Skip to main content
European Commission logo
español español
CORDIS - Resultados de investigaciones de la UE
CORDIS
Contenido archivado el 2024-04-30

Flexible systems for footwear manufacturing within the supply chain

Objetivo



Traditional planning methodologies are becoming increasingly inadequate for Footwear manufacturers. The demands of modern production, eg quick response, team working, sourcing of partially completed goods, multiple manufacturing sites and facilities and the role in the supply chain are not handled by standard MRP systems. In addition these systems are often beyond the capability of the SME to administer given their limited resources. This project proposes the development of a prototype planning and control system which is both flexible enough to meet changing demands, and is powerful enough to perform all of the functions required whilst still retaining ease-of-use for SME's. The benefits of a successful conclusion will apply not only to the Prime proposer and partners, but also to any SME operating in a similar environment. These benefits are likely to include shorter lead times within the Supply Chain; better control of purchasing of materials and components; shorter manufacturing cycle times; better use of manpower and plane and equipment and an overall reduction in operating costs.

Convocatoria de propuestas

Data not available

Régimen de financiación

EAW - Exploratory awards

Coordinador

H. Orton & Sons Ltd.
Aportación de la UE
Sin datos
Dirección
2,Oxford Street 2
LE9 7BB Earl Shilton
Reino Unido

Ver en el mapa

Coste total
Sin datos