Skip to main content
Ir a la página de inicio de la Comisión Europea (se abrirá en una nueva ventana)
español español
CORDIS - Resultados de investigaciones de la UE
CORDIS

CREATing cOmmunity eneRgy Systems

CORDIS proporciona enlaces a los documentos públicos y las publicaciones de los proyectos de los programas marco HORIZONTE.

Los enlaces a los documentos y las publicaciones de los proyectos del Séptimo Programa Marco, así como los enlaces a algunos tipos de resultados específicos, como conjuntos de datos y «software», se obtienen dinámicamente de OpenAIRE .

Resultado final

Final data requirements template (se abrirá en una nueva ventana)

This deliverable will outline the full CES data model including:- standardised data needs for each of the CES life-cycle phase (assessment, design, implementation, operation) and owner profiles (residential, industrial, commercial, public)- standardised data collection procedures - harmonised and consistent data specifications and protocols (granularity, frequency, format, etc.) This deliverable is the main outcome of task 5.1 “Development of a simplified data model for CES set up”.

Report on the obstacles for innovation in CREATORS sites in using trading platform (se abrirá en una nueva ventana)

This deliverable aims to present the challenges encountered in the implementation of the CREATORS management and trading platform in CREATORS pilots, focusing on both the control and optimisation of the system as well as the establishment and operation of the multi-vectors marketplace.This report is part of task 6.4 “Implementation and operation of CES supported by CREATORS services”.

Beta data requirements template (se abrirá en una nueva ventana)

This document will outline the standardised procedures and necessary data inputs for the implementation of the CES services This deliverable is part of task 51 Development of a simplified data model for CES set up

Report on the updated energy market platform implementation at CREATORS sites (se abrirá en una nueva ventana)

The deliverable will present the results from the validation of the final energy management and trading platform in the CREATORS CES and follower sites. This deliverable will present the results of task 3.3 “Extension of trading software facilitating community energy markets”.

Business models benchmarking report from tier 1, tier 2 (se abrirá en una nueva ventana)

In this deliverable, JSI will present the results from the evaluation of the CREATORS tier 1 and tier 2 business models. This will include the assessment and benchmark of CES economic performance and viability. Recommendations for further improvements and best practices will be also provided.This report is part of task 6.6 “Benchmarking CES business models and monitoring the technical performance of CREATORS”.

CESs set up process framework template (se abrirá en una nueva ventana)

Building upon best practices from CREATORS CES implementation plans, this document will outline a step-by-step decision-making process for community energy initiators covering the entire CES life-cycle.This deliverable is the result of task 5.2 “Standardisation of the process lifecycle of CES”.

Lessons learned for CES site coordinator and managers for quality control (se abrirá en una nueva ventana)

This deliverable is result of Task 1.2. This deliverable will summarize the best practices and common problems that the CREATORS site owners encountered in setting up community energy systems using the CREATORS approach.

Synergy options with other decarbonisation approach (se abrirá en una nueva ventana)

This deliverable is result of Task 7.5. The deliverables will describe CREATORS approach integration and interoperability options with “other” decarbonisation approaches.

Report on regulatory and policy obstacles for innovation in CREATORS countries (se abrirá en una nueva ventana)

The deliverable is a result of task 7.4. The deliverable will present an analysis that will cover different rules and policies affecting CES set up from tariff schemes to subsidies to grid ownership rules in Europe.

Report on the fit of CREATORS approach in 10 European community replication sites (se abrirá en una nueva ventana)

This report will present the results of the feasibility scans carried out for 10 community energy systems within the CREATORS market-entry programme. This deliverable is part of task 5.6 “CREATORS market-entry programme”.

Report on the control and management platform implementation at CREATORS sites (se abrirá en una nueva ventana)

The deliverable will present the results from the validation of the control and management platform in the CREATORS CES and follower sites. This report is part of task 3.2 “Advancement and extension of the control and management software components of the CREATORS platform”.

Simple suite of templates for CESs structuring (se abrirá en una nueva ventana)

This deliverable will provide the summarised version of the CES models for the open public. This deliverable is part of task 4.3 “Community Energy System contract models and templates”.

Social acceptability report of the CREATORS approach from tier 1, tier 2 and tier 3 sites (se abrirá en una nueva ventana)

In this report, TREA will present the results from the evaluation of the CREATORS tier 1 and tier 2 sites’ social acceptability and performance. This will include the assessment of community benefits, user engagement and buy-in, preferences and social challenges. Recommendations for further improvements and best practices will be also provided. This report is part of task 6.6 “Benchmarking CES business models and monitoring the technical performance of CREATORS”.

Report illustrating the updated emulation tool working, digital twins validated and prototype emulators and interface boxes built and working (se abrirá en una nueva ventana)

The report will describe the main advancements of the emulation toolset and how these have been achieved in particular new components for rapid development of digital twins the updated emulation platform digital twins of CREATORS CES digital twinmicrogrid modelling library of easily customizable and parametrizable components This deliverable is part of task 25 Advancing the emulation toolset

information on cumulative expenditure incurred (se abrirá en una nueva ventana)

Because the last reporting period will be longer than 18 months, the project needs to add a deliverable for information on cumulative expenditure incurred.

Green Paper for community energy system investment protocols (se abrirá en una nueva ventana)

Based on desk research and experts interviews the report will present the current trends and challenges in energy community financing and provide an outlook for the outline of financing protocols and new financing solutions This deliverable is the main outcome of task 41 State of the art of CES financing models

Report on community engagement best practices, governing business models and contractual relationship (se abrirá en una nueva ventana)

As an outcome of task 62 Community engagement business models and ecosystem analysis in CREATORS CES this deliverable will collect best practices of community engagement and present the stakeholders ecosystem the governance and business model of each of the CREATORS tier 1 CES

Report from 2nd MRG meeting with CREATORS (se abrirá en una nueva ventana)

This deliverable is result of task 7.3. The deliverable itself is report from the content discussion at the MRG meeting taking place in M36.

Report from 1st MRG meeting with CREATORS (se abrirá en una nueva ventana)

This deliverable is result of task 73 The deliverable itself is report from the content discussion at the MRG meeting taking place in M18

Report on validation and accuracy of plugins for renewable energy potential assessment in LECs: hydro, solar and wind (se abrirá en una nueva ventana)

This report will present the validation process and accuracy of the plugins data points and prediction algorithms This deliverable is part of task 22 Plugins for the assessment of renewable energy potential

CREATORS integrated CES-as-a-service value proposition (se abrirá en una nueva ventana)

This report will outline the strategy for the exploitation of the CREATORS solutions as a service package (CES-as-a-service), presenting obstacles and opportunities to commercialisation, potential value propositions and revenue structures. This deliverable is part of task 5.5 “Integration of the CES-as-service package and business planning”.

CREATORS visual identity (logo, etc.), communication material and social media (se abrirá en una nueva ventana)

The deliverable is linked to task 71 and task 72 and will report on the communication strategy and the resulting branding that was created or will be created in terms of visual identity logo templates video and all types of communication materials the launch of the website and social media channels The deliverable is connected to the D72

CREATORS CESs assessment online interface (se abrirá en una nueva ventana)

This deliverable will describe the process for the development of the CES assessment interface as well as its key features and functionalities (data inputs, technical and economic calculations, outputs, etc.).This deliverable is part of task 5.3 “User-interface for preliminary assessment of CES potential”.

Online beta version of industry standard assessment protocol for community energy systems investments (se abrirá en una nueva ventana)

This document will represent the CES standard investment protocol developed in collaboration with the ICP and the investors/developers working groups. This deliverable is part of task 4.2 “Develop an industry standard assessment protocol for community energy system investments”.

Online financing scanning app for CESs, investors and financiers (se abrirá en una nueva ventana)

This deliverable will describe the main outcome of task 4.4 “Unlock financing, and integrating finance app for CESs”, in particular: the eligibility assessment criteria, input data, financing instruments and conditions included in the financing scanning app service.

Publicaciones

CREATORS: Open Call for Community Energy Systems Projects

Autores: Blanca Barrios
Publicado en: 2022
Editor: BRIDGE NEWSROOM

BTC contributes to the establishment of advanced energy communities

Autores: BTC Tomaž Damjan
Publicado en: 2022
Editor: STAkrog

Built up energy community in Jesenice

Autores: Mojca Loncnar, Tom Smolej
Publicado en: 2022
Editor: Acroni24 (SIJ Acroni internal newspaper)

HIL-powered digital twins advance European smartgrid research

Autores: TH
Publicado en: 2022
Editor: Typhoon HIL Newsletter

Community Energy: the local solution to rising energy costs?

Autores: Maarja Meitern
Publicado en: 2022
Editor: Medium

Mayor Račič: Jesenice hasn't fully recovered yet from the armor of the iron-making past

Autores: Jana Petkovšek Štakul
Publicado en: 2022
Editor: BUSINESS NEWSPAPER FINANCE, newspaper publishing, d.o.o

El Port de Barcelona se moverá con energía verde gracias a las comunidades energéticas

Autores: Port de Barcelona
Publicado en: 2022
Editor: La Vanguardia

As a test area, BTC City Ljubljana in the CREATORS project contributes to the establishment of advanced energy communities

Autores: BTC
Publicado en: 2022
Editor: OSTA

"BTC s sodelovanjem v projektu Phoenix cilja na večjo kibernetsko varnost elektroenergetskega omrežja (With the participation in the Phoenix project, BTC aims to increase the cyber security of its electricity network)"""

Autores: Peter Palčec
Publicado en: 2021
Editor: Montel Energetika.NET d.o.o.

Načrti SIJ Acronija: velika sončna elektrarna, izraba odvečne toplote in vodikarna / Plans of SIJ Acroni: large solar power plant, use of excess heat and hydrogen production

Autores: Borut Hočevar (journalist)
Publicado en: 2020
Editor: BUSINESS NEWSPAPER FINANCE, newspaper publishing, d.o.o.

Energy Communities

Autores: Cordeel Bulgaria
Publicado en: 2024
Editor: Cordeel Bulgaria Website

Sij Acroni na Jesenicah za razvoj napredne energetske skupnosti / SIJ Acroni for the development of an advanced energy community at Jesenice

Autores: SIJ ACRONI
Publicado en: 2020
Editor: STA, Slovenian News Agency

Energy Communities: Engaging engaging people and technologies in the future of energy

Autores: Blanca Barrios, Tatiana Loureiro
Publicado en: Open Research Europe, 2022
Editor: Sustainable Places

On the way to the energy community of the green future

Autores: Mojca Loncnar, Tom Smolej, Boris Sučić
Publicado en: 2021
Editor: Magazine SIJ No.5

Comunitats energètiques per accelerar la descarbonització

Autores: Port de Barcelona
Publicado en: 2022
Editor: El Punt Avui+

A draft of a new local energy concept was prepared in Jesenice

Autores: SIJ ACRONI
Publicado en: 2022
Editor: RTV SLO

We bring technology closer to people and we establish new development milestones

Autores: Janez Povše
Publicado en: 2022
Editor: BTC- internal company's magazine

"CREATORS leads “Community Energy Systems from the full value chain perspective"" workshop at Sustainable Places 2021"

Autores: Blanca Barrios
Publicado en: 2021
Editor: BRIDGE NEWSLETTER

BTC city Ljubljana as a Creators pilote site

Autores: Andrej Janko
Publicado en: 2022
Editor: BTC WEBSITE

Zamisel o veliki energetski skupnosti: pametno mesto Jesenice / The idea of a local energy community: the smart city of Jesenice

Autores: Borut Hočevar (journalist)
Publicado en: 2020
Editor: BUSINESS NEWSPAPER FINANCE, newspaper publishing, d.o.o.

Electric energy utilization in modern industrial environments

Autores: Ivan Todorović, Ivana Isakov, Goran Dobrić, Mileta Žarković
Publicado en: Open Research Europe, 2022
Editor: Open Research Europe

LOCAL ENERGY COMMUNITIES AS AN INSTRUMENT TO ACHIEVE NATIONAL ENERGY AND CLIMATE GOALS AT COMPANY AND LOCAL LEVEL

Autores: Edvard Košnjek, Boris Sučić, Jože Knez, Marjan Levstek
Publicado en: CIGRE-CIRED, 2023
Editor: 16th Conference of Slovenian Electric Power Engineers CIGRE-CIRED

A Characterization of European Collective Action Initiatives and Their Role as Enablers of Citizens’ Participation in the Energy Transition

Autores: Veronica Lupi, Chiara Candelise, Merce Almuni Calull…..Nele Ivask…..Tessa Dunlop
Publicado en: Energies Journal, 2021
Editor: MDPI

Transformation of national energy and climate goals into real-life implementation programme at the company level : case study Slovenia

Autores: Boris SUČIĆ, Edvard KOŠNJEK, Matevž PUŠNIK, Jože KNEZ
Publicado en: 2022, Página(s) 220-225, ISBN 978-3-900932-87-9
Editor: International Conference on Sustainable Energy & Environmental Protection (14 ; 2022 ; London)

Challenges of integrating solar photovoltaic plants into urban environments : energy communities as a platform for connecting and self-supplying multi-apartment buildings

Autores: Boris SUČIĆ, Edvard KOŠNJEK, Marko BEVC, Mihael BERLIČ
Publicado en: 2023
Editor: 18th SDEWES Conference on Sustainable Development of Energy, Water and Environment Systems

Energy communities as an instrument for a fair transition and development of sustainable infrastructure - a new approach to identifying the potentials of res in connection with the actual energy consumption

Autores: KOŠNJEK, Edvard, SUČIĆ, Boris, KOVAČ, Marko, MERŠE, Stane
Publicado en: 2021
Editor: Slovenian Committee of Electric Power Engineers CIGRE-CIRED

Advances in Distributed Generation Source Digital Twins Design (se abrirá en una nueva ventana)

Autores: Ivan Todorović 1, Ivana Isakov, Boris Sučić, Dušan Čohadžić and Aleksandar Kavgić
Publicado en: Environmental Sciences Proceedings, 2021
Editor: MDPI
DOI: 10.3390/environsciproc2021011002

Energy communities as a platform for achieving goals of sustainable development and connecting the energy-intensive industry, energy networks and local inhabitants

Autores: SUČIĆ, Boris, KOŠNJEK, Edvard, PUŠNIK, Matevž, ČIŽMAN, Jure, MERŠE, Stane, CIMERMAN, Franc, MUNIH, Anton, STUŠEK, Andrej, VUK, Tomaž
Publicado en: 2021
Editor: Slovenian Committee of Electric Power Engineers CIGRE-CIRED

Advances and Prospects in Distributed Generation Sources Digital Twins Design (se abrirá en una nueva ventana)

Autores: Ivan Todorović, Ivana Isakov
Publicado en: Smart Grids Technology and Applications, 2023
Editor: IntechOpen
DOI: 10.5772/intechopen.102703

Decentralized self-stabilizing primary control of microgrids (se abrirá en una nueva ventana)

Autores: Ivana Isakov, Marko Vekić, Milan Rapaić, Ivan Todorović, Stevan Grabić
Publicado en: International Journal of Electrical Power & Energy Systems, Edición 155, 2023, Página(s) 109477, ISSN 0142-0615
Editor: Elsevier BV
DOI: 10.1016/j.ijepes.2023.109477

An energy community as a platform for local sector coupling: From complex modelling to simulation and implementation (se abrirá en una nueva ventana)

Autores: Edvard Košnjek, Boris Sučić, Dušan Kostić, Tom Smolej
Publicado en: Energy, Edición 286, 2024, Página(s) 129478, ISSN 0360-5442
Editor: Pergamon Press Ltd.
DOI: 10.1016/j.energy.2023.129478

Buscando datos de OpenAIRE...

Se ha producido un error en la búsqueda de datos de OpenAIRE

No hay resultados disponibles

Mi folleto 0 0