Skip to main content

Non conductive mud imager

Objective

The overall objective of this project aims at reducing time and cost for exploration appraisal of hydrocarbon reservoirs by providing an accurate image of the borehole for wells drilled with non conductive mud (NCM). In particular, the challenge will be to provide the same image quality in NCM wells than what is recognized as the state of the art in water based mud wells today. Specifically, the project consortium sets out to study, engineer and demonstrate a prototype of a highly integrated imager for NCM wells.

Call for proposal

Second Call - 0
See other projects for this call

Coordinator

ETUDES ET PRODUCTION SCHLUMBERGER SA
Address
26, Rue De La Cavée
Clamart
France

Participants (3)

3D PLUS
France
Address
641,Rue Hélène Boucher-zi
Buc
NORSK HYDRO ASA
Norway
Address
Bygdoy Allé 2
Oslo
SINTEF ELECTRONICS AND CYBERNETICS
Norway
Address
Forskningsveien, 1
Oslo