European Commission logo
español español
CORDIS - Resultados de investigaciones de la UE
CORDIS

Smart European Energy Performance AssessmeNt And CErtificAtion

Resultado final

Promotional video

D79 Promotional video M14 Task 73 SYMPRAXIS

Video tutorial about assessment method 3

D4.10. Video tutorial about assessment method 3 (M31), Task 4.3, EFINOVATIC

Video tutorial about assessment method 2

D4.6. Video tutorial about assessment method 2 (M28), Task 4.2, EFINOVATIC

Project website, incl. exclusive area for TDB and REBs

D73 Project website incl exclusive area for TDB and REBs M3 Task 72 SYMPRAXIS

Video tutorial about assessment method 1

D4.3. Video tutorial about assessment method 1 (M25), Task 4.1, VITO

Report on the evaluation of ePANACEA energy assessment and certification methodology

D5.4 Report on the evaluation of ePANACEA energy assessment and certification methodology (M40). Task 5.3, CRES

2nd REBs conclusions report

D6.2. 2nd REBs conclusions report. This report will include results and conclusions of the REBs meetings supported by survey campaigns. The minutes of the REBs meetings will be included in the annexes. (M20), Task 6.1, EASt

Report on the use of innovative certification schemes and its implementation

D21 Report on the use of innovative certification schemes and its implementation M6 Task 21 CENER

Report on the selection of advanced occupant models

D48 Report on the selection of advanced occupant models and impact analysis 18 Task 43 CENER

Guideline of psychological aspects regarding the EPC usage

D3.6. Guideline of psychological aspects regarding the EPC usage (display of multi-user perspectives, recommendations for tailored communication measures) (M37), Task 3.5, IZES

Pathways of EPC related policy framework

D6.5. Pathways of EPC related policy framework. This (short) report will describe possible pathways of future policies related to the uptake of innovative EPC methods, in particular related to ePANACEA. These pathways will be discussed in pilot countries with national policy makers and the REB meetings. (M28), Task 6.2, TU WIEN

Project communication plan

D71 Project communication plan draft M2 final M6 Task 71 SYMPRAXIS

Impact assessment from final user perspective regarding the new EPC

D3.5. Report on the outcome of the final acceptance test and impact assessment from user perspective regarding the new EPC (M36), Task 3.4, IZES

Report on the use of (cost-optimal) renovation business plans within EPC schemes

D26 Report on the use of costoptimal renovation business plans within EPC schemes M12 Task 26 CENER

Demonstration activities Plans of each pilot country

D5.2 Demonstration activities Plans of each pilot country (M20), SubTask 5.2.1 and 5.2.2, EASt.Testing and demonstration activities Plans of each pilot countries, including descriptions of selected case studies, activity schedules, milestones and expected outcomes.

Description of current EPC related policy framework in implementing countries

D64 Description of current EPC related policy framework in implementing countries and on a lower level of detail for countries involved in the exploitation boards M12 Task 62 TU WIEN

News Alerts

D78 News Alerts M6 onwards Task 72 SYMPRAXIS

Working paper presenting the potential impact of innovative EPC methods on energy savings, related investments etc

D6.6. Working paper presenting the potential impact of innovative EPC methods on energy savings, related investments, etc (M39), Task 6.3, TU WIEN

Internal test and feedback of new EPC acceptance across the five pilot countries

D3.4. Report on the outcome of the first acceptance test of new EPC across the five pilot countries (M20), Task 3.4, IZES

Professional social networks accounts

D76 Professional social networks accounts M4 Task 72 SYMPRAXIS

Project Management Plan - PMP

Project Management Plan M3 Task 11 CENER

1st REBs conclusions report

D61 1st REBs conclusions report This report will include results and conclusions of the REBs meetings supported by survey campaigns The minutes of the REBs meetings will be included in the annexes M6 Task 61 EASt

Innovation Management Plan

D15 Innovation Management Plan Task 16 CENER

Report on the selection of the open-source simulation tool

D47 Report on the selection of the opensource simulation tool and its compliance with ISO 52000 series M12 Task 43 CENER

Reports on case studies validation results of each pilot country

D5.3 Reports on case studies validation results of each pilot country (M38), SubTask 5.2.3, EASt.

Report on the use of (energy) data within EPC schemes

D24 Report on the use of energy data within EPC schemes M12 Task 24 VITO

Project flyer, poster and roll-up

D75 Project flyer poster and rollup M7 Task 71 SYMPRAXIS

Stakeholder map

D31 Stakeholder map structure and connections of EPC user groups importance of EPC connection of EPC and energy transition M4 Task 31 IZES

Digital gateways posts

D77 Digital gateways posts M3 onwards Task 72 SYMPRAXIS

Guidelines on how national EPC schemes and SRI could be linked

D23 Guidelines on how national EPC schemes and SRI could be linked M12 Task 23 VITO

Report on the current status of national plans, schemes and initiatives on building renovation passports

D2.5. Report on the current status of national plans, schemes and initiatives on building renovation passports (M12, M35), Task 2.5, CRES

3rd REBs conclusions report

D6.3 3rd REBs conclusions report. This report will include results and conclusions of the REBs meetings supported by survey campaigns. The minutes of the REBs meetings will be included in the annexes. (M37), Task 6.1, EASt

Research Data Management Plan

Research Data Management Plan M6 Task 15 CENER

Compendium of TDB meetings

D5.1 Compendium of TDB meetings (M1). This document will be updated in M10, M19, M28 and M36. Task 5.1, EASt

Fact sheet on energy related behaviour patterns in the context of buildings

D33 Fact sheet on energy related behaviour patterns in the context of buildings M14 Task 33 IZES

Criteria-set for an adequate EPC

D32 Criteriaset for an adequate EPC differentiated by stakeholder groups recommendations for EPC authorities for future tools and informational offers M9 Task 32 IZES

Inventory of smart and novel technologies, including short description and prioritisation

D22 Inventory of smart and novel technologies including short description and prioritisation M6 Task 22 VITO

Standardized computer file format suggestion for information exchange

D44 Standardized computer file format suggestion for information exchange focused on meteorological servers and utility companies across Europe M12 Task 42 EFINOVATIC

Publicaciones

Energy performance certificates under discussion

Autores: Inés Díaz Regodón, CENER Laura Muhr, IZES
Publicado en: ISViS 2023, 2023
Editor: Zenodo
DOI: 10.5281/zenodo.10441773

Next generation energy performance assessment methods for EPCs using measured energy data

Autores: Jan Verheyen, Unit Smart Energy and Built Environment | VITO | EnergyVille | Thor Park | Belgium Evi Lambie, Unit Smart Energy and Built Environment | VITO | EnergyVille | Thor Park | Belgium María Fernández Boneta, Energy in Buildings Department | National Renewable Energy Centre | Spain Iná Maia, Technische Universität Wien | Austria Lukas Kranzl, Technische Universität Wien | Austria There
Publicado en: CLIMA 2022, 2022
Editor: REHVA
DOI: 10.34641/clima.2022.260

ePANACEA - Smart European Performance Assessment & Certification

Autores: María Fernández Boneta, CENER Marta Sampedro Bores, CENER
Publicado en: 11 Conference EU research and innovation (Spain), 2022
Editor: CDTI and Ministry of Science and Innovation of Spain
DOI: 10.5281/zenodo.10441722

Nueva generación de certificación energética de edificios basada en datos reales

Autores: María Fernández Boneta
Publicado en: iENER 2022, 2022
Editor: Zenodo
DOI: 10.5281/zenodo.10441812

A Comprehensive Framework for Data-Driven Building End-Use Assessment Utilizing Monitored Operational Parameters

Autores: Mohsen Sharifi, Amin Kouti, Evi Lambie, Yixiao Ma, Maria Fernandez Boneta and Mohammad Haris Shamsi
Publicado en: energies, 2023, ISSN 1996-1073
Editor: Multidisciplinary Digital Publishing Institute (MDPI)
DOI: 10.3390/en16207132

Buscando datos de OpenAIRE...

Se ha producido un error en la búsqueda de datos de OpenAIRE

No hay resultados disponibles