Skip to main content
Go to the home page of the European Commission (opens in new window)
English English
CORDIS - EU research results
CORDIS

Smart European Energy Performance AssessmeNt And CErtificAtion

CORDIS provides links to public deliverables and publications of HORIZON projects.

Links to deliverables and publications from FP7 projects, as well as links to some specific result types such as dataset and software, are dynamically retrieved from OpenAIRE .

Deliverables

Promotional video (opens in new window)

D79 Promotional video M14 Task 73 SYMPRAXIS

Video tutorial about assessment method 3 (opens in new window)

D4.10. Video tutorial about assessment method 3 (M31), Task 4.3, EFINOVATIC

Video tutorial about assessment method 2 (opens in new window)

D4.6. Video tutorial about assessment method 2 (M28), Task 4.2, EFINOVATIC

Project website, incl. exclusive area for TDB and REBs (opens in new window)

D73 Project website incl exclusive area for TDB and REBs M3 Task 72 SYMPRAXIS

Video tutorial about assessment method 1 (opens in new window)

D4.3. Video tutorial about assessment method 1 (M25), Task 4.1, VITO

Report on the evaluation of ePANACEA energy assessment and certification methodology (opens in new window)

D5.4 Report on the evaluation of ePANACEA energy assessment and certification methodology (M40). Task 5.3, CRES

2nd REBs conclusions report (opens in new window)

D6.2. 2nd REBs conclusions report. This report will include results and conclusions of the REBs meetings supported by survey campaigns. The minutes of the REBs meetings will be included in the annexes. (M20), Task 6.1, EASt

Report on the use of innovative certification schemes and its implementation (opens in new window)

D21 Report on the use of innovative certification schemes and its implementation M6 Task 21 CENER

Report on the selection of advanced occupant models (opens in new window)

D48 Report on the selection of advanced occupant models and impact analysis 18 Task 43 CENER

Guideline of psychological aspects regarding the EPC usage (opens in new window)

D3.6. Guideline of psychological aspects regarding the EPC usage (display of multi-user perspectives, recommendations for tailored communication measures) (M37), Task 3.5, IZES

Pathways of EPC related policy framework (opens in new window)

D6.5. Pathways of EPC related policy framework. This (short) report will describe possible pathways of future policies related to the uptake of innovative EPC methods, in particular related to ePANACEA. These pathways will be discussed in pilot countries with national policy makers and the REB meetings. (M28), Task 6.2, TU WIEN

Project communication plan (opens in new window)

D71 Project communication plan draft M2 final M6 Task 71 SYMPRAXIS

Impact assessment from final user perspective regarding the new EPC (opens in new window)

D3.5. Report on the outcome of the final acceptance test and impact assessment from user perspective regarding the new EPC (M36), Task 3.4, IZES

Report on the use of (cost-optimal) renovation business plans within EPC schemes (opens in new window)

D26 Report on the use of costoptimal renovation business plans within EPC schemes M12 Task 26 CENER

Demonstration activities Plans of each pilot country (opens in new window)

D5.2 Demonstration activities Plans of each pilot country (M20), SubTask 5.2.1 and 5.2.2, EASt.Testing and demonstration activities Plans of each pilot countries, including descriptions of selected case studies, activity schedules, milestones and expected outcomes.

Description of current EPC related policy framework in implementing countries (opens in new window)

D64 Description of current EPC related policy framework in implementing countries and on a lower level of detail for countries involved in the exploitation boards M12 Task 62 TU WIEN

News Alerts (opens in new window)

D78 News Alerts M6 onwards Task 72 SYMPRAXIS

Working paper presenting the potential impact of innovative EPC methods on energy savings, related investments etc (opens in new window)

D6.6. Working paper presenting the potential impact of innovative EPC methods on energy savings, related investments, etc (M39), Task 6.3, TU WIEN

Internal test and feedback of new EPC acceptance across the five pilot countries (opens in new window)

D3.4. Report on the outcome of the first acceptance test of new EPC across the five pilot countries (M20), Task 3.4, IZES

Professional social networks accounts (opens in new window)

D76 Professional social networks accounts M4 Task 72 SYMPRAXIS

Project Management Plan - PMP (opens in new window)

Project Management Plan M3 Task 11 CENER

1st REBs conclusions report (opens in new window)

D61 1st REBs conclusions report This report will include results and conclusions of the REBs meetings supported by survey campaigns The minutes of the REBs meetings will be included in the annexes M6 Task 61 EASt

Innovation Management Plan (opens in new window)

D15 Innovation Management Plan Task 16 CENER

Report on the selection of the open-source simulation tool (opens in new window)

D47 Report on the selection of the opensource simulation tool and its compliance with ISO 52000 series M12 Task 43 CENER

Reports on case studies validation results of each pilot country (opens in new window)

D5.3 Reports on case studies validation results of each pilot country (M38), SubTask 5.2.3, EASt.

Report on the use of (energy) data within EPC schemes (opens in new window)

D24 Report on the use of energy data within EPC schemes M12 Task 24 VITO

Project flyer, poster and roll-up (opens in new window)

D75 Project flyer poster and rollup M7 Task 71 SYMPRAXIS

Stakeholder map (opens in new window)

D31 Stakeholder map structure and connections of EPC user groups importance of EPC connection of EPC and energy transition M4 Task 31 IZES

Digital gateways posts (opens in new window)

D77 Digital gateways posts M3 onwards Task 72 SYMPRAXIS

Guidelines on how national EPC schemes and SRI could be linked (opens in new window)

D23 Guidelines on how national EPC schemes and SRI could be linked M12 Task 23 VITO

Report on the current status of national plans, schemes and initiatives on building renovation passports (opens in new window)

D2.5. Report on the current status of national plans, schemes and initiatives on building renovation passports (M12, M35), Task 2.5, CRES

3rd REBs conclusions report (opens in new window)

D6.3 3rd REBs conclusions report. This report will include results and conclusions of the REBs meetings supported by survey campaigns. The minutes of the REBs meetings will be included in the annexes. (M37), Task 6.1, EASt

Research Data Management Plan (opens in new window)

Research Data Management Plan M6 Task 15 CENER

Compendium of TDB meetings (opens in new window)

D5.1 Compendium of TDB meetings (M1). This document will be updated in M10, M19, M28 and M36. Task 5.1, EASt

Fact sheet on energy related behaviour patterns in the context of buildings (opens in new window)

D33 Fact sheet on energy related behaviour patterns in the context of buildings M14 Task 33 IZES

Criteria-set for an adequate EPC (opens in new window)

D32 Criteriaset for an adequate EPC differentiated by stakeholder groups recommendations for EPC authorities for future tools and informational offers M9 Task 32 IZES

Inventory of smart and novel technologies, including short description and prioritisation (opens in new window)

D22 Inventory of smart and novel technologies including short description and prioritisation M6 Task 22 VITO

Standardized computer file format suggestion for information exchange (opens in new window)

D44 Standardized computer file format suggestion for information exchange focused on meteorological servers and utility companies across Europe M12 Task 42 EFINOVATIC

Publications

Energy performance certificates under discussion (opens in new window)

Author(s): Inés Díaz Regodón, CENER Laura Muhr, IZES
Published in: ISViS 2023, 2023
Publisher: Zenodo
DOI: 10.5281/zenodo.10441773

Next generation energy performance assessment methods for EPCs using measured energy data (opens in new window)

Author(s): Jan Verheyen, Unit Smart Energy and Built Environment | VITO | EnergyVille | Thor Park | Belgium Evi Lambie, Unit Smart Energy and Built Environment | VITO | EnergyVille | Thor Park | Belgium María Fernández Boneta, Energy in Buildings Department | National Renewable Energy Centre | Spain Iná Maia, Technische Universität Wien | Austria Lukas Kranzl, Technische Universität Wien | Austria There
Published in: CLIMA 2022, 2022
Publisher: REHVA
DOI: 10.34641/clima.2022.260

ePANACEA - Smart European Performance Assessment & Certification (opens in new window)

Author(s): María Fernández Boneta, CENER Marta Sampedro Bores, CENER
Published in: 11 Conference EU research and innovation (Spain), 2022
Publisher: CDTI and Ministry of Science and Innovation of Spain
DOI: 10.5281/zenodo.10441722

Nueva generación de certificación energética de edificios basada en datos reales (opens in new window)

Author(s): María Fernández Boneta
Published in: iENER 2022, 2022
Publisher: Zenodo
DOI: 10.5281/zenodo.10441812

A Comprehensive Framework for Data-Driven Building End-Use Assessment Utilizing Monitored Operational Parameters (opens in new window)

Author(s): Mohsen Sharifi, Amin Kouti, Evi Lambie, Yixiao Ma, Maria Fernandez Boneta and Mohammad Haris Shamsi
Published in: energies, 2023, ISSN 1996-1073
Publisher: Multidisciplinary Digital Publishing Institute (MDPI)
DOI: 10.3390/en16207132

Searching for OpenAIRE data...

There was an error trying to search data from OpenAIRE

No results available

My booklet 0 0