Deliverables
As an outcome of Task 73 this DLV will be a report including the main conclusions reached by CIRCE when testing and validating the SW applications in a simulated environment
Benchmark analysis report of AMIs and other sensorsThis DLV is linked with Task 2.2. It will be a report including a benchmark analysis of AMIs and other sensors available in the grid.
Dissemination and Communication Plan, Mid ReportUpdate of DLV 8.3
Project visual identityThis DLV corresponds to Task 8.1. It will define the style guideline to be used in the material developed during the project, generating among others, the templates, working papers or the promotional materials
Description of existing and future issues affecting electricity grid managementThis DLV is an outcome of Task 2.1. It will be a report including the description of existing and future issues affecting electricity grid management, compiling the major barriers and drivers.
Report on the measurement campaign for the LV grid model validationThis DLV is an outcome of Task 72 It will consist on a report including a set of measurement campaigns to validate the LV grid models generated for each of the use cases and the conclusions reached regarding the grade of accuracy of the modelling tool
Results on the validation of INTERPETER tools in the real gridsReport resulted from the activities carried out during Task 75 where the results on the validation of INTERPRETER tools in the real grids will be presented
Methodology for impact assessment of INTERPETER toolsA report containing the evaluation of the impact indicators defined in Task 71 will be delivered here This report will also include targets and business interpretations associated to the project
Report on dissemination and Communication activities. First reportThis deliverable will include the list of performed activities related to WP8, assessing the impact and progress of each one of them.
Report on cooperation activities with other H2020 projectsThis deliverable is the outcome of Task 85 The main output of this document is to set the basis of the collaborations with the BRIDGE initiative and other relevant EU funded projects
Data Management Plan, First versionThis deliverable is related to Task 1.3. Data Management Plan will set the basis for the Dissemination and exploitation but also the procedures for the sharing of data of the project. This is the first version to be revised during the course of the project.
Dissemination and Communication Plan, Final ReportUpdate of DLV 84
Data Management Plan , Final VersionData Management Plan Final Version of the report
User manual and documentationThis DLV is an outcome of Task 65 It will be the INTERPRETER tool user manual and documentation report composed in a uniform document with software screenshots and examples This DLV will also include installation instructions software compatibility and interoperability features with other tools
Report on dissemination and Communication activities. Final reportUpdate of DLV 86
Software replicability tools and methodologyThis DLV is an outcome of Task 64 It will be a report including Software replicability tools and methodology
Data availability scenarios for grid modellingOutput of Task 3.1. Analysis of vailable information for the creation of general scenarios of data availability
Conclusions, lesson learnt and recommendations from validation phaseLinked with Task 75 this deliverable will collect a set of conclusions specific recommendations and an analysis of the replication potential of the INTERPRETER project
Results on the validation of INTERPETER tools in the living labsReport resulted from the activities carried out during Task 74 where the results on the validation of INTERPRETER tools in the living labs will be presented
Benchmark analysis report of tools and platforms for grid operatorsThis DLV is an outcome of Task 2.3. This DLV will be a report showing the differences between platforms and how the INTERPRETER tool shall interact with them in order for grid operators to have access to all the possibilities on the market.
Dissemination and Communication Plan, First DraftThis DLV corresponds to Task 8.2. This deliverable explains how the project will communicate its developments and outcomes, and how the consortium will ensure visibility of the project and dissemination of its results throughout its duration. The main outcomes will be a plan identifying a set of dissemination activities to be implemented and a general communication strategy to follow during the project lifetime.
Description of project data collaboration architecture and common information modelThis DLV will be a report obtained from the work developed during Task 61 It will consist on a description of project data collaboration architecture and common information model which will be part of the INTERPRETER project
This deliverable will contain the main features that the website of the INTERPRETER project will contain. Including the realese of the website itself.
Publications
Author(s):
Fotopoulou Maria; Rakopoulos Dimitrios; Petridis Stefanos
Published in:
ECOS 2022 35th International Conference on Efficiency, Cost, Optimization, Simulation and Environmental Impact of Energy Systems, Issue 1, 2022
Publisher:
ECOS
DOI:
10.5281/zenodo.7249154
Author(s):
Zhe Chen; Charalampos Ziras; Henrik W. Bindne
Published in:
2022 International Conference on Smart Energy Systems and Technologies (SEST), 2022
Publisher:
IEEE
DOI:
10.1109/sest53650.2022.9898410
Author(s):
Stefanos Petridis; Dimitrios Rakopoulos; Maria Fotopoulou
Published in:
2022 International Conference on Smart Energy Systems and Technologies (SEST), 2022
Publisher:
IEEE
DOI:
10.1109/sest53650.2022.9898403
Author(s):
Stefanos Petridis; Angelina D. Bintoudi; Angeliki Veliskaki; Vasileios Karapatsias; Maria Fotopoulou; Dimitrios Rakopoulos
Published in:
2022 International Conference on Smart Energy Systems and Technologies (SEST), 2022
Publisher:
IEEE
DOI:
10.1109/sest53650.2022.9898448
Author(s):
Zhe Chen, Charalampos Ziras, Henrik W. Bindner
Published in:
2021 IEEE PES Innovative Smart Grid Technologies Europe (ISGT Europe), 2021, ISBN 978-1-6654-4876-5
Publisher:
IEEE
DOI:
10.1109/isgteurope52324.2021.9640095
Author(s):
Nuno Amaro, Francisco Carrola, Francisco Reis
Published in:
2020 IEEE 14th International Conference on Compatibility, Power Electronics and Power Engineering (CPE-POWERENG), Issue Yearly, 2020, Page(s) 44-49, ISBN 978-1-7281-4218-0
Publisher:
IEEE
DOI:
10.1109/cpe-powereng48600.2020.9161484
Author(s):
Nils Müller, Samuel Chevalier, Carsten Heinrich; Kai Heussen, Charalampos Ziras
Published in:
Electric Power Systems Research, 2022
Publisher:
Department of Electrical Engineering, Technical University of Denmark
DOI:
10.1016/j.epsr.2022.108479
Author(s):
Nils Müller, Carsten Heinrich, Kai Heussen, Henrik W. Bindner
Published in:
Applied Energy, 2022
Publisher:
Center for Electric Power and Energy, Technical University of Denmark
DOI:
10.1016/j.apenergy.2022.118647
Author(s):
Stefanos Petridis, Orestis Blanas, Dimitrios Rakopoulos, Fotis Stergiopoulos, Nikos Nikolopoulos, Spyros Voutetakis
Published in:
Energies, Issue 14/4, 2021, Page(s) 897, ISSN 1996-1073
Publisher:
Multidisciplinary Digital Publishing Institute (MDPI)
DOI:
10.3390/en14040897
Searching for OpenAIRE data...
There was an error trying to search data from OpenAIRE
No results available