Periodic Reporting for period 1 - BRC (Brextor - The horizontal forces concrete pile removal head for high-precision piles preparation)
Reporting period: 2019-05-01 to 2019-08-31
The objectives of the Feasibility Study was to identify risks and contingency measures, further market research, and estimate accurate funding needs and financial projections emerged from a commercial strategy.
• We have analyse our logistical and operational capability) to scale up our production
• We have set up the basic guidelines for training regarding BREXTOR usage and service
• We have identified potential risks involved in launching BREXTOR and established contingency measures
• We have set up the guidelines for the IPR strategy.
• We have reassessed the regulatory requirements that BREXTOR will have to comply
• We have drafted a commercialization strategy
• We have determined and quantified the target market,
• We have refined our dissemination strategy with a set of pre-established activities.
• We have accurately assessed the financial requirements for BREXTOR project and the financial projections.
• Fine-tuned the Business plan (revenue model, pricing strategy, resources etc., including a Canvas)
• Improving the safety of the building structure in which BREXTOR will operate
• Improve construction worker´s health through avoidance of vibratory related diseases due to usage of manual hydraulic hammer equipment.
• Enhancing construction industry in Europe by increasing the demand of equipment and components to develop thousands of BREXTOR units assembled from European manufactured components (cutter, motors, etc.).
• As the process for head pile cutting shortens with our process, we expect to influence the environment as well due to a significant noise reduction emerged from shortening the pilling period.