TRansmission system enhancement of regIoNal borders by means of IntellIgenT market technologY

Deliverables

Dissemination, Communication and Cooperation activities Report (v1)

A report will be generated after each of the planned workshops, dissemination and synergies activities containing the minutes, report, photo or video overview of the meeting, presentation used, participants list or number of people present, and feedback from- if appropriate-: the advisory board, the user group, people present. Related tasks: T9.1, T9.2, T9.3, T9.4

Deployment and evaluation Plan

Deployment plans to be followed in WP7 and evaluation plans to be followed by WP8 Related Task T71

TRINITY architecture

Description of the open, secure and flexible architecture designed during this WP. Related Task: T2.3.

IMC, OTCM and ASM analysis

D3.1 will report the results of the analysis of intraday and reserve markets. Related Task: T3.1.

TRINITY Use cases, requirements and KPIs definition

D2.3 will describe the work performed during the Use Cases, requirements and KPIs definition stage. Related Task: T2.1.

SEE RES and storage grid planning dynamic map

D52 will show how the map for storage and RES installation in the region has been designed and the intelligence behind it Related Task T52

Plan for Exploitation and dissemination of results (PEDR) (v1)

Details the strategy and concrete actions for the exploitation and dissemination of the project results to audiences that may use those results. There will be a final version dealing with the exploitation agreements between partners and the modifications from the initial planning performed during TRINITY’s lifespan. Related tasks: T9.1, T9.5

Novel approach in reliability margin calculation

D4.1 will report the novel approach in reliability assessment directly embedded into the improved cross zonal capacity calculation concept. Related Task: T4.3.

End Users infrastructure and technology analysis

Analysis of the current and future infrastructure and other relevant technologies that the End Users will use for the project demonstration. Related Task: T2.2.

SEE regional coordination module for CC

This module will be the coordination tool to support exchange of information and coordination between SEE TSOs and SCC RCC for SEE regional market Capacity Calculation process Related Task T62

Communication and coordination between RES producers and SEE TSOs

This module will be the coordination tool to support exchange of information and coordination between SEE TSOs and RES producers for SEE region Related Task T63

Advanced concept for security and redispatching cooperation

D42 will provide the mechanism of close to real time regional security and redispatching cooperation as well as the method of power flow decomposition and TSOTSO Redispatch cost sharing Related Tasks T41 T42

Boundary conditions report

Report on the regulatory, social and market conditions of the TRINITY Region. Related Task: T2.4.

Dissemination, Communication and Cooperation activities Report (v2)

A report will be generated after each of the planned workshops dissemination and synergies activities containing the minutes report photo or video overview of the meeting presentation used participants list or number of people present and feedback from if appropriate the advisory board the user group people present Related tasks T91 T92 T93 T94

TRINITY monitoring, control and forecasting technology advancements

D51 will report the technical work of the Work Package in the field of monitoring control and forecast RES production and dispatchment Related Task T51

Project Management Plan (v2)

The reporting procedures, communication policies, IPR strategy and set of templates to be used within the project will be included in the project handbook. It will include a schedule per task, responsible partner related subtasks, related deliverables, and dependencies on other tasks. A detailed Quality Assurance Plan will be also included within this deliverable. Related tasks: T1.1, T1.2

Project Management Plan (v1)

The reporting procedures, communication policies, IPR strategy and set of templates to be used within the project will be included in the project handbook. It will include a schedule per task, responsible partner related subtasks, related deliverables, and dependencies on other tasks. A detailed Quality Assurance Plan will be also included within this deliverable. Related tasks: T1.1, T1.2

Guarantees of Origin and RES Ancillary Services technological modules for SEE markets

D53 will report the technical findings and modules developed for the integration of RES in different SEE markets with regards to GO issuing and ancillary services provision Related Task T53

IMC, OTCM and ASM design and development of business processes

D32 will provide the overall design of IMC and ASM market modules with the complete framework of entities and business processes behind them Related Tasks T32 to T34

SEE regional coordination module for CSA

This module will be the coordination tool to support exchange of information and coordination between SEE TSOs and SCC RCC for SEE regional Coordinated Security Analysis process Related Task T61

Project Management Plan (v3)

The reporting procedures communication policies IPR strategy and set of templates to be used within the project will be included in the project handbook It will include a schedule per task responsible partner related subtasks related deliverables and dependencies on other tasks A detailed Quality Assurance Plan will be also included within this deliverable Related tasks T11 T12

Data Management Plan

The Data Management Plan (DMP) clarifies the handling of research data during and after the project. It includes data that will be collected, processed or generated during the project, methodology and standards will be applied, whether data will be shared and how data will be curated and preserved, taking into account all data-related aspects of the project. Related tasks: T1.2

T-COORDINATION PLATFORM (v1)

D64 will deliver the TCOORDINATION PLATFORM with methodological and applicative documentation Related Task T64

T-COORDINATION PLATFORM (v2)

D65 will deliver the TCOORDINATION PLATFORM with methodological and applicative documentation Related Task T64

Searching for OpenAIRE data...

Publications

Unapređena metodologija za rešavanje kratkoročne neadekvatnosti / Improved methodology for solving short-term inadequacy

Author(s): Dušan Prešić, Andrijana Đalović, Dušan Vlaisavljević
Published in: 35 Session of CIGRE Serbia, 2021
Publisher: 35 Session of CIGRE Serbia
DOI: 10.5281/zenodo.5795347

Integration of New RES in Power System of North Macedonia

Author(s): Metodija Atanasovski, Mitko Kostov, Blagoja Arapinoski, Mile Spirovski
Published in: 2021 56th International Scientific Conference on Information, Communication and Energy Systems and Technologies (ICEST), Once in a year, 2021, Page(s) 181-184, ISBN 978-1-6654-2887-3
Publisher: IEEE
DOI: 10.1109/icest52640.2021.9483485

Implementation of K-Nearest Neighbour Regression for Forecasting Electricity Demand in Power System of Republic of North Macedonia

Author(s): Mitko Kostov, Metodija Atanasovski, Mile Spirovski
Published in: SDEWES -Sustainable Development of Energy Water and Environment Systems, Once in a year, 2020, ISSN 1847-7178
Publisher: https://www.cologne2020.sdewes.org/
DOI: 10.5281/zenodo.4563750

Reuse of Semantic Models for Emerging Smart Grids Applications

Author(s): Janev, Valentina; Popadić, Dušan; Pujić, Dea; Vidal, Maria Esther; Endris, Kemele
Published in: 1, 2021
Publisher: Information Society of Serbia - ISOS

K-Nearest Neighbor Regression for Forecasting Electricity Demand

Author(s): Metodija Atanasovski, Mitko Kostov, Blagoja Arapinoski, Mile Spirovski
Published in: 2020 55th International Scientific Conference on Information, Communication and Energy Systems and Technologies (ICEST), Once in a year, 2020, Page(s) 110-113, ISBN 978-1-7281-7143-2
Publisher: IEEE
DOI: 10.1109/icest49890.2020.9232768

Development of innovative probabilistic short-term regional adequacy assessment

Author(s): Rafael Peris, Manuel Serrano, Lucas Pons, Alvaro Nofuentes, Dusan Presic, Andrijana Dalovic, Nikolay Chavdarov, Stefan Sulakov
Published in: 2021 IEEE Madrid PowerTech, 2021, Page(s) 1-6, ISBN 978-1-6654-3597-0
Publisher: IEEE
DOI: 10.1109/powertech46648.2021.9495047

Application of Neural Networks for Short Term Load Forecasting in Power System of North Macedonia

Author(s): Goran Veljanovski, Metodija Atanasovski, Mitko Kostov, Pande Popovski
Published in: 2020 55th International Scientific Conference on Information, Communication and Energy Systems and Technologies (ICEST), Once in a year, 2020, Page(s) 99-101, ISBN 978-1-7281-7143-2
Publisher: IEEE
DOI: 10.1109/icest49890.2020.9232674

Power Load Forecast for North Macedonia Using Machine Learning

Author(s): Pande Popovski, Mitko Kostov, Metodija Atanasovski, Goran Veljanovski
Published in: 2020 55th International Scientific Conference on Information, Communication and Energy Systems and Technologies (ICEST), Once in a year, 2020, Page(s) 106-109, ISBN 978-1-7281-7143-2
Publisher: IEEE
DOI: 10.1109/icest49890.2020.9232837