Livrables
Report elaborated for the Business model analysis conducted in T86 Initial realease
Implementation roadmapReplicator cities will develop an implementation roadmap in order to start implementing/ deploying solutions with a specific replicability plan. Related task T8.2.
Technical and legal requirements for USER-CHI solutionsReport on the technical and legal issues to take into account for the development and integration of USERCHI solutions and products Related tasks T13
Research participants involvement reportThis report describes the analysis and document templates developed for the participation of users in the research activities Related tasks T112
Report on the contribution to standardization (III)Report on the contribution to new standards developments in specific topics, related with the objectives, products and outcomes of the project. Final release. Related task T8.9.2.
Impact Assessment ReportThe deliverable will report on the overall impact of USER-CHI solutions comparing “as is/ex-ante” and “to be/ex-post” situation. Relevant guidelines to optimise the environmental performances of electromobility as well as its socio-economic impact will be included. Related task T7.3.
CLICK requirements and targetsD21 will collect the findings of T21 and outline the requirements and general design decisions made based on those
Smart grid services implementation and lab-testingDemonstration and implementation of the smart grid integration software SMAC able to optimally manage the charging and discharging processes of the EVs while responding to the flexibility requests of the grid Report of the validation of the developed software guarantying all defined functional and technical requirements meet the real needs of the cities citizens and DSOs Related tasks T43 and T44
INFRA - Interoperability Framework implementationDemonstration and implementation of the USERCHI Interoperability Framework P4 Related task T32
Test result reportReport of the result gathered by using CLICK in the pilot cities Feedback of users in the pilot sites A basic evaluation comparison of results among different cities Related task T24
EV batteries and charging solutions modelsReport of the definition of EV charging infrastructure models and flexibility characteristics and their capabilities to be integrated into the local smart grid Related task T41
INCAR - Interoperability, Charging and Parking Platform development and lab-testingDemonstration and implementation of the Interoperability and Roaming Platform P5 Report of the validation of the developed tools guarantying all defined functional and technical requirements and meet the real needs and constrains of endusers Related tasks T33 and T34
User requirements for USER-CHI solutionsThis report will collect the user requirements analysed through the Big Data analysis and the User Driven Innovation approach Related tasks T11
Project Management PlanDetailed Project Management Plan with a Gantt chart and a Work Breakdown Structure WBS It should include a schedule per task responsible partner related subtasks related deliverables and dependencies on other tasks
Local and cross-site evaluation - friendly user test and end user testEvaluation of results of the demo first test round (friendly user test), with feedback and emerging gaps for the evaluation of the second test round (end-user test). Final evaluation of each demo, which will allow the benchmark between proposed and observed values of cross-site impact and performance indicators. Related T7.2.
Ethics monitoring reportThis report describes the procedures to manage the ethical issues of the project including RRI strategies Related tasks T111
Report on the standardization landscapeAn initial analysis of the standardization landscape about existing standards that can be related as well as the related standardization committees and organizations involved Related task T891
Smart grid services designReport of the design of the modules functionalities and services of the SMAC Smart Charging Tool including data models data exchanges standards protocols algorithms and mockups of the tool Related task T42
Cross-site Evaluation Manual - preliminaryThe deliverable will include the preliminary definition of the evaluation methodology and plan with the set of KPIs measurement units activities to monitor and observation time measurement methodology Related T71
RDI projects and European initiatives cooperation activitiesActivities conducted for cooperating, clustering and liaising with relevant RDI projects and European initiatives. The deliverable will include feedback and contributions to the CIVITAS initiative related to regulatory framework, business models, data management and consumer engagement. Related tasks: T9.7.
Business model validation results (II)Report elaborated for the Business model analysis conducted in T86 Final realease
Demonstration Concept and Implementation PlanThe deliverable will summarize the demos approach and focus for USERCHI demonstration and will specify the pilot demonstration with regard to needed charging infrastructure location technology and USERCHI software components as well as provided services platforms can be performed Thus D61 defines the technical concept and requirements for upcoming implementation activities in T62 Related Task T61 T62
Risk assessment report (I)This report documents the processes tools and procedures in order to manage and control the risks and events that could have a negative impact in the project Initial release Related tasks T101 T102
INDUCAR development and lab-testingDevelopment and implementation of the system integrating it with the software developments of P5 Report of the validation of the developed system guarantying all defined functional and technical requirements meet the real needs and constrains of the end users Related Tasks T55 and T56
Communication and dissemination strategyCommunication and dissemination strategy of the whole project It will also contain planned dissemination and communication activities and target groups at local level for each demo site Related task T91
Design and Specification of interoperability and roaming servicesReport of the definition of services and the specifications of both tools 1 INFRA Interoperability Framework P4 and 2 INCAR Interoperability Charging and Parking Platform P5 Related task T31
Implementation Report and Demonstration OutcomeThis deliverable will be worked out in co-operation with WP7 Cross-Pilot evaluation and impact assessment and outline the demonstration processes in all the demo sites. It will include results related to the set-up of the USER-CHI demonstrations, summarize demonstration preconditions as well as the experiences made during the demonstration. Related Task T6.3.
Risk assessment report (II)This report documents the processes, tools and procedures in order to manage and control the risks and events that could have a negative impact in the project. Final release. Related tasks: T10.1, T10.2.
Project handbookThe reporting procedures communication policies risk table and set of templates to be used within the project will be included in the project handbook Related tasks T101 T102
INSOC system hardware development and lab-testingDevelopment and implementation of INSOC integrating it with the software developments of P5 and P6 Report of the validation of the developed system guarantying all defined functional and technical requirements meet the real needs and constraints of the cities citizens and EMSPs Related Tasks T52 and T53
Report on the contribution to standardization (II)Report on the contribution to new standards developments in specific topics related with the objectives products and outcomes of the project Second release Related task T892
Policy and research recommendationsReport collecting and describing policy and research recommendations for a massive deployment of electromobility. Related task T8.3.
Ethics Advisor reportThis deliverable will contain the assessment report drafted by the Ethics Advisor that has monitored and evaluated the ethical dimension and proposed actions of the project. Related to tasks T11.4.
Usage scenarios for validating low-medium and high range charging systemThis deliverable will describe the development and outcomes of the usage scenarios workshops organised Related tasks T12
INDUCAR system designReport of the design of services functionalities and specifications of the INDUCAR system Related Task T54
Protection of personal data reportThis report describes the actions conducted to protect the personal data collecting and processing processes from an ethical point of view It will also contain the templates and documents regarding personal data usage Relates tasks T113
Replication strategyThe replication strategy sets the framework for all activities carried out within the project that aim to support the peertopeer exchange between cities with the aim prepare for the transfer and adoption of the emobility measures and strategies developed by the partner cities Apart from the replication activities and timeline it also describes the objectives processes methodologies and expected outputs and clearly distinguishes the roles and responsibilities for each of the project partners and cities involved Related task T82
Cross-site Evaluation Manual - finalFinal definition of the evaluation methodology and plan fully agreed with partners implementing demos and ready to be deployed in the demo execution Related T71
City baseline fingerprintsDemonstrator cities will develop short city baseline fingerprints at the beginning of the project with the support of EUR so the replicator cities can select which solutions they will work on Related task T82
Report on the contribution to standardization (I)Report on the contribution to new standards developments in specific topics related with the objectives products and outcomes of the project Initial release Related task T892
INSOC system designReport of the design of services functionalities and specifications of the INSOC system Related Task T51
Project logo It will provide the project with a unique identity and will link it to H2020 It will be included in all documents and actions related to the project A graphic charter This will be prepared and offered to all project partners including font size visuals basic infographics Templates for print and digital communication Communication material including leaflets postcards 7 rollups and project website Related tasks T92 T93 and T94
Replication manualDigital manual that will provide an overview of the different technologies, strategies that have been tested by the demonstrator cities and offer technical and strategic guidelines on how to successfully transfer these solutions to other cities. Related task T8.4.
Media material and publicationsMedia material and publications: Twitter capsules, Newsletters (3-4 mentions per year), 5 Podcasts, Publications/media (2 per year). Related task T9.4.
VideosVideos elaborated for each demonstration city replication city to show how the cities worked together Related task T94
WebinarsOrganisation of 15 Webinars during the project duration: 5 technical, 5 replication and 5 peer learning. Related task T8.1.
User Support MaterialTutorial and webinar for CLICK usage targeting the user group of city administration employer charging infrastructure planner Related task T24
Peer learning visits and replication workshopsEach demonstrator city will organize a peer learning visit in their own site in which they will invite the other demonstrator cities and the replicator cities for showcasing selected themes and site visits These visits will be complemented by two replication workshops to support the demonstrator and replicator cities to exchange on their experiences and define key enablers barriers solutions products issues and strategies for resolving those Related task T81
D2.3 will contain the integration report of the software demonstrator of CLICK. It will cover deployment overviews as well as functional descriptions of the components developed and integrated. The result will be a usable website. Related T2.3.
This report describes the data management life cycle for the data to be collected, processed and/or generated by the project. Related tasks: T11.3.
Publications
Auteurs:
Juan F. Giménez, Amparo López-Vicente, Carol Soriano, Raquel Marzo, José Solaz, Elisa Signes
Publié dans:
FISITA, 2021
Éditeur:
FISITA
DOI:
10.46720/f2020-mcf-063
Auteurs:
Csillak, Katharina; Moreno Kuhnke, Mariana
Publié dans:
Open Research Europe, 2022
Éditeur:
Open Research Europe
DOI:
10.12688/openreseurope.14510.1
Auteurs:
Katharina Csillak, Sophie Kamenz
Publié dans:
Open Research Europe, 2023, ISSN 2732-5121
Éditeur:
Directorate-General for DG RTD
DOI:
10.12688/openreseurope.15381.1
Auteurs:
Natascia Andrenacci, Federico Karagulian, Antonino Genovese
Publié dans:
Open Research Europe, Numéro 1, 2022, Page(s) 156, ISSN 2732-5121
Éditeur:
Open Research Europe
DOI:
10.12688/openreseurope.14354.1
Auteurs:
Natascia Andrenacci, Mauro Di Monaco, Giuseppe Tomasso
Publié dans:
Energies 2022, 15(24), 9588, 2022, ISSN 1996-1073
Éditeur:
Multidisciplinary Digital Publishing Institute (MDPI)
DOI:
10.3390/en15249588
Auteurs:
Katherina Csillak, Mariana Moreno Kuhnke
Publié dans:
Transportation Research Procedia, Numéro Volume 72, 2023, 2023, Page(s) Pages 1926-1933, ISSN 2352-1465
Éditeur:
Elsevier B.V.
DOI:
10.1016/j.trpro.2023.11.672
Auteurs:
Natascia Andrenacci, Antonino Genovese
Publié dans:
Transportation Research Procedia, Numéro 72, 2024, Page(s) 1800-1807, ISSN 2352-1465
Éditeur:
ELSEVIER
DOI:
10.1016/j.trpro.2023.11.656
Auteurs:
María Tomás, Antonio Marqués
Publié dans:
Transportation Research Procedia, Numéro Volume 72, 2023, 2023, Page(s) Pages 565-571, ISSN 2352-1465
Éditeur:
Elsevier B.V.
DOI:
10.1016/j.trpro.2023.11.440
Recherche de données OpenAIRE...
Une erreur s’est produite lors de la recherche de données OpenAIRE
Aucun résultat disponible