innovative solutions for USER centric CHarging Infrastructure

CORDIS provides links to public deliverables and publications of HORIZON projects.

Links to deliverables and publications from FP7 projects, as well as links to some specific result types such as dataset and software, are dynamically retrieved from OpenAIRE .

Deliverables

Business model validation results (I) (opens in new window)

Report elaborated for the Business model analysis conducted in T86 Initial realease

Implementation roadmap (opens in new window)

Replicator cities will develop an implementation roadmap in order to start implementing/ deploying solutions with a specific replicability plan. Related task T8.2.

Technical and legal requirements for USER-CHI solutions (opens in new window)

Report on the technical and legal issues to take into account for the development and integration of USERCHI solutions and products Related tasks T13

Research participants involvement report (opens in new window)

This report describes the analysis and document templates developed for the participation of users in the research activities Related tasks T112

Report on the contribution to standardization (III) (opens in new window)

Report on the contribution to new standards developments in specific topics, related with the objectives, products and outcomes of the project. Final release. Related task T8.9.2.

Impact Assessment Report (opens in new window)

The deliverable will report on the overall impact of USER-CHI solutions comparing “as is/ex-ante” and “to be/ex-post” situation. Relevant guidelines to optimise the environmental performances of electromobility as well as its socio-economic impact will be included. Related task T7.3.

CLICK requirements and targets (opens in new window)

D21 will collect the findings of T21 and outline the requirements and general design decisions made based on those

Smart grid services implementation and lab-testing (opens in new window)

Demonstration and implementation of the smart grid integration software SMAC able to optimally manage the charging and discharging processes of the EVs while responding to the flexibility requests of the grid Report of the validation of the developed software guarantying all defined functional and technical requirements meet the real needs of the cities citizens and DSOs Related tasks T43 and T44

INFRA - Interoperability Framework implementation (opens in new window)

Demonstration and implementation of the USERCHI Interoperability Framework P4 Related task T32

Test result report (opens in new window)

Report of the result gathered by using CLICK in the pilot cities Feedback of users in the pilot sites A basic evaluation comparison of results among different cities Related task T24

EV batteries and charging solutions models (opens in new window)

Report of the definition of EV charging infrastructure models and flexibility characteristics and their capabilities to be integrated into the local smart grid Related task T41

INCAR - Interoperability, Charging and Parking Platform development and lab-testing (opens in new window)

Demonstration and implementation of the Interoperability and Roaming Platform P5 Report of the validation of the developed tools guarantying all defined functional and technical requirements and meet the real needs and constrains of endusers Related tasks T33 and T34

User requirements for USER-CHI solutions (opens in new window)

This report will collect the user requirements analysed through the Big Data analysis and the User Driven Innovation approach Related tasks T11

Project Management Plan (opens in new window)

Detailed Project Management Plan with a Gantt chart and a Work Breakdown Structure WBS It should include a schedule per task responsible partner related subtasks related deliverables and dependencies on other tasks

Local and cross-site evaluation - friendly user test and end user test (opens in new window)

Evaluation of results of the demo first test round (friendly user test), with feedback and emerging gaps for the evaluation of the second test round (end-user test). Final evaluation of each demo, which will allow the benchmark between proposed and observed values of cross-site impact and performance indicators. Related T7.2.

Ethics monitoring report (opens in new window)

This report describes the procedures to manage the ethical issues of the project including RRI strategies Related tasks T111

Report on the standardization landscape (opens in new window)

An initial analysis of the standardization landscape about existing standards that can be related as well as the related standardization committees and organizations involved Related task T891

Smart grid services design (opens in new window)

Report of the design of the modules functionalities and services of the SMAC Smart Charging Tool including data models data exchanges standards protocols algorithms and mockups of the tool Related task T42

Cross-site Evaluation Manual - preliminary (opens in new window)

The deliverable will include the preliminary definition of the evaluation methodology and plan with the set of KPIs measurement units activities to monitor and observation time measurement methodology Related T71

RDI projects and European initiatives cooperation activities (opens in new window)

Activities conducted for cooperating, clustering and liaising with relevant RDI projects and European initiatives. The deliverable will include feedback and contributions to the CIVITAS initiative related to regulatory framework, business models, data management and consumer engagement. Related tasks: T9.7.

Business model validation results (II) (opens in new window)

Report elaborated for the Business model analysis conducted in T86 Final realease

Demonstration Concept and Implementation Plan (opens in new window)

The deliverable will summarize the demos approach and focus for USERCHI demonstration and will specify the pilot demonstration with regard to needed charging infrastructure location technology and USERCHI software components as well as provided services platforms can be performed Thus D61 defines the technical concept and requirements for upcoming implementation activities in T62 Related Task T61 T62

Risk assessment report (I) (opens in new window)

This report documents the processes tools and procedures in order to manage and control the risks and events that could have a negative impact in the project Initial release Related tasks T101 T102

INDUCAR development and lab-testing (opens in new window)

Development and implementation of the system integrating it with the software developments of P5 Report of the validation of the developed system guarantying all defined functional and technical requirements meet the real needs and constrains of the end users Related Tasks T55 and T56

Communication and dissemination strategy (opens in new window)

Communication and dissemination strategy of the whole project It will also contain planned dissemination and communication activities and target groups at local level for each demo site Related task T91

Design and Specification of interoperability and roaming services (opens in new window)

Report of the definition of services and the specifications of both tools 1 INFRA Interoperability Framework P4 and 2 INCAR Interoperability Charging and Parking Platform P5 Related task T31

Implementation Report and Demonstration Outcome (opens in new window)

This deliverable will be worked out in co-operation with WP7 Cross-Pilot evaluation and impact assessment and outline the demonstration processes in all the demo sites. It will include results related to the set-up of the USER-CHI demonstrations, summarize demonstration preconditions as well as the experiences made during the demonstration. Related Task T6.3.

Risk assessment report (II) (opens in new window)

This report documents the processes, tools and procedures in order to manage and control the risks and events that could have a negative impact in the project. Final release. Related tasks: T10.1, T10.2.

Project handbook (opens in new window)

The reporting procedures communication policies risk table and set of templates to be used within the project will be included in the project handbook Related tasks T101 T102

INSOC system hardware development and lab-testing (opens in new window)

Development and implementation of INSOC integrating it with the software developments of P5 and P6 Report of the validation of the developed system guarantying all defined functional and technical requirements meet the real needs and constraints of the cities citizens and EMSPs Related Tasks T52 and T53

Report on the contribution to standardization (II) (opens in new window)

Report on the contribution to new standards developments in specific topics related with the objectives products and outcomes of the project Second release Related task T892

Policy and research recommendations (opens in new window)

Report collecting and describing policy and research recommendations for a massive deployment of electromobility. Related task T8.3.

Ethics Advisor report (opens in new window)

This deliverable will contain the assessment report drafted by the Ethics Advisor that has monitored and evaluated the ethical dimension and proposed actions of the project. Related to tasks T11.4.

Usage scenarios for validating low-medium and high range charging system (opens in new window)

This deliverable will describe the development and outcomes of the usage scenarios workshops organised Related tasks T12

INDUCAR system design (opens in new window)

Report of the design of services functionalities and specifications of the INDUCAR system Related Task T54

Protection of personal data report (opens in new window)

This report describes the actions conducted to protect the personal data collecting and processing processes from an ethical point of view It will also contain the templates and documents regarding personal data usage Relates tasks T113

Replication strategy (opens in new window)

The replication strategy sets the framework for all activities carried out within the project that aim to support the peertopeer exchange between cities with the aim prepare for the transfer and adoption of the emobility measures and strategies developed by the partner cities Apart from the replication activities and timeline it also describes the objectives processes methodologies and expected outputs and clearly distinguishes the roles and responsibilities for each of the project partners and cities involved Related task T82

Cross-site Evaluation Manual - final (opens in new window)

Final definition of the evaluation methodology and plan fully agreed with partners implementing demos and ready to be deployed in the demo execution Related T71

City baseline fingerprints (opens in new window)

Demonstrator cities will develop short city baseline fingerprints at the beginning of the project with the support of EUR so the replicator cities can select which solutions they will work on Related task T82

Report on the contribution to standardization (I) (opens in new window)

Report on the contribution to new standards developments in specific topics related with the objectives products and outcomes of the project Initial release Related task T892

INSOC system design (opens in new window)

Report of the design of services functionalities and specifications of the INSOC system Related Task T51

Visual identity toolkit and Communication material (opens in new window)

Project logo It will provide the project with a unique identity and will link it to H2020 It will be included in all documents and actions related to the project A graphic charter This will be prepared and offered to all project partners including font size visuals basic infographics Templates for print and digital communication Communication material including leaflets postcards 7 rollups and project website Related tasks T92 T93 and T94

Replication manual (opens in new window)

Digital manual that will provide an overview of the different technologies, strategies that have been tested by the demonstrator cities and offer technical and strategic guidelines on how to successfully transfer these solutions to other cities. Related task T8.4.

Media material and publications (opens in new window)

Media material and publications: Twitter capsules, Newsletters (3-4 mentions per year), 5 Podcasts, Publications/media (2 per year). Related task T9.4.

Videos (opens in new window)

Videos elaborated for each demonstration city replication city to show how the cities worked together Related task T94

Webinars (opens in new window)

Organisation of 15 Webinars during the project duration: 5 technical, 5 replication and 5 peer learning. Related task T8.1.

User Support Material (opens in new window)

Tutorial and webinar for CLICK usage targeting the user group of city administration employer charging infrastructure planner Related task T24

Peer learning visits and replication workshops (opens in new window)

Each demonstrator city will organize a peer learning visit in their own site in which they will invite the other demonstrator cities and the replicator cities for showcasing selected themes and site visits These visits will be complemented by two replication workshops to support the demonstrator and replicator cities to exchange on their experiences and define key enablers barriers solutions products issues and strategies for resolving those Related task T81

CLICK software prototype integration report and demonstrator (opens in new window)

D2.3 will contain the integration report of the software demonstrator of CLICK. It will cover deployment overviews as well as functional descriptions of the components developed and integrated. The result will be a usable website. Related T2.3.

Data Management plan (opens in new window)

This report describes the data management life cycle for the data to be collected, processed and/or generated by the project. Related tasks: T11.3.

Publications

USER-CHI: Enhancing electomobility by improving user experience of EVdrivers (opens in new window)

Author(s): Juan F. Giménez, Amparo López-Vicente, Carol Soriano, Raquel Marzo, José Solaz, Elisa Signes
Published in: FISITA, 2021
Publisher: FISITA
DOI: 10.46720/f2020-mcf-063

USER-CHI: Promoting electromobility byimproving the experience of ElectricVehicle drivers

Author(s): Juan F. Giménez Pla, Amparo López Vicente, Carol Soriano García, Raquel Marzo Roselló, José S.Solaz Sanahuja, Elisa Signes i Pérez, Antonio Marqués Moreno, María Tomás Pérez
Published in: Revista de BIOMECÁNICA. Innovación al cuidado de las personas, 2021, ISSN 1575-5622
Publisher: Revista de Biomecanica

Modelling charge profiles of electric vehicles based on charges data (opens in new window)

Author(s): Natascia Andrenacci, Federico Karagulian, Antonino Genovese
Published in: Open Research Europe, Issue 1, 2022, Page(s) 156, ISSN 2732-5121
Publisher: Open Research Europe
DOI: 10.12688/openreseurope.14354.1

Influence of Battery Aging on the Operation of a Charging Infrastructure (opens in new window)

Author(s): Natascia Andrenacci, Mauro Di Monaco, Giuseppe Tomasso
Published in: Energies 2022, 15(24), 9588, 2022, ISSN 1996-1073
Publisher: Multidisciplinary Digital Publishing Institute (MDPI)
DOI: 10.3390/en15249588

Interoperability Framework for Electromobility (INFRA): The main results from the USER-CHI-framework in a new spotlight (opens in new window)

Author(s): Katherina Csillak, Mariana Moreno Kuhnke
Published in: Transportation Research Procedia, Issue Volume 72, 2023, 2023, Page(s) Pages 1926-1933, ISSN 2352-1465
Publisher: Elsevier B.V.
DOI: 10.1016/j.trpro.2023.11.672

A charge management algorithm for an unscheduled EV load demand (opens in new window)

Author(s): Natascia Andrenacci, Antonino Genovese
Published in: Transportation Research Procedia, Issue 72, 2024, Page(s) 1800-1807, ISSN 2352-1465
Publisher: ELSEVIER
DOI: 10.1016/j.trpro.2023.11.656

Full accessibility and user-friendly smart mobility services across the European charging infrastructure (opens in new window)

Author(s): María Tomás, Antonio Marqués
Published in: Transportation Research Procedia, Issue Volume 72, 2023, 2023, Page(s) Pages 565-571, ISSN 2352-1465
Publisher: Elsevier B.V.
DOI: 10.1016/j.trpro.2023.11.440

An Interoperability Framework for electromobility (INFRA): The main results from the USER-CHI framework implementation in a new spotlight (opens in new window)

Author(s): Csillak, Katharina; Moreno Kuhnke, Mariana
Published in: Open Research Europe, 2022
Publisher: Open Research Europe
DOI: 10.12688/openreseurope.14510.1

Electric charging infrastructure and gender equality: An overview for USER-CHI (H2020 project) (opens in new window)

Author(s): Katharina Csillak, Sophie Kamenz
Published in: Open Research Europe, 2023, ISSN 2732-5121
Publisher: Directorate-General for DG RTD
DOI: 10.12688/openreseurope.15381.1