Livrables
This document describes all the activities and outcomes of the project. It constitutes the synthesis of all the project results and lessons learnt, including the recommendations for future actions and roadmap towards industrialised products.
Data Management Plan V2The data management plan describes all the measures taken to make project data FAIR ( Findable, Accessible, Interoperable and Re-usable) and identifies all the data sets that will be managed during and after the project to warrant the IPRs. Version V2
Project and Risk Management PlanThe document describes the organization and procedures put in place in the project to warrant that the outputs are produced on quality, on time and on cost. The risk management is an important part of the process to avoid any unwanted surprise.
Final assessment and recommendations for the futureThis deliverable presents the final assessment of the project outcomes (system) and the recommendations proposed for the next steps of industrialization of the platform.
Pilots' Events 2 Reports (including questionnaires and training)This deliverable gathers the results of the end-user training sessions and the answers to the assessment questionnaire for wave 2 of the project events.
5D-AeroSafe System integration report V2This deliverable is the integration and validation report for the second version of 5D-AeroSafe system (V1). It consists in the assessment of the system through the integration tests from a technical and from an operational point of view.
Dissemination and Communication Plan V2This deliverable describes the planning of all the events in which 5DAeroSpace will participate and describe the participation presentations documents demonstrations It also describes the dissemination actions during the lst 18 months
Pilots' Events 1 Reports (including questionnaires and training)This deliverable gathers the results of the enduser training sessions and the answers to the assessment questionnaire for wave 1 of the project events
Dissemination and Communication Plan V1This deliverable describes the planning of all the events in which 5DAeroSpace will participate and describe the participation presentations documents demonstrations It also describes the dissemination actions during the first 18 months
Exploitation Plan V2This deliverable is the final version of the exploitation for the system. It comprises the exploitable foreground, the business cases, the business models, the SWOT analysis with the competition and benchmarking and the exploitation strategies (consortium and individual).
Pilots planning documentThis deliverables presents the planning of all the tests and demonstrations of the system (V1 and V2). It comprises factory tests and field tests and demonstrations in all the locations chosen.
5D-AeroSafe System integration report V1This deliverable is the integration and validation report for the first version of 5D-AeroSafe system (V1). It consists in the assessment of the system through the integration tests from a technical and from an operational point of view.
Synthesis of the Regulatory Framework and Concept of Operations V1This document makes a synthesis of all legal texts and procedures that regulate the use of UAVs in the airspace in general and in the environment of airports airfiedls and waterways in particular This document will be used for the system design to be sure that the project does not violate any rule taking into account today situation and possible evolutions Version V1
Pilots assessment V1This deliverable is the assessment of the system V1 from an operational point of view (evaluation by end-users and stakeholders) and from a technical point of view (technical partners and external experts).
Project and risk management Plan V2The document describes the organization and procedures put in place in the project to warrant that the outputs are produced on quality on time and on cost The risk management is an important part of the process to avoid any unwanted surprise V2
Use Cases DefinitionThe report presents all the scenarios in which the UAVs can be involved during calibration or inspection phases The document will be an important input to define the concept of operations of 5DAeroSafe system
Pilots assessment V2This deliverable is the assessment of the system V2 from an operational point of view (evaluation by end-users and stakeholders) and from a technical point of view (technical partners and external experts).
Synthesis of the Regulatory Framework and Concept of Operations V2This document makes a synthesis of all legal texts and procedures that regulate the use of UAVs in the airspace in general and in the environment of airports, airfiedls and waterways in particular. This document will be used for the system design to be sure that the project does not violate any rule (taking into account today situation and possible evolutions). Version V2.
Project and risk management Plan V3The document describes the organization and procedures put in place in the project to warrant that the outputs are produced on quality, on time and on cost. The risk management is an important part of the process to avoid any unwanted surprise.
Pilots' Events 3 Reports (including questionnaires and training)This deliverable gathers the results of the end-user training sessions and the answers to the assessment questionnaire for wave 3 of the project events.
User Workshop and ReportThis deliverable is the report of the first project workshop with the endusers and stakeholders to define the requirements that will support the development of the system
Exploitation Plan V1This deliverable is the first version of the exploitation for the system It comprises a first view of the exploitable foreground and the exploitation strategies consortium and individual
Data Management Plan V1The data management plan describes all the measures taken to make project data FAIR ( Findable, Accessible, Interoperable and Re-usable) and identifies all the data sets that will be managed during and after the project to warrant the IPRs. Version V1
The preliminary data management plan describes the sets of data that will be used in the project it specifies which sets of data will be public in the frame of ORDP
This deliverable consists in the second set of videos that will be used to support the project dissemination.
Pilot videos 3This deliverable consists in the third set of videos that will be used to support the project dissemination.
Project Videos 1This deliverable consists in the first set of videos that will be used to support the project dissemination
Project Dissemination Materials (project factsheet/leaflet, presentation and website)This deliverable is composed of the project website and the initial communication data set that will be used during the dissemination events and the meetings where the partners will present the project
Publications
Auteurs:
GRACE KHAYAT, CONSTANDINOS X. MAVROMOUSTAKIS, ANDREAS PITSILLIDES, JORDI MONGAY BATALLA,
EVANGELOS K. MARKAKIS, GEORGE MASTORAKIS
Publié dans:
IEEE ACCESS, Numéro VOLUME 11, 2023, 2023, Page(s) 56310 - 56323, ISSN 2169-3536
Éditeur:
Institute of Electrical and Electronics Engineers Inc.
DOI:
10.1109/access.2023.3282441
Auteurs:
Przemysław MĄDRZYCKI, Robert GRZESIAK, Paweł KALINOWSKI, Dariusz
KARCZMARZ
Publié dans:
Maritime Security Yearbook 2022; XVI : 455-469, Numéro yearly (2022), 2022, ISSN 1898-3189
Éditeur:
Naval Academy
DOI:
10.5604/01.3001.0016.2033
Auteurs:
Przemyslaw MADRZYCKI, Dariusz KARCZMARZ, Robert GRZESIAK
Publié dans:
. 3rd International Conference on Electrical, Computer, Communications and Mechatronics Engineering (ICECCME), Numéro 19-21 July 2023, 2023, ISBN 979-8-3503-2297-2
Éditeur:
IEEE
DOI:
10.1109/iceccme57830.2023.10252892
Auteurs:
Nikolaos Astyrakakis, Dimitra Papatsaroucha, Pityanou Konstantina, Fanourios Fakoukakis,
Nikolaos Zotos, Marinos Kardaris, George Bogdos, Evangelos Markakis
Publié dans:
Aerospace Europe Conference 2023, Numéro 10ᵀᴴ EUCASS – 9ᵀᴴ CEAS, 2023, Page(s) https://www.eucass.eu/conferences-and-publications/search-on-this-website?searchword=eucass2023%20astyrakakis&searchphrase=all&limit=20&areas[0]=doc_indexer
Éditeur:
EUCASS
DOI:
10.13009/eucass2023-676
Auteurs:
Pablo Alonso, Jon Ander Iñiguez de Gordoa, Juan
Diego Ortega, Sara García, Francisco Javier Iriarte, Marcos Nieto,
Publié dans:
Proc. SPIE 12701, Fifteenth International Conference on Machine Vision (ICMV 2022), Numéro 1270118 (7 June 2023), 2023
Éditeur:
NA
DOI:
10.1117/12.2679734
Recherche de données OpenAIRE...
Une erreur s’est produite lors de la recherche de données OpenAIRE
Aucun résultat disponible