Deliverables
The report will describe the developed configuration management processes and illustrate it using the demonstration projects
This report will describe the business and decisionmaking processes to support lean project planning control and risk management with digital twin data
This report will describe the ontologies that will form the basis for the ASHVIN digital twin platform
his report will describe the formalisms developed in the project to simulate construction progress using stochastic digital twin data The report will provide a detailed description of the mapped construction processes explain the method to gain stochastic productivity data and illustrate the working of the simulation method by describing the application of the tool on several selected demonstration projects
This deliverable presents the extract transform and load processes to enable information exchange It will be provided in the form of an IDM Information Delivery Manuals for the identified ETL processes and will describe the reference pivot model to share data and the operable Connectors associated APIs and linked data principles concerning the utilised ASHVIN tools
This deliverable presents a report of the preparation elaboration execution and evaluation of all demonstration cases providing a replicable description of the implementation of the digital twin technologies on the demonstration cases and the impact of the implementations The deliverable will also provide the above shown schema for each of the demonstration projects
The document will report all the algorithms that will be deployed for extracting features of the constructions and comprise the base data for the higher level of implementations
This deliverable will describe the developed KPIs to design for productivity resource efficiency and safety together with guidelines for their applications The report will also describe the exemplary implementation of the KPIs on a few selected demonstration projects
The deliverable will report the identified privacy and security requirements of the industry and will describe how these requirements have been detailed for implementation into the ASHVIN platform
This document will report on the results of Tasks 32 and 34 describing the required data fusion mechanism to combine different collected data and suggests digital twin pipelines for updating digital twin models and ensuring possibilities to compare and match asdesigned with asbuilt data
This document outlines the overall project dissemination communication and exploitation strategies providing a specific action overview for the contribution to standardisation initiatives
The deliverable will provide a detailed summary of knowledgebased system as well as machine learning attempts successful and unsuccessful and develop a balanced discussion of the possibilities for evidencebased design with recommendation for databases for the longterm storage of past digital twin data
The document will report concepts for advanced sensor based geomonitoring concepts for establishing accurate digital twin models of soil ground conditions and foundation structures
This deliverable will describe the developed KPIs to plan and control productive resource efficient and safe construction sites together with guidelines for their applications The report will also describe the exemplary implementation of the KPIs on a few selected demonstration projects
Midterm documentation of the actions taken and outcomes achieved in relation to the promotional strategies during the first period of the project having D41 as the baseline This will include the assessment of the Agile Stakeholder Management strategy
This deliverable presents a report of the needs for structural control on buildings initial imperfections deflections at service stability rheology and on bridges vibrations modal shapes deflections stresses based on stateoftheart imagebased and sensorbased techniques
Midterm documentation of the actions taken and outcomes achieved in relation to the promotional strategies during the first period of the project having D41 as the baseline This will include the assessment of the Agile Stakeholder Management strategy
We will review present standards existing and under development relevant for Digital Building Twins to identify gaps and impact on ASHVIN project results
This deliverable is the IoT platform that will provide the core of the ASHVIN digital twin platform itself which will be available from the start of the project This deliverable includes the description of the launch version of the IoT platform the user manuals and practical recommendations for implementation The launch version of the IoT platform includes the required IoT main data management and securityprivacy functionalities to allow demonstration projects to start data collection early on
Searching for OpenAIRE data...
Publications
Author(s): Chacon, R.; Posada, H.; Ramonell, C.; Sierra, P.; Rodriguez Gonzalez, A.; Koulalis, I.; Ioannidis, K.; Vrochidis, S.; Tomar, R.; Freitag, S.; Wagmeister, S.; Teodorovic, M.
Published in: International Conference on Bridge Maintenance, Safety and Management, 2022, 2022
Publisher: CRC Press
DOI: 10.1201/9781003322641-98
Author(s): Timo Hartmann
Published in: Kongress Zukunft Bau Wien, 2021, 2021
Publisher: Technische Universität Wien
Author(s): Alejandro Rodríguez, J. Fuente, R. Fabregad, R. Chacón, C. Ramonell
Published in: International Conference on Bridge Maintenance, Safety and Management, 2022, 2022, ISBN 9781003322641
Publisher: CRC Press
DOI: 10.1201/9781003322641-271
Author(s): Rolando Chacón,Burkhard Krenn,Càrol Puig-Polo
Published in: International Colloquium on Stability and Ductility of Steel Structures 2022, 2022, 2022
Publisher: Wiley
DOI: 10.1002/cepa.1851
Author(s): Khan, Rehan; Tomar, Rahul; Hartmann, Timo; Ungureanu, Lucian; Chacón Flores, Rolando Antonio; Ibrahim, Ahmed
Published in: 29th Workshop on Intelligent Computing in Engineering, 2022, 2022
Publisher: European Group for Intelligent Computing
DOI: 10.7146/aul.455.c219
Author(s): Posada Cárcamo, Héctor José;
Chacón Flores, Rolando Antonio;
Ungureanu, Lucian;
Garcia Carrera, David
Published in: 39th International Symposium on Automation and Robotics in Construction (ISARC 2022), 2022, 2022
Publisher: International Association on Automation and Robotics in Construction
Author(s): Rolando Chacón,Carlos Ramonell,Càrol Puig-Polo,Enrique Mirambell
Published in: International Colloquium on Stability and Ductility of Steel Structures 2022, Volume5, Issue4, 2022, Page(s) 52-58
Publisher: Wiley
DOI: 10.1002/cepa.1727
Author(s): Ramonell Cazador, Carlos;
Chacón Flores, Rolando Antonio
Published in: 39th International Symposium on Automation and Robotics in Construction (ISARC 2022), 2022, 2022, Page(s) 231-237, ISBN 978-952-69524-2-0
Publisher: International Association on Automation and Robotics in Construction
Author(s): Carlos Ramonell; Rolando Chacón
Published in: Computer Applications in Engineering Education, Volume30, Issue4, 2022, Page(s) 1009-1021, ISSN 1099-0542
Publisher: Wiley
DOI: 10.1002/cae.22499