Livrables
The report contains Dissemination and Communication Plan DCP and Data Management Plan DMP The report is a result of Task 61 during time period M1M6 Language English Update in M24 and M36
RESHeat replication and exploitation guidelinesThe report presents a guidelines for further RESHeat system replication in ZBK and ATER managed buildings The report is a result of Task 64 Language English Update in M16 M32 and M48 final version
Impact monitoring reportThe report monitors the defined KPIs a Heating and cooling building demand coverage at least at a level of 70 100 is a project target value b Yearly averaged heat pump COP which should be equal to at least 4 for demosites in Poland and 5 for demosite in Italy c Yearly averaged PVT panels electrical efficiency equal to at least 18 due to application of efficient cooling system for PV panels d Increase of TRL level from 7 to 8 e Number of agreements with EndUsers signed by RESHeat consortium equal to at least 2 Language English Update M32 M48
Report from dissemination and communication activitiesThe report presents all dissemination and communication activities performed during the project The report is a result of Task 62 Language English Update in M32 and M48 final version
Publications
Auteurs:
Filip Bartyzel, Tomasz Wegiel, Magdalena Kozień-Woźniak and Marek Czamara
Publié dans:
Energies, Numéro Energies 2022, 15(1), 383, 2022, ISSN 1996-1073
Éditeur:
Multidisciplinary Digital Publishing Institute (MDPI)
DOI:
10.3390/en15010383
Auteurs:
Sheng Zhang, PawełOcłoń, Jiří Jaromír Klemeš, Piotr Michorczyk, Kinga Pielichowska, Krzysztof Pielichowski
Publié dans:
Renewable and Sustainable Energy Reviews, Numéro Volume 165, September 2022, 2022, Page(s) 112560, ISSN 1364-0321
Éditeur:
Elsevier BV
DOI:
10.1016/j.rser.2022.112560
Recherche de données OpenAIRE...
Une erreur s’est produite lors de la recherche de données OpenAIRE
Aucun résultat disponible