European Commission logo
English English
CORDIS - EU research results
CORDIS

Data-based analysis for SAFETY and security protection FOR detection, prevention, mitigation and response in trans-modal metro and RAILway networkS

Deliverables

Resilience assessment model of optimised investment

Report on resilience assessment model of optimised investment

Final version of development of a blueprint exercise handbook

Development of a blueprint exercise handbook based on the enduser requirements which includes the different scenarios The 1st draft of the handbook will be provided before the first simulation exercise M16 which will be completed before the second one and will be the final submission M20 This deliverable is part of task 82

Mid-term validation and evaluation of the S4RIS system

MidReport on validation and evaluation of the S4RIS system

Report on a multilingual risk assessment tool

The deliverable will report the tool development in accordance with the parallel tasks which must provide input to design the tools architecture The report will be composed comprehensively to assure that the nonprogramming experts will find the coherence between the developed methodology and the tool architecture

Market analysis and Business Plan

Report on the market analysis and Business Plan

Innovative mitigation actions for metro and railway systems

Report on innovative mitigation actions for metro and railway systems

Resilience strategies for multi-modal metro and railway systems

Report on resilience strategies for multimodal metro and railway systems

A specific crisis management tool

The report describes how the Crisis Management tool coordinates response and recovery to railway infrastructure incidents

Framework and Methodology of critical components based on OSINT

This report describes the framework and methodology identifying classifying and sharing business and operation critical components based on OSINT

Final developmental validation and evaluation of the S4RIS system

Final report on validation and evaluation of the S4RIS system

Second update of the dissemination and communication plan

Final report on the Dissemination and Communication activities of the project including the activities of both years Liaison and Stakeholder Engagement activities will also be reported in this deliverableThis deliverable is part of task 102

Exploitation Strategy

This document will report the actions for the joint exploitation of the project results as well as the individual exploitation plans that will maximize the project impact

Budget simulation module of S4RIS

Webbased software tool as a budget simulation module of S4RIS

Cyber-physical threat detection with capabilities matrix intelligence

Report on inventory of cyberphysical threat detection monitoring methods tools with capabilities matrix intelligence This report is part of Task 42

Final update of the data management plan

This report on the data management plan contains guidelines and standards how to use the data in SAFETY4RAILS This report will be updated after the half duration of the project M12 and at the end of the project M24This deliverable is the first version of the data management plan and part of task 94

Optimised budget for a given level of resilience planning

Report on optimised budget for a given level of resilience planning

Report on past failure anaylsis and lessons learnt

This report will present an inventory of past accidents or attacks with a comprehensive analysis of how the project could help to prevent or mitigate vulnerabilities and by which requirements

Investment assessment model for cost-benefit evaluation of risk mitigation and recovery.

Report on investment assessment model for costbenefit evaluation of risk mitigation and recovery

Project brochures - second update

The project brochures contain information on the actual status and aims of the project to be published among potential external practitioners and endusers The project brochures will be updated in M12 after half of the project duration and at the end of the project in M24The project brochures are part of task 103

First update of the dissemination and communication plan

First update of the Dissemination and Communication Plan and report on the respective activities during the first year of the project Liaison and Stakeholder Engagement activities will also be reported in this deliverable

Dissemination and Communication Plan

Obligatory deliverable outlining all relevant dissemination and communication activities with KPIs and success criteria along with common project presentation materials for both public dissemination posters brochures etc and common templates for project deliverable presentations etcThis document will be split in three parts1 Dissemination and communication plan M32 First update of the dissemination and communication plan M123 Second update of the dissemination and communication plan M24This deliverable is the first part and part of task 101

Data management plan

This report on the data management plan contains guidelines and standards how to use the data in SAFETY4RAILS This report will be updated after the half duration of the project M12 and at the end of the project M24This deliverable is the first version of the data management plan and part of task 94

Operational interoperability of S4RIS and logistics

Report on operational interoperability of S4RIS and logistics

Final version of evaluation report

Evaluation Report Generate for each scenario an evaluationvalidation report incl lessons learnt which concentrate on optimization potentials and technical aspects of the S4RIS but also on identified potentials to improve the Business Continuity Management and especially the Crisis Management for the railway companies The first draft of the evaluation report will be provided after the first simulation exercise M16 the final report in M22 These deliverables are part of task 83

Evaluation Methodology

Evaluation Methodology Development of an evaluation report that dictates how the scenarios and simulation exercises will be evaluated and their results analysed ensuring the quality and consistency of the analysis and evaluation

Project Brochures - First version

The project brochures contain information on the actual status and aims of the project to be published among potential external practitioners and endusers The project brochures will be updated in M12 after half of the project duration and at the end of the project in M24The project brochures are part of task 103

First version - development of a blueprint exercise handbook

Development of a blueprint exercise handbook based on the enduser requirements which includes the different scenarios The 1st draft of the handbook will be provided before the first simulation exercise

Legal Framework for Certification and Standardization

Report on the Legal Framework for Certification and Standardization This deliverable is part of task 93

First version of evaluation report

Evaluation Report Generate for each scenario an evaluationvalidation report incl lessons learnt which concentrate on optimization potentials and technical aspects of the S4RIS but also on identified potentials to improve the Business Continuity Management and especially the Crisis Management for the railway companies The first draft of the evaluation report will be provided after the first simulation exercise M16 the final report in M22 These deliverables are part of task 83

System's specifications and concept architecture

This report will provide the overall system architecture and system specifications resulting from D21 and D22 describing the complete set of modules and interfaces with internal and external systems D23 will serve as a reference document for all technical developments in the project and for validating achievement of technical objectives by subsequent WPs prior to release of relevant technologies for trials with end users

Guidelines for Ethically Sustainable Crisis Communications and Information Sharing

Report on guidelines for Ethically Sustainable Crisis Communications and Information Sharing This delivearble is part of task 92

Manual for crisis management and coordination of response teams

Manual for crisis management and coordination of response teams in case of cyberphysical attacks on railway infrastructure and services

SAFETY4RAILS Ethical Compliance Framework (ECF)

The document will also include Societal Impact Assessments which will be conducted twice during the project The deliverable will be developed in 2 versions 1 In the initial stage of the project the CF will focus on ensuring the integration of ethics into the execution of the project starting from the enduser engagement to development and validation of the SAFETY4RAILS solution initial desk study and 2 an update of the guidelines concerning both the SAFETY4RAILS solution its use and scalability will be provided based on feedback and observations from trials and inputs from the EAB These guidelines are then to be taken into account in each WP and their deliverables including the verification of the actions in conformance with the guidelines during the trialsThis deliverable is the first part and part of task 91

Specific requirements for standardisation and interoperability

This deliverable will report the set of standardization requirements for S4RIS and the set of interoperability requirements being a reference for the technical developments in the project and for the definition of the future certification scheme Furthermore GUI requirementsguidelines will be included as well

Lessons learnt from SAFETY4RAILS for future research projects

Report on the guidelines of the lessons learnt from SAFETY4RAILS for future research projects This deliverable is part of task 84

First update of the data management plan

This report on the data management plan contains guidelines and standards how to use the data in SAFETY4RAILS This report will be updated after the half duration of the project M12 and at the end of the project M24This deliverable is the first version of the data management plan and part of task 94

Update of SAFETY4RAILS Ethical Compliance Framework (ECF)

The document will also include Societal Impact Assessments which will be conducted twice during the project The deliverable will be developed in 2 versions 1 In the initial stage of the project the CF will focus on ensuring the integration of ethics into the execution of the project starting from the enduser engagement to development and validation of the SAFETY4RAILS solution initial desk study and 2 an update of the guidelines concerning both the SAFETY4RAILS solution its use and scalability will be provided based on feedback and observations from trials and inputs from the EAB These guidelines are then to be taken into account in each WP and their deliverables including the verification of the actions in conformance with the guidelines during the trialsThis deliverable is the update and part of task 91

Definition of the interface between RA tool and S4RIS

This document will describe how the RA tool will communicate with the other components of S4RIS in order to ensure a seamless exchange of data

Project brochures - first update.

The project brochures contain information on the actual status and aims of the project to be published among potential external practitioners and endusers The project brochures will be updated in M12 after half of the project duration and at the end of the project in M24The project brochures are part of task 103

Citizen's engagement concept

Report on the citizens engagement concept in SAFETY4RAILSThis deliverable is part of task 103

Publications

Impact assessment and mitigation strategies in rail/metro infrastructure with the use of iCrowd simulator

Author(s): Stelios C. A. Thomopoulos, Christos Kyriakopoulos, Konstantinos Panou
Published in: SPIE Defense + Commercial Sensing, 2022,, 2022
Publisher: SPIE
DOI: 10.1117/12.2630074

Modelling and Simulation of Railway Networks for Resilience Analysis

Author(s): Kushal Srivastava, Corinna Köpke, Katja Faist, Johannes Walter, John Marschalk Berry, Claudio Porretti, Alexander Stolz
Published in: The 3rd International Workshop on Cyber-Physical Security for Critical Infrastructures Protection (CPS4CIP 2022), 2022
Publisher: Srivastava (to date)

NARRATION: a platform for curation and scenario creation with application to vulnerability and risk assessment

Author(s): Stelios C. A. Thomopoulos
Published in: SPIE Defense + Commercial Sensing, 2022, 2022
Publisher: SPIE
DOI: 10.1117/12.2624640

Methodology for resilience assessment for rail infrastructure considering cyber-physical threats

Author(s): Corinna Köpke, Johannes Walter, Eros Cazzato, Catalin Linguraru, Uli Siebold and Alexander Stolz
Published in: The 3rd International Workshop on Cyber-Physical Security for Critical Infrastructures Protection (CPS4CIP 2022), 2022, Page(s) 16
Publisher: Corinna Köpke

Data-based analysis for SAFETY and security protection, FOR detection, prevention, mitigation and response in trans-modal metro and RAILway networkS

Author(s): Artur Krukowski
Published in: Στοχευμένες Δράσεις για την Αύξηση της Προστασίας των Εθνικά Χαρακτηρισμένων Ευρωπαϊκών Υποδομών Ζωτικής Σημασίας– ΕΥ.Ζ.Σ. 2021, 2021
Publisher: KEMEA

Hurdles, challenges, and opportunities of IoT moving towards 6G

Author(s): Valerio Frascolla, Rute Sofia, Jürgen Neises, Venkatesha Prasad, Konstantinos Loupos, Gabriel Pestana, Artur Krukowski,
Published in: IEEE 7th World Forum on Internet of Things, 2021
Publisher: IEEE

"''Protecting railway and metro infrastructure against combined cyber-physical attacks"""

Author(s): Marie-Hélène BONNEAU, Laura PETERSEN, Grigore HAVARNEANU, Stephen Crabbe
Published in: World Congress on Railway Research, WCRR 2022, 2022
Publisher: Bonneau (to date)

iCrowd simulation-as-a service (SaaS): a distributed and remotely accessible simulation platform

Author(s): Stelios C. A. Thomopoulos, Christos Kyriakopoulos
Published in: SPIE Defense + Commercial Sensing, 2022, 2022
Publisher: SPIE
DOI: 10.1117/12.2624766

Anomaly detection with noisy and missing data using a deep learning architecture

Author(s): Stelios C. A. Thomopoulos, Christos Kyriakopoulos
Published in: SPIE Defense + Commercial Sensing, 2021, 2021
Publisher: SPIE
DOI: 10.1117/12.2589981

Resilience Management Concept for Railways and Metro CyberPhysical Systems

Author(s): Jyri Rajamäki
Published in: Proceeding of the 20th European Conference on Cyber Warfare and Security ECCWS 2021, Issue Yearly, 2021, Page(s) 337-345
Publisher: Academic Conferences International

SAFETY4RAILS Information System platform demonstration at Madrid Metrosimulation exercise

Author(s): Stephen Crabbe, Eduardo Villamor Medina, Katharina Roß, Corinna Köpke, Katja Faist, Uli Siebold, Eros Cazzato, Anett Mádi-Nátor, Eli Ben-Yizhak, Ido Peled, Alper Kanak, Niyazi Ugur, S. Halit Ergun, Salih Ergun, Marco Tiemann, Marie-Hélène Bonneau, Kaci Bourdache, Jari Savolainen, Stelios C. A. Thomopoulos, Christos Kyriakopoulos, Konstantinos Panou, Antonio De Santiago Laporte Emmanuel Matsi
Published in: Proceedings of the 32nd European Security and Reliability Conference (ESREL 2022), 2022, Page(s) 2151-2158, ISBN 978-981-18-5183-4
Publisher: Research Publishing
DOI: 10.3850/978-981-18-5183-4_s06-14-470-cd

A Risk and Resilience Assessment Approach for Railway Networks

Author(s): Natalie Miller, Yupak Satsrisakul, Katja Faist, Mirjam Fehling-Kaschek, Stephen Crabbe, Mauro Poliotti, Nader Naderpajouh, Sujeeva Setunge, Salih Ergün, Alper Kanak, Sercan Tanrıseven, Alexios Lekidis, Emmanuel Matsika, Philipp Sick, Eros Cazzato
Published in: Proceedings of the 31st European Safety and Reliability Conference (ESREL 2021), Issue Yearly, 2021, Page(s) 2071-2078, ISBN 978-981-18-2016-8
Publisher: Research Publishing Services
DOI: 10.3850/978-981-18-2016-8_402-cd

Modelling Cyber-Risk in an Economic Perspective

Author(s): Ioannis Bothos, Vasileios Vlachos, Dimitris M. Kyriazanos, Ioannis Stamatiou, Konstantinos Georgios Thanos, Pantelis Tzamalis, Sotirios Nikoletseas, Stelios C.A. Thomopoulos
Published in: 2021 IEEE International Conference on Cyber Security and Resilience (CSR), Issue Yearly, 2021, Page(s) 372-377, ISBN 978-1-6654-0285-9
Publisher: IEEE
DOI: 10.1109/csr51186.2021.9527994

3D modeling, simulation and data exchange in cyber-physical threat assessment, multi-biometrics performance evaluation, and risk-based access control

Author(s): Stelios C. A. Thomopoulos, Christos Kyriakopoulos, Konstantinos Panou
Published in: SPIE Defense + Commercial Sensing, 2022, 2022
Publisher: SPIE
DOI: 10.1117/12.2630233

Searching for OpenAIRE data...

There was an error trying to search data from OpenAIRE

No results available