Work performed from the beginning of the project to the end of the period covered by the report and main results achieved so far
Progress beyond the state of the art and expected potential impact (including the socio-economic impact and the wider societal implications of the project so far)