Deliverables Documents, reports (18) Virtual Commissioning Model The report will describe the developed configuration management processes and illustrate it using the demonstration projects Digital twin supported lean project planning, control, and risk management This report will describe the business and decisionmaking processes to support lean project planning control and risk management with digital twin data An ontology for digital twin models for the construction industry This report will describe the ontologies that will form the basis for the ASHVIN digital twin platform Discrete event simulation formalism for productive, resource efficient, and safe construction planning his report will describe the formalisms developed in the project to simulate construction progress using stochastic digital twin data The report will provide a detailed description of the mapped construction processes explain the method to gain stochastic productivity data and illustrate the working of the simulation method by describing the application of the tool on several selected demonstration projects Digital Twin Interoperability in the construction industry This deliverable presents the extract transform and load processes to enable information exchange It will be provided in the form of an IDM Information Delivery Manuals for the identified ETL processes and will describe the reference pivot model to share data and the operable Connectors associated APIs and linked data principles concerning the utilised ASHVIN tools ASHVIN technology demonstration plan This deliverable presents a report of the preparation elaboration execution and evaluation of all demonstration cases providing a replicable description of the implementation of the digital twin technologies on the demonstration cases and the impact of the implementations The deliverable will also provide the above shown schema for each of the demonstration projects Visual analysis for real sensing The document will report all the algorithms that will be deployed for extracting features of the constructions and comprise the base data for the higher level of implementations A set of KPIs to design for productivity, resource efficiency, and safety This deliverable will describe the developed KPIs to design for productivity resource efficiency and safety together with guidelines for their applications The report will also describe the exemplary implementation of the KPIs on a few selected demonstration projects Safety and Privacy for digital twins in the construction industry The deliverable will report the identified privacy and security requirements of the industry and will describe how these requirements have been detailed for implementation into the ASHVIN platform Data fusion methods and digital twin based IoT data processing pipelines This document will report on the results of Tasks 32 and 34 describing the required data fusion mechanism to combine different collected data and suggests digital twin pipelines for updating digital twin models and ensuring possibilities to compare and match asdesigned with asbuilt data ASHVIN Impact Master Plan This document outlines the overall project dissemination communication and exploitation strategies providing a specific action overview for the contribution to standardisation initiatives Evaluation and recommendations for an evidence-based design for productivity, resource efficiency, and safety based on historical digital twin data. The deliverable will provide a detailed summary of knowledgebased system as well as machine learning attempts successful and unsuccessful and develop a balanced discussion of the possibilities for evidencebased design with recommendation for databases for the longterm storage of past digital twin data Digital twin based geo-monitoring The document will report concepts for advanced sensor based geomonitoring concepts for establishing accurate digital twin models of soil ground conditions and foundation structures A set of KPIs to plan and monitor productive, resource efficient, and safe construction sites This deliverable will describe the developed KPIs to plan and control productive resource efficient and safe construction sites together with guidelines for their applications The report will also describe the exemplary implementation of the KPIs on a few selected demonstration projects Dissemination and Communication Interim Report Midterm documentation of the actions taken and outcomes achieved in relation to the promotional strategies during the first period of the project having D41 as the baseline This will include the assessment of the Agile Stakeholder Management strategy SHM digital twin requirements for residential-, industrial buildings and bridges. This deliverable presents a report of the needs for structural control on buildings initial imperfections deflections at service stability rheology and on bridges vibrations modal shapes deflections stresses based on stateoftheart imagebased and sensorbased techniques Impact Assessment and Exploitation Interim Report Midterm documentation of the actions taken and outcomes achieved in relation to the promotional strategies during the first period of the project having D41 as the baseline This will include the assessment of the Agile Stakeholder Management strategy Standardization Plan We will review present standards existing and under development relevant for Digital Building Twins to identify gaps and impact on ASHVIN project results Other (1) Launch version of the ASHVIN platform This deliverable is the IoT platform that will provide the core of the ASHVIN digital twin platform itself which will be available from the start of the project This deliverable includes the description of the launch version of the IoT platform the user manuals and practical recommendations for implementation The launch version of the IoT platform includes the required IoT main data management and securityprivacy functionalities to allow demonstration projects to start data collection early on Publications Conference proceedings (8) On the digital twinning of routine load tests in railway bridges. Case study: high speed railway network, Extremadura, Spain Author(s): Chacon, R.; Posada, H.; Ramonell, C.; Sierra, P.; Rodriguez Gonzalez, A.; Koulalis, I.; Ioannidis, K.; Vrochidis, S.; Tomar, R.; Freitag, S.; Wagmeister, S.; Teodorovic, M. Published in: International Conference on Bridge Maintenance, Safety and Management, Issue 2022, 2022 Publisher: CRC Press DOI: 10.1201/9781003322641-98 Virtual construction with digital twins – The key for leanly planned complex construction systems Author(s): Timo Hartmann Published in: Kongress Zukunft Bau Wien, Issue 2021, 2021 Publisher: Technische Universität Wien Ground-Based interferometer radars for load tests of long-span arch bridges. Case study: Almonte and El Tajo Viaducts, Extremadura, Spain Author(s): Alejandro Rodríguez, J. Fuente, R. Fabregad, R. Chacón, C. Ramonell Published in: International Conference on Bridge Maintenance, Safety and Management, Issue 2022, 2022, ISBN 9781003322641 Publisher: CRC Press DOI: 10.1201/9781003322641-271 Automated pipeline for the analysis of a scale-reduced steel cable net Author(s): Rolando Chacón,Burkhard Krenn,Càrol Puig-Polo Published in: International Colloquium on Stability and Ductility of Steel Structures 2022, Issue 2022, 2022 Publisher: Wiley DOI: 10.1002/cepa.1851 Platology: A Digital Twin Ontology Suite for the Complete Lifecycle of Infrastructure Author(s): Khan, Rehan; Tomar, Rahul; Hartmann, Timo; Ungureanu, Lucian; Chacón Flores, Rolando Antonio; Ibrahim, Ahmed Published in: 29th Workshop on Intelligent Computing in Engineering, Issue 2022, 2022 Publisher: European Group for Intelligent Computing DOI: 10.7146/aul.455.c219 Closing the Gap Between Concrete Maturity Monitoring and Nonlinear Time-Dependent Fem Analysis Through a Digital Twin Author(s): Posada Cárcamo, Héctor José; Chacón Flores, Rolando Antonio; Ungureanu, Lucian; Garcia Carrera, David Published in: 39th International Symposium on Automation and Robotics in Construction (ISARC 2022), Issue 2022, 2022 Publisher: International Association on Automation and Robotics in Construction Geometrical digital twinning of a tapered, horizontally curved composite box girder bridge Author(s): Rolando Chacón,Carlos Ramonell,Càrol Puig-Polo,Enrique Mirambell Published in: International Colloquium on Stability and Ductility of Steel Structures 2022, Issue Volume5, Issue4, 2022, Page(s) 52-58 Publisher: Wiley DOI: 10.1002/cepa.1727 Towards Automated Pipelines for Processing Load Test Data On A High-Speed Railway Bridge In Spain Using A Digital Twin Author(s): Ramonell Cazador, Carlos; Chacón Flores, Rolando Antonio Published in: 39th International Symposium on Automation and Robotics in Construction (ISARC 2022), Issue 2022, 2022, Page(s) 231-237, ISBN 978-952-69524-2-0 Publisher: International Association on Automation and Robotics in Construction Peer reviewed articles (1) Open‐source terrestrial laser scanner for the virtualization of geometrical entities in AEC classrooms Author(s): Carlos Ramonell; Rolando Chacón Published in: Computer Applications in Engineering Education, Issue Volume30, Issue4, 2022, Page(s) 1009-1021, ISSN 1099-0542 Publisher: Wiley DOI: 10.1002/cae.22499 Searching for OpenAIRE data... There was an error trying to search data from OpenAIRE No results available